ML20151S978

From kanterella
Revision as of 22:01, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-461/88-11 on 880405-08. Certain Activities Appeared to Be Potential Violations. Enforcement Conference Scheduled for 880421 to Discuss Insp Findings
ML20151S978
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/21/1988
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20151S982 List:
References
EA-88-111, NUDOCS 8804280541
Download: ML20151S978 (2)


See also: IR 05000461/1988011

Text

_ _ _ - _ _ _ _ _ _ _ _ _ _

'

, 'D CP

h!

APR 21 1998

Docket No. 50-461

EA 88-111

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the special safeguards inspection conducted by Mr. J. L. Belanger

of this office on April 5-8, 1988, of activities at Clinton Power Station

authorized by NRC License No. NPF-55 and to the discussion of our findings with

Mr. Hall at the conclusion of tne inspection.

During this inspection, certain of your activities appeared to be a potential

violation of NRC requirements. You will be notified by separate correspondence

of our decision regarding enforcement actions based on the findings of this

inspection. No written response is required until you are notified of the

proposed enforcement action. However, an enforcement conference to discuss

the inspection findings has been scheduled for April !1,1988.

Areas examined during this inspection concern a subject mattre which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.Pl. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any quest;ons you have concerning this inspection.

Sincerely, g

Charles E. Norelius, Di+ector

Division of Radiation Safety

and Safeguards

Enclosure: Inspection Re

No. 50-461/88011(DRSS) port gne;M C. Can bins

gj

(UNCLASSIFIED SAFEGUARDS INFORMATION) y n h M

See Attached Distribution Pa00 is Decontrulled

)4s ,

RIII -

RIII RIII RIII R II RIII RIII

Mal ett

v$

'

Belan r/jlr Dr ed 00 er An rson

~ na se

$R D K 0

p1

I

W

.,--.

_ _ _ _ _ _ .

,

'

.-  ;

-

.

.,

f; Illinois Power Company 2 APR 21048

9

\,.

Distribution ,

,

L cc w/ enclosure:

1

D. P. Itall, Vice President, Clinton i

Power Staticn

R. D._ Freeman, Manager - Nuclear Station '

' '

Engineering Depar tment Clinton Power

NRR/DRIS/SGB

NRR/DRIS/ SIB

J. Lieberman, OE

L.-Chandler, DGC

-?. Miraglia, NRR

cc w/ enclosures, w/o

UNCLASSIFIE0 SAFEGUARDS

INFORMATION:

DCD/DCB (RIDS)

Licensing Fee Management Branch

Sheldon Zabel, Esquire Schiff, Hardin

and Waite

L. Larson, Project Manager, General

Electric Company

Chairman of DeWitt County

Illinois Department of Nuclear Safety

D. Schofer, Project Managen, Sargents

and Lundy Engineers

Resident inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

'

Utilities Division

H. S. Taylor, Quality Assurance

h Division, Sargent and Lundy

Engineers

David Rose 5latt, Governor's

.

Office or Consumer Services

a_