ML20151S978
| ML20151S978 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/21/1988 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20151S982 | List: |
| References | |
| EA-88-111, NUDOCS 8804280541 | |
| Download: ML20151S978 (2) | |
See also: IR 05000461/1988011
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _
'
'D CP
,
h!
APR 21 1998
Docket No. 50-461
EA 88-111
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the special safeguards inspection conducted by Mr. J. L. Belanger
of this office on April 5-8, 1988, of activities at Clinton Power Station
authorized by NRC License No. NPF-55 and to the discussion of our findings with
Mr. Hall at the conclusion of tne inspection.
During this inspection, certain of your activities appeared to be a potential
violation of NRC requirements.
You will be notified by separate correspondence
of our decision regarding enforcement actions based on the findings of this
inspection.
No written response is required until you are notified of the
proposed enforcement action. However, an enforcement conference to discuss
the inspection findings has been scheduled for April !1,1988.
Areas examined during this inspection concern a subject mattre which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protected in
accordance with the provisions of 10 CFR 73.Pl. Consequently, our report of
this inspection will not be placed in the NRC Public Document Room.
We will gladly discuss any quest;ons you have concerning this inspection.
Sincerely,
g
Charles E. Norelius, Di+ector
Division of Radiation Safety
and Safeguards
Enclosure:
Inspection Re
gne;M C. Can bins
No. 50-461/88011(DRSS) port
gj
(UNCLASSIFIED SAFEGUARDS INFORMATION)
h
M
y n
Pa00 is Decontrulled
See Attached Distribution
)4s
,
RIII
RIII
RIII
RIII
R II
RIII
RIII
-
Belan r/jlr
Dr
ed
00 er
An rson
Mal ett
~
na
se
v$
'
$R
I
p1
W
D
K
0
. , - - .
_ _ _ _ _ _ .
,
'
.-
-
.
.,
f;
Illinois Power Company
2
APR 21048
9
\\,.
Distribution
,
,
L
cc w/ enclosure:
D. P. Itall, Vice President, Clinton
i
1
Power Staticn
R. D._ Freeman, Manager - Nuclear Station
'
Engineering Depar tment Clinton Power
'
'
NRR/DRIS/SGB
NRR/DRIS/ SIB
J. Lieberman, OE
L.-Chandler, DGC
-?. Miraglia, NRR
cc w/ enclosures, w/o
UNCLASSIFIE0 SAFEGUARDS
INFORMATION:
DCD/DCB (RIDS)
Licensing Fee Management Branch
Sheldon Zabel, Esquire Schiff, Hardin
and Waite
L. Larson, Project Manager, General
Electric Company
Chairman of DeWitt County
Illinois Department of Nuclear Safety
D. Schofer, Project Managen, Sargents
and Lundy Engineers
Resident inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
'
H. S. Taylor, Quality Assurance
h
Division, Sargent and Lundy
Engineers
David Rose 5latt, Governor's
.
Office or Consumer Services
a_