ML20154H496

From kanterella
Revision as of 02:14, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1988 for Waterford 3
ML20154H496
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1988
From: Burski R, Centolanzi P
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809220026
Download: ML20154H496 (7)


Text

.

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 AUGUST 1988 The unit operated at an average rcactor power of 99.5% and experienced no shutdowns or significant power reductions, ffk' kbob - g2 R

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1988, there were no pressurizer safety valve failures or challenges.

o

,.. . ,- OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA y DATE: SEPTEMBER 1988 OPERATING STATUS

1. Docket: 50-382 I Notes
2. Reporting Period: August 1988
3. Utility

Contact:

._ PATRICK CENT 0LANZI Phone Number: (504) 464-3360

4. Licensed Thermal Power (tnt): 3390 _
5. Nameplate Rating (Gross Hwe): 1153
6. Design Electrical Rating (Net }Ne): 1104
7. Maximum Dependable Capacity (Gross tNe): 1120
8. Maximum Dependable Capacity (Net t%): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
10. Power Level To Which Restricted, if Any (Net tNc): NONE
11. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
12. Hours In Reporting Period 744.0 5855.0 25752.0
13. Number of Hours Reactor Was Critical 744.0 4348.9 20453.5
14. Reactor Reserve Shutdown Hours , 15 Hours Generator On-Line 744.0 4211.8 20026.2
16. Unit Reserve Shutdown Hours y 9(1 s

, q/ \ -

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative

17. Gross Thermal Energy 2,509,305 13,610.258 63,071,239 Generated (MWH)
18. Gross Electrical Energy ,

834,940 4,555,950 21,936,760 Generated (MWH)

19. Net Electrical Energy 797,197 4,324,225 20,848,694 Generated (MWH)
20. Unit Service Factor 100.0 71.9 77.8
21. Unit Availability Factor 100.0 71.9 ___ 77.8
22. Unit Capacity Tactor 99.7 68.7 75.3 (Using MDC Net)
23. Unit "apacity Factor 97.1 66.9 73.3 (Using DER Net) ~
24. Unit Forced Outage Rate 0.0 3.6 6.9
25. Unit Forced Outage Hours 0.0 157.2 1493.5
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
27. If Shut Down At End of Report Period, Estimated Date Of Startup:
28. Units in Test Statur (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85__

COMMERCIAL OPERATION "'

__ _ 24/85

.. e.-

AVERAGE DAILY UNIT P0kIR LE\TL DOCKET NO. 50-382 '

UNIT WATERFORD 3 DATE SEPTEMBER 1988 COMPLETED BY PATRICK CENT 0LANZI f TELEPHONE 504-464-3360 MONTH AUGUST 1983 ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (tNe-Net)

(?Ne-Net) 1 1070 17 1076 j 2 1074 18 1075  ;

3 1077 19 __

1074 1

4 1079 20 1036 1

! 5 1077 21 1073 6 1078 22 1071 7 1078 23 1072 8 1077 24 1071 i 9 1076 25 1067 ,

10 1080 26 1066 11 1078 27 1066 1

r 12 1067 28 1065 13 1068 29 1066 14 1077 30 1064 15 1076 31 1065 16 1077 INSTRUCTIONS r On this format, list the ave. age daily unit power level in MVe-Net for each day in the reporting month. Coepute to the nearest whole megawatt.

4

l MM UU l

4 UNIT SIIUTDOWNS AND P0kER REDUCTIONS .

REPORT FOR AUGUST 1988 -

DOCKET NO 50-382 -

UNIT NAME WATERFORD 3 l DATE $5~TEMBER P 1988- -

l COMPLETED BY likTHICA7 fNT0l W21 TELEPHONE 564-464-3360 Method of Licensee Cause & Corrective  !

Duration Shutting Event System Component Action to i No Date Type l (llOURS) REASON 2 Down Feactor3 Report # Codei Code 5 Prevent Recurrence No shutdowns or power reductions this month.

l 1

l l

l 1 2 3 F: Forced Reason: Method S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4 E-Operator Training & 5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5 F-Administrative IEEE Std. 803A-1983 G-Cperational Error (Explain) li-Other (Explain)

LOUISlANA / sireAnossesinest . e. o. sox e0340 POWE A & L1GHT NEW ORLE ANS, LOUISIANA 70160 * (504) 595-3100 Ut ON bUYES s

September 15, 1988 W3P88-1298 A4.05 QA U.S. Nuclear Regulatory Commitgion ATTN: Document Control Denk I Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of August 1988. This rerort is submitted per l Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility I Operating License No. NPF-38, 1

Very truly yours.

/T ]

Q . l at.a)-.

l R.F. Burski Manager Nuclear Safety & Regulatory Affairs RFB:LWL ssf Enclosure cc: R.D. Martin. NRC Region IV h7C Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson i "AN EQUAL OPPORTUNITY EMPLOYER"

-- - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _