05000416/LER-1982-126, Forwards LER 82-126/99L-0

From kanterella
Revision as of 09:59, 6 September 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards LER 82-126/99L-0
ML20070A689
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/01/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070A693 List:
References
AECM-82-576, NUDOCS 8212090326
Download: ML20070A689 (1)


LER-2082-126, Forwards LER 82-126/99L-0
Event date:
Report date:
4162082126R00 - NRC Website

text

,

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 December 1, 1982 JAMES P. McGAUGHY, JR.

ASSISTANT vtCE PRESIDENT Office of Inspection & Enforcement >

U. S. Nuclear Regulatory Commission Region II -m 1, 101 Marietta St., N.W., Suite 3100 o ~_ . O Atlanta, Georgia 30303 o - ;;

,,)

P

Attention: Mr. J. P. O'Reilly, Regional Administrator W -

Dear Mr. O'Reilly:

U

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Inoperable Fire Dams and Penetration Seals LER 82-126/99 L-0 AECM-82/576 In the process of repairing cables in the control room on October 26, 1982, several fire dams and penetration seals were broken. This report is being submitted pursuant to Technical Specification 3.7.7.a. Attached is LER 82-126/99 L-0. An updated report will be su,mitted by February 2, 1983.

Yours truly, Go t ct ent fO W f f h hav 58 cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. huclear Regulatory Commission Washingten, D. C. 20555 8212090326 821201 PDR ADOCK 05000416

... amber Middle South Utilities System C 0,$gc1AL6& W