MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
- - ,
e OPERATING DATA REPORT ,
DOCKET NO. 50-747 DATE 12-4-91 CO5!PLETED BY r e nich TELEPl!ONE "014-526-5155 OPERATING STATUS Not'5
!. Unit Name: Indian Point Station Unit No. 2 -
- 2. Reporting Period:
November, 1981
- 3. Licensed Thermal Power (51W ): 2758 I;one
- 4. Namep!ste Rating (Gross 51We): 1013
- 5. Design Electric =1 Rating (Net 51We): 873
- 6. 51sximum Dependable Capacity (Gross S!We):
900
- 7. S!sximum Dependable Capacity (Net 51We):
- 8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7)Since Last Report Give Re . sons:
nin
- 9. Power Level To Which Restricted. lf Any (Net S!We): "nMr
- 10. Reasons For Restrictions. If Any: M/A ,I l
This 5fonth Yr..to.Date Cumutstive [
- 11. Hours In Reporting Period 720 8016 65041 l
- 12. Number Of Hours Reactor Was Critics! 432.95 3413.62 41577.53 L.
- 13. Reactor Reserve Shutdown Hours 0 54.64 1527.43 c -
- 14. Hours Generator On-Line 426.77 3206.62 40367.00
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Therms! Energy Generated (51WII) 1145536 8467303 104275731
- 17. Gross Electrical Energy Generated (51WH) 365330 _,
2561170 32181216
- 18. Net Electrical Energy Generated (51WH) 347791 2422312 30651636
- 19. Unit Service Factor 59.3 41.0 62.1 !
- 20. Unit Availability Factor 59.3 41.0 62.1
{
- 21. Unit Capacity Factor (Using SIDC Net) 55.9 35.3 54.8 !
- 22. Unit Capacity Factor (Using DER Net 1 55.3 34.6 54.O I
- 23. Unit Forced Outage Rate ,
- 24. Shutdowns Scheduled Over Next 6 Stunths (Type.Date.and Duration of Esch1:
nnnn
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: "/" i
- 25. Units In Test Status (Prior o Commercial Operation): Forecast Achiesed '
=
INITIA L CRITICALITY INITIA L ELECTRICITY CON!stERCIA L OITR ATION N/A 8112240175 811215 PDR ADOCK 05000247 ggf77, (
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-247 _
. UNIT IugIA" POT"? STATION l U
DATE nit- .
AI./ 4 / o A
. No. 2 i
COMPLETED BY E.P. Eich 1
TELEPIIONE 91 A M M-91 sq MO$Tl! November 1981 .
, . l
- DAY AVERAGE DAILY POWER LEVEL DAY
~ AVERAGE DAILY POWER LEVEL l (MWe Net) (MWe. Net) !
- 1. R91 37 0 776 0 j 2 18 .
bl 3 _ 653 .
19 0 ,
{.
4 'Ad4 20 0 I w
5 847 21 0 .
i; H!
6 330 22- n 7 450 23 0
~
8 845 2g 556 -
l :
9 850 25 857 10 949 26 855 - I 1.
!. 11 734 851 * .
27 . ! lV .J 0 857 12 2S . .
" .l-
~
13 O -
858 .
29 _
t 14 n 859 !:
30 ,-
15 - 0 d 33 _
l -
! 16 e .,-
I l
t J e -
l INSTRUCTIONS. ,
j On this format. fist the average daily unit power Icve! In MWe. Net for each day in the reporting month. Compute to !
.the ricarest whole megsws:t. , ,;
.i I'
(9/77) 1 -
-d l -
l l l
\
1 i
% i f
! i L.
UNITSilUTDOWNS AND POWER REDUCI10NS , '
DOCKETNO. 50-2'?
UNIT NAME .r. " nit "o.2 REPORT MONTil NOVEMBER 1981 CbMPLETED BY F, TELEPilONE a.'-5205155 e.
- , .! E 3 Ak Licensee Hat, ~,, Cause & Correvive No. . Date g 3g i jg5 Event g "L2 os Action o H 5 wU u$U
$ :,,, Ji gg g Report # Present Recurrence O
12 11/11/81 F 290.47 A 2 81-030 CB PumpXX Repair No. 23 reactor coolant (For info). X. Pump Scal. ~
13 ,11/24/81 F 2.76 A 3 r!J !!TEXCII N/A p 2 2 Steam Generator !!i Loved.
T -
/
I 2 3 4 F: Forced Reason: Method:
- S Scheduled Exhibit G-Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Dass B Maintenance of Test '2 ManualScram. Entry Shests for Licensee C Refueling 3-Automatic Scram. Event Report ILER) File INUREG-
. D-Regulatory Restriction . 4-Other(Explain) 0161)
E-Operator Training & License Examination F Administrative '- -
' 5 G-Operational Error (Explain) E.shibit I Same Source 19/77) Il-Other (Explain)
+
SUMMARY
OF OPERATING EXPERIENCE November, 1981 Docket No. 50-247 Late: 12/8/81 Completed Dy: J. Curry Telephone: (914) 52G-5235 November started with Indian Point No. 2 operating at 100% reactor power.
On November 2, 198L the load was reduced briefly to repair a leak in the cross under piping to No. 21A moisture separator reheater. Unit No. 2 operated at full load until Wednesday evening, November 11, when a failure of the No I coal on No. 23 reactor coolant pump required a plant chutdown. After reaching cold shutdown conditions on Friday, November 13, Unit No. 2 reactor coolant system was depressurized and drained :;or repairs to the controlled leakage coals
)
on No. 23 reactor coolant pump. Repairs to the seals w?re completed and during reactor coolant heatup to the hydrostatic test temperatt:re on Thursday, November 19, one of the pressuri cr code safety valve (PCV-464) lifted pre-maturely at approximately 2350 psig. The system was brot ght to the cold shut-down condition and the valve reset to the correct lifting pressure .
After the conduct of a successful reactor coolant system hydrostatic test and replacement of No. 22 high head safety injection pump with a spare, Unit f No. 2 was returned to service on Monday, November 23, but tripped automatically !
approximately forty-five minutes later due to high drum icvel in No. 22 steam I generator. The unit was again returned to service on Tuesday, November 24 and the load raised to the 100% reactor power level and remained at this level for the remainder of the month.
l
~
~
MECHANICAL AND ELECTRICAL MAINTENANCE Docket No. 50-247'
- Indian Point Unit No. 2 November, 1981 Date Component MWR Malfunction Corrective Action 11/19/81 No. 23 Reactor Coolant 2NS-6151 tb. 1 Seal Failure Replaced ceals Punp 11/22/81 No. 22 High Head Safety 00042 Pump Seized Replaced with spare punp Injection Pump O
_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _____..____t. _ _ . _ ____ __ _ _ _ _ _ _ _ a .shaush- (M _
' ' '