Monthly Operating Rept for May 1996 for Waterford 3
ML20117M947
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/31/1996
From: James Fisicaro, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0094, W3F1-96-94, NUDOCS 9606190151
Download: ML20117M947 (7)


Text

e l

4

, . . Entergy Oper;tions, Inc.

Kolona. LA 70066 '

To! 504 739 6242 i

mes J. Fisicaro

%%l"f' W3F1-96-0094 A4.05 I

PR June 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which Lovers the operating statistics for the month of May,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, f

J.J. Fisicaro Director Nuclear Safety JJF/DFUssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center)

NRC Resident inspectors Office 9606190151 960531 PDR ADOCK 05000302 R pyy 3gg_,,y

'II

l NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for May,1996 The unit operated at an average reactor power level of 92.3% having experienced one reactor trip during the period.

J A

1 l

i i

)

l n% Page t of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES

WATERFORD 3 for May,1996 There were no pressurizer safety valve failures or challenges experienced during the month.

i e

i e

e k

i r

l a

i 1

)

MM Page 2 of 6

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 6,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS

1. Reporting Period  : May,1996 Gross Hours in Reporting Period  : 744
2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) 1,075 Design Electrical Rating (Net MWe)  : 1,104
3. Power Level to which Restricted (if any)(Net MWe)  : N/A
4. Reason for Restriction (if any) N/A ,

i THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 710.7 3,613.7 79,646.4
6. Reactor Reserve Shutdown Hours o.0 0.0 0.0
7. Hours Generator was On-line ss5.7 3,5ss.7 7s,s74.s
8. Unit Reserve Shutdown Hours o.o 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,326,692 12,155,2s7 260,s51,72s
10. Gross Electrical Energy Generated (MWH) 781,560 4,10s,830 as,967,200
11. Net Electrical Energy Generated (MWH) 747,772 3,939,976 s2,945,791 '
12. Reactor Service Factor 95.5 99.1 a5.0
13. Reactor Availability Factor 95.5 ,

99.1 s5.0

14. Unit Service Factor 92.2 98.4 s4.0
15. Unit Availability Factor 92.2 98.4 s4.0 16.' Unit Capacity Factor (using MDC) 93.5 100.5 s2.4
17. Unit Capacity Factor (using DER) 91.0 97.9 a0.2
18. Unit Forced Outage Rate 7.8 1.s 3.4 w r 3 a.

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 6,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504)464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 3,647 93,672
23. Unit Forced Outage Hours ss.3 ss.3 2,731.s
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120 l 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, .

l give the reasons :

N/A i

I )

1 hw Page : 4 of 6

s -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 6,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 Reporting Period ; May,1996 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,106 16 1,103 2 1,106 17 920 3 1,106 18 (41) 4 1,106 19 (43) 5 1,106 20 544 6 1,106 21 1,100 7 1,106 22 1,101 l

8 1,106 23 1,100 9 1,107 24 1,100 l

1 10 1,104 25 1,100 11 1,106 26 1,100 12 1,106 27 1,099 13 1,105 28 1,099 14 1,104 29 1,099 l

15 1,104 30 1,099 l 31 1,096 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i I

-MW Page : 5 of 6

- _=..-=-2_ _---

.. s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 6,1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 REPORTING PERIOD : May,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions 96-01 960517 F 58.3 A 3 Failure of the voltage regulator in the 'A' MG (Motor Generator)

Set caused the exciter field current & resulting output voltage to increase. This caused the 'B' MG Set to trip off shortly before the fuse blew on the 'A' MG Set. All power was lost to the CEAs, allowing the CEAs to fully insert, scraming the reactor.

Refer to LER 96-006 for more details.

l e en TYPE REASON F - Forced A - Equipment Failure (explain) i S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction  :

"* l E - Operator Training and METHOD License Examination 1 - Manual F - Administrative

, 2 - Manual Scram G - Operational Error (explain) l 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period i 5 - Power Reduction 6 - Other (explain)

@tW6 Page: 6 of 6