ML20129J091

From kanterella
Revision as of 02:52, 6 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 1 to 10CFR50,App R Review Rept,Per C Trammell Request.Amend Provides Addl Mods in Fire Area E1,withdraws 850208 Exemption Request for Fire Area R1 & Incorporates 850306 Response to 850124 Ltr Re Safe Shutdown Review
ML20129J091
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/31/1985
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20129J093 List:
References
TAC-55560, TAC-55831, NUDOCS 8506100011
Download: ML20129J091 (2)


Text

..

- M -

m l!lll PortlandGeneralBectricCoiiiptsiy 1

Ebrt D Wthers Vce Resdert May 31, 1985 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN: Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington DC 20555

Dear Sir:

Amendment 1 to 10 CFR 50 Appendix R Review This letter provides thirteen (13) copies of Amendment 1 to the 10 CFR 50 Appendix R Review Report for the Trojan Nuclear Plant.

Preparation and submittal of this amendment was previously discussed with, and requested by, Mr. Charles Tramell of your staff. The purpose of this amendment is to incorporate the following:

1. PGE verbal connitments to provide additional modifications in Fire Area El (electrical penstration area outside Containment) as part of the exemption requested for that .trea (Section 5.2.2 of the Report).
2. PCE letter dated February 8, 1985 withdrawing the exemption request for Fire Area R1 (Section 5.2.4 of the Report).
3. PGE letter dated March 6,1985 responding to an NRC letter dated January 24, 1985, which transmitted questions related to the safe shutdown review.
4. Relevant information from continuing PGE design review efforts on Appendix R as follows: g
a. Structural steel analyses for the Fuel and Auxiliary Buildings (Section 2 and Appendix C).
b. Updated combustible loading table (Table 2-2).

8506100011 850531 PDR ADOCK 05000344

! 0ph F PDR

}/J 121 SW Symon Etwt Portwd Omgon 97204

Pbrtland General BechicCuingmy Mr. James R. Miller May 31, 1985 Page 2

c. Updated review results for safe shutdown / spurious operation equipment (Table 3-1), associated circuit resolutions (Tables 3-3 and 3-4a), and safe shutdown success trees (Figures 3-42 through 3-49).
d. Designation of a new fire area (A4a) in Fire Area A4.
5. Relevant references to NRC Generic Letter 85-01 in lieu of previous references to the 1984 NRC Regional Workshops on Appendix R.
6. Typographical corrections and minor technical clarifications and corrections.

We would be pleased to discuss any questions or comments you may have regarding this amendment.

Sincerely, a m

.__m_ *_

Bart D. Withers Vice President Nuclear Attachments c: Mr. Lynn Frank, Director State of Oregon Department of gnergy

  • Mr. John B. Martin i Regional Administrator, Region V '

U.S. Nuclear Regulatory Commission

l a

od to

. ?

d  % .

gE 0

i-

-