ML20138H530

From kanterella
Revision as of 23:49, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Preoperational Physical Security Insp Rept 50-440/85-83 on 851202-03.No Violation Noted
ML20138H530
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/11/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20138H535 List:
References
NUDOCS 8512170233
Download: ML20138H530 (2)


See also: IR 05000440/1985083

Text

I

e O

DEC 11 1985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the announced preoperational physical security inspection

conducted by Mr. J. R. Kniceley of this office on December 2-3, 1985, of

activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC

Construction Permit No. CPPR-148 and to the discussion of our findings

with Mr. J. J. Waldron and other members of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73,' Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

-

W. L. xelso , Chief

Nuclear Materials Safety

and Safeguards Branch

Enclosure: Inspection Report'

No. 50-440/85083(DRSS) i

See Attached Distribution

NI

B512170233 g20 40 Enclosure contains

PDR ADOCK PDR SAFEGUARDS INF0Pd4ATION

G UP on separation this

a M90 is Decarol.c;; icd

' *

The Cleveland Electric Illuminating 2 DEC 11 1985

Company

Distribution

cc w/ enclosure:

Perry Information Control

Mail Zone R290

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

9p Enclosure contains

RIII RIII RIII

RIIIg>(#,

Kniceley/kja

Md

Creed

M

Knop A) k\son

SAFEGUARDS INFORMATION

Upon separation this

page is Decontrolled

12/10/95