ML20138J390

From kanterella
Revision as of 18:31, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-440/85-61 on 850912-16.No Violation Noted
ML20138J390
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/24/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20138J395 List:
References
NUDOCS 8510290330
Download: ML20138J390 (2)


See also: IR 05000440/1985061

Text

a

. r

~.

OCT. 241985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by J. F. Norton of this -

office on September 12 through 16, 1985, of activities at Perry Nuclear Power

Plant,' Unit 1, authorized by NRC Construction Permit No. CPPR-148 and to the

discussion of our findings with Mr. C. Shuster and others at the conclusion of

the inspection.

The enclosed ccpy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

,

Sincerely,

C M Ci=1 Signed by J.'3~ U:rri:en

J. J. Harrison, Chief

l Engineering Branch

Enclosure: Inspection Report

No. 50-440/85061(DRSS)

See Attached List For Distribution

!

i

I 8510290330 851024

'

PDR ADOCK 05000440

l G PDR

I

1

. 4 60/

. . _ -. _ ~ - . .

'

.

The Cleveland Electric Illumination 2 OCT 241985

Company

Distribution

cc w/ enclosure:

J.'J. Waldron, Manager, Perry

i Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

'

Licensing Fee Management Branch

' Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

, Department of Health

!

i

$

i

!

!

l

l

,

I

i

RIII RIII / RI L,' R

W po r @

Norton/mj

Knop d- (fgn t4(v '

illianis H ris

p/ t/on

09/30/85 af fe

BN l

4 fc kltT. ,

, , . ,. . - - . - - . . . . . . _ . _ . . - ,. ....-.- .