Forwards Insp Rept 50-423/85-71 on 851111-22.No Violations Noted.Conditions Re Staff Performance in Preparing Surveillance & Related Procedures Noted.Parameter,Inc Technical Review Rept Encl
ML20140A929
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/14/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20140A934 List:
References
NUDOCS 8601230430
Download: ML20140A929 (2)


See also: IR 05000423/1985071

Text

_ _ _ _ .

I -

.

4

JAR I 41956

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: NRC Region I Report 50-423/85-71 (11/11-22/85)

This forwards the NRC report of follow-up inspection of surveillance procedure ade-

<

quacy. The inspection effort was performed by an NRC contractor.

Considering the operating mode by operating mode approach to procedure implementa-

tion, the inspection concluded that surveillance procedure status was acceptable.

That conclusion was based on the assessment that procedures were sufficient to

support existing activities and the ongoing effort to finalize procedures was suf-

ficient to provide acceptable final procedures when they would be needed.

This inspection identified conditions related to the performance of your staff in

l preparing surveillance and related procedures. Such conditions can be directly

applicable to facilitating adherence to procedures and the associated requirements

and commitments. In addition to follow-up on specific items, we will be using

overall adherence to Technical Specifications and commitments to evaluate your

ongoing performance in such matters.

,

We wish to call your attention, in particular, to the positioning of local stop

! (root) valves for instruments. As noted in open item 85-37-03 (Report Pages 6 and

7), for Millstone 3 instruments which are on-scale, the root valves are aligned

and lock-wired in position by a single, identified technician. This fulfills your

commitment and provides accountability and repositioning controls. We believe that

there is substantial merit in also providing a separate check of valve positioning.

That conclusion is based in part on mispositioned root valves having provided on-

scale indication at an operating plant due to valve leak-by. Such leak-by, or

partial valve opening / closing, can provide on-scale indication while preventing

the instrument loop from meeting time response requirements. Please review your

controls in this regard and let me know what was found.

No violations of NRC requirements were identified.

,

$

o ADOCK O W 423

PDR g g

,

SEDI

_. _ - . _ _- . _

.. -- . - -. - - - . . . -.

. .

?* s,

.

.

Northeast Nuclear Energy Company 2

-

JAN 2 41986

Your cooperation with us is appreciated.

Sincerely,

Ori..i: 1Si;ned373

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

'

,

Enclosure: NRC Region I Report 50-423/85-71

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

i

,

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

,'

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)

i NRC Senior Resident Inspector

1 State of Connecticut

i.

I bcc w/ encl:

} Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

'

DRP Section Chief

G. Walton, SRI, BV-2

T. Shedlosky, SRI, Millstone 1&2

i

'

B. Doolittle, LPM, NRR

L. Bettenhausen, RI

i

J. Durr, RI

T. Elsasser, RI

P. Eselgroth, RI

J. Wiggins, RI

J. Prell, RI

I

4

! RI:DRP RI: RS .

(E5

'

McCabe/meo Bettenhausen W ibger

1/10/86 l//y/gG

ll

1

0FFICIAL RECORD COPY

t

_.-. _ _ . , .-

,_ _ _ - . _ . _ _ _ _ _ . _ _ - - - , _ . . . . _ . _ . , . _ - . - _ . _ _ _ - - _ _