IR 05000423/1985071

From kanterella
Jump to navigation Jump to search
Insp Rept 50-423/85-71 on 851111-22.No Violations Noted. Major Areas Inspected:Surveillance Procedure Readiness for near-term Activities Such as Fuel Load & Plant Heatup & Readiness to Support Later Activities
ML20140A956
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/14/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140A934 List:
References
50-423-85-71, NUDOCS 8601230434
Download: ML20140A956 (1)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

,

Docket / Report:

50-423/85-71 Licensee:

Northeast Nuclear Energy Company Facility Name:

Millstone Unit 3, Waterford, Connecticut Inspection at:

Millstone Unit 3 Onsite Inspection Dates: November 11-22, 1985 Task Completion Date:

January 6, 1986 Inspection Summary:

Scope:

Follow up inspection of surveillance procedure readiness to support plant operations.

The onsite inspection effort was performed by an NRC contractor. This inspection addressed procedural readiness for near-term activities such as fuel load and plant heatup, and readiness to support later activities such as entry into subsequent operating modes.

Findings:

Overall status of procedure preparation for near-term activities was found acceptable (Report Section 3.2).

A large number of procedure revisions to support entry into subsequent operating modes was noted as being needed (Report Sections 3.1 and 3.2).

Technical Specifications, the Facility Safety Analysis Re-port, and the Surveillance Procedures were found to be compatible (Report Section 3.0).

Licensee programs and plans were found generally effective in correcting

}

and preventing recurrence of identified discrepancies (Executive Summary).

No

!

violations of NRC requirements were cited.

Numerous NRC follow-up items were identified.

.

i l