|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062E4151990-11-16016 November 1990 Forwards H Myers 901019 Request for Info Re Plant Welds for Appropriate Action ML20217A2531990-11-15015 November 1990 Requests Info Re Surety Bond & Status of Eua Power Interest in Surety Bond ML20058E6871990-10-29029 October 1990 Ack Receipt of in Response to NRC Announcing Intent to Perform Team Insp of Maint Program on 901203-14.Subj Insp Date Changed to 910128-0208 Due to Various Complications ML20058D6061990-10-24024 October 1990 Forwards Safety Insp Rept 50-443/90-17 on 900905-1014. Actions Taken on Previous Insp Findings Found to Be Adequate IR 05000443/19900181990-10-17017 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-18 ML20058A3461990-10-17017 October 1990 Informs That Util Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-08,Item 2.2 'Vendor Interface for Safety-Related Components,' Acceptable ML20058B8081990-10-12012 October 1990 Informs That SW Kessinger Scheduled to Participate in NRC 901022 Requalification Exam IR 05000443/19900151990-10-0202 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-15 ML20059N8241990-10-0101 October 1990 Informs of 901203-14 Maint Program Team Insp & Forwards NRC Temporary Instruction 2515/97,Rev 1 ML20059L8831990-09-21021 September 1990 Forwards Safety Insp Rept 50-443/90-16 on 900730-0904.No Violations Noted ML20059H0601990-09-0707 September 1990 Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor ML20058P7851990-08-16016 August 1990 Forwards Safety Insp Rept 50-443/90-15 on 900625-0729 & Notice of violation.Self-assessment Team Rept on Power Ascension Testing Demonstrated Ability to Be self-critical & Results Corresponded Well W/Nrc Assessments of Performance ML20058N1121990-08-10010 August 1990 Provides Comments on Util 900102 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. NRC Does Not Take Any Position on Acceptability of Util Station Gauge Methodology ML20058M6181990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Licensee Has Undertaken Positive Initiatives in Engineering Area, Including Design Basis Document Updates,Safety Sys Functional Insps & Other Engineering Program Improvements ML20055G7591990-07-16016 July 1990 Forwards Safety Insp Rept 50-443/90-13 on 900521-25.No Violations Noted.Weaknesses Noted ML20055G1481990-07-12012 July 1990 Forwards Safety Insp Rept 50-443/90-12 on 900514-0624 ML20055G1771990-07-11011 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation Scheduled for 901015-26. Facility Mgt Responsible for Providing Adequate Space & Accomodations to Properly Develop & Conduct Exams ML20055G0471990-07-0505 July 1990 Forwards Safeguards Insp Rept 50-443/90-14 on 900618-22.No Violations Observed.One Potential Weakness Identified Which Requires Attention to Maintain Effectiveness of Security Program ML20055F5391990-07-0202 July 1990 Forwards Special Power Ascension Team Insp Rept 50-443/90-81 on 900316-0502.Power Ascension Test Program Acceptable ML20055D0941990-06-28028 June 1990 Forwards Transcript of 900619 Public Meeting to Discuss Assessment of Power Ascension Test Program Performance Up to 50% Power Level ML20055D0761990-06-26026 June 1990 Advises of Completion of Review of Proposed Changes to Emergency Action Levels for Plant & Found Rev to Emergency Plan Acceptable W/Listed Understandings ML20055C9991990-06-25025 June 1990 Formalizes Requests Made in Conversation Between J Grillo & Ph Bissett on 900619 Re Planned Insp of Facility EOPs ML20059M9361990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248G1381989-09-26026 September 1989 Forwards SALP Rept 50-443/87-99 for Aug 1987 - June 1989 ML20247N7101989-09-15015 September 1989 Requests Encl Listed Ref Matl for 891211 Evaluation of All Shift Operating Crews on Simulator Using NRC-developed Scenarios ML20247K9511989-09-13013 September 1989 Forwards Safety Inspt Rept 50-443/89-08 on 890701-0817.No Violations Noted ML20246P6341989-09-0606 September 1989 Forwards SER Re Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Reliability for All Domestic Operating Reactors. Existing Intervals for on-line Functional Testing at Plant Consistent W/Achieving High Reactor Trip Sys Availability ML20246N8211989-08-29029 August 1989 Advises That Reactor & Senior Reactor Operator Exams Scheduled for Wk of 891114,per Telcon.Licensee Responsible for Providing Encl Ref Matl by 890901 ML20246F3181989-08-21021 August 1989 Forwards Safety Insp Rept 50-443/89-07 on 890619-23.No Violations Noted.Concerns Re Steam Leakage Problems Through Auxiliary Feed Pump Turbine Control Valves & Leakage Through Certain RCS Pressure Isolation Valves,Expressed ML20246J3601989-08-18018 August 1989 Clarifies NRC Position Re Definition of Extremity for Purpose of Setting Occupational Exposure Limits.Procedures Should Incorporate Applicable Dose Limits of 10CFR20 IR 05000443/19890821989-08-17017 August 1989 Forwards Augmented Team Insp Rept 50-443/89-82 on 890628-30, Enforcement Conference Issues & Related Regulatory Requirements.W/O Insp Rept ML20246A9201989-08-11011 August 1989 Forwards Team Safety Insp Rept 50-443/89-81 on 890612-23.No Violations or Unresolved Items Noted ML20247Q7431989-07-28028 July 1989 Forwards Safety Insp Rept 50-443/89-06 on 890527-0630. Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/89-03 ML20247N5731989-07-28028 July 1989 Forwards Safety Evaluation Updating Status of Onsite & Offsite Emergency Preparedness for Plant.Onsite Emergency Preparedness Acceptable & Adequate for Full Power Operation. Offsite Emergency Preparedness Will Be Acceptable ML20247L9611989-07-18018 July 1989 Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose IA-89-326, Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose1989-07-18018 July 1989 Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose ML20247A9801989-07-14014 July 1989 Forwards Readiness Assessment Team Insp Rept 50-443/89-80 on 890527-0601.No Violations Noted ML20245J2101989-06-23023 June 1989 Confirmation of Action Ltr 89-11,confirming 890623 Telcon. Understands That Listed Actions Will Be Completed Prior to Startup in Response to 890622 Reactor Manual Trip Which Occurred During Natural Circulation Startup Test ML20245F0891989-06-21021 June 1989 Forwards Insp Rept 50-443/89-05 on 890424-0527.Violation Noted Re Storage Location for Svc Water Cooling Water Pump ML20245A9051989-06-15015 June 1989 Forwards SER Re Proposed Implementation of ATWS Rule (10CFR50.62) Requirements.Pending Final Resolution of Tech Spec Issue,Atws Design Proposed by Util in Compliance W/Rule.Design Mods Should Be Completed by Sept 1990 NUREG-0896, Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl1989-06-0909 June 1989 Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl ML20244D0951989-05-26026 May 1989 Forwards License NPF-67,authorizing Operation of Facility to Power Levels Not Exceeding 5% of Rated Power & Limited to No More than 0.75 Effective Full Power Hours ML20247R5731989-05-25025 May 1989 Forwards Insp Rept 50-443/89-03 on 890228-0424 & Notice of Violation.Ack Util Intention to Initiate Appropriate Corrective Action as Described in .Notice of Violation Re Welding Program Deficiencies Not Issued ML20247G3331989-05-21021 May 1989 Forwards Summary of NRC Understanding of How Restrictions on Low Power Physics Testing Will Be Met.Approach Satisfactory ML20247L7401989-05-18018 May 1989 Forwards Safety Insp Rept 50-443/89-04 on 890327-31.No Violations Noted ML20247L9411989-05-0505 May 1989 Provides Guidelines for Review of Emergency Exercise Objectives & Scenario Packages Prior to Plant Partial Participation Emergency Exercise Scheduled for Wk of 890925, Including Schedule ML20247B0911989-05-0303 May 1989 Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda Encl CLI-88-10, Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-101989-05-0303 May 1989 Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-10 ML20246F3911989-05-0202 May 1989 Requests Explanation Re Effect of Paragraph M.5 of Section 6.01 of Supplementary Decommissioning Trust Agreement Re Funds (Strips) to Be Provided for Supplementary Trusts ML20245F5861989-04-25025 April 1989 Comments on Supplemental Decommissioning Funding Financial Assurance Arrangements Presented at 890420 Meeting in Rockville,Md.Listed Info Should Be Included in Formal Response to Comments 1990-09-07
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30
[Table view] |
Text
_ __ _ _ _ _ _ _ _ _
~~V yfC b
((
g g UNITED STATES NUCLEAR REGULATORY COMMisslON W ASHINGTON, D. C. 20555 o 8
\**,l<*/ October 4, 1978 Docket Nos. 50-443 50-444 Mr. W. C. Tallman, President Public Service Company of New Hampshire 1000 Elm Street Manchester, New Hampshire 03105
Dear Mr. Tallman:
SUBJECT:
REQUEST FOR ADDITIONAL FINANCIAL INFORMATION, SEABROOK STATION UNITS 1 AND 2 By letter of May 15, 1978, from Public Service Company of New Hampshire, the applicants amended the License Application filed on March 30, 1973 and requested Commission approval of the partial transfers of the Construction Permits for Seabrook Station, Units 1 and 2. To complete our reevaluation of the financial capability of applicants proposing to increase their ownership participation and our initial evaluation of the financial capability of proposed new owners, we need the additional information requested in the enclosure. The requested information should be provided by November 1,1978. If you cannot meet that date, please advise us of an alternate date by when the requested information will be provided.
Sincerely, b
3Ay teven I. <rga&A
, Chiq A Light Water Reactors B nch 4 Division of Project Management
Enclosure:
Request for Additional Financial Information cc: Listed on following page l S @l&@p79 1
N
- .: v . ~
Public Service Company of New Hampshire l
ces:
John A. Ritscher, Esq.
Ropes and Gray 225 Franklin Street Boston, Massachusetts 02110 Ralph H. Wood, Esq.
General Counsel Public Service Company of New Harrpshire 1000 Elm Street Manchester, New Hampshire 03105 Mr. John Haseltine, Project Manager Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts 01581 Mr. BnJce B. Beckley, Project Manager Public Service Company of New Hampshire 1000 Elm Street Manchester, New Hampshire 03105 Ms. Elizabeth H. Weinhold !.
Bradstreet Road Hampton, New Hampshire 03842 Robert A. Backus, Esq.
O'Neill, Backus, Spielman & Little 116 Lowell Street !
Manchester, New Hampshire 03105 :
i Norman Ross, Esq. * !
30 Francis Street Brookline, Massachusetts 02146 '
Karin P. Sheldon, Esq.
Sheldon, Harmon and Roisman 102515th Street, N. W. '
Washington, D. C. 20005 Ellyn R. Weiss, Esq.
l Sheldon, Harmon and Roisman 102515th Street, N. W.
Washington, D. C. 20005 Laurie Burt, Esq.
Office of the Assistant Attorney General Environmental Protection Division One Ashburton Place Boston, Massachusetts 02111 '
'-~ ~ '
- ~ ~ ' "
p 4
.) .
Public Service Company of New Hampshire ,
ces (continued)
Samuel Chilk Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, D. C. 20555 (Board Notification)
Alan S. Rosenthal, Esq.
Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. John H. Buck Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Michael C. Farrar, Esq.
Atomic Saf ety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Ivan W. Smith, Esq.
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Ernest Salo, Professor
- Fisheries Research Institute - WH-10 College of Fisheries University of Washington Seattle, Washington 98195 Dr. Marvin M..Mann Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 l
t e
ENCLOSURE SEABROOK STATION, UNITS 1 AND 2 DOCKET NOS. 50-443 & 50-444 REQUEST FOR ADDITIONAL FINANCIAL INFORMATION Responses to each of the information items should be provided for each owner and proposed owner if the applicable code letter, i.e., A, B, or C from the following list, is shown in the parenthesis following the information number.
A. Investor-Owned Applicants Montaup Electric Company New Bedford Gas & Edison Light Company Vermont Electric Power Co.
Maine Public Service Company Bangor Hydro-Electric Company B. Municipal and Governmental Applicants '
- Town of Hudson, Massachusetts, Light and Power Department l Massachusetts Municipal Wholesale Electric Company Taunton Municipal Lighting Plant Commission C. Cooperatives Vermont Electric Cooperative, Inc.
4 h',
REQUEST FOR ADDIT _IONAL FINANCIAL INFORMATION SEABROOK STATION, UNIT N05.1 A 2 1 (A B.C) Provide copies of the joint ownership agreement (contract) among .the applicants. The staff will later require copies of the agreement 6fter it is executed. The executed agreement must necessarily be in sub- '
stantial conformity with the agreement previously approved.
Provide a detailed explanation of the provision governing progress pay-ments to be made to the main applicant by each additional participant for its share of all costs of design and construction of Seabrook Station Units 1 and 2. This may be accomplished by reference to pertinent portions of the joint ownership agreement.
2 Provide the following information for each applicant:
a(A) Complete the attached schedule entitled, " Sources of Funds for System-Wide Construction Expenditures During the Period of Construction of Subject Nuclear Power Plant," through the years of earliest estimated completion of Unit Nos 1 and 2. Indicate the c ssumptions upon which the
" Sources of Funds" statement is based. These assumptions include, but ,.
are not necessarily limited to: (a) rate of return on average common stock equity; (b) preferred stock dividend rate; (c) long-term and short- 2 term debt interest rates; (d) market / book ratio with respect to the pro-jected common stock offerings; (e) common stock dividend payout ratio; (f) target and year by year capital structure; (g) resultant SEC and __
indenture interest coverages during each year of the period of construction; and (h) annual growth rate in kWh sales and price per kWh. Provide a brief explanation of the basis for each assumption.
If nuclear fuel for the facility is to be acquired by lease or other arrangement than purchase, briefly describe the terms of the lease or --
other arrangement. -
b(A) Indicate the percentage ownership in the facility and ad difference between this and the participant's percentage entitlement to the electrical capacity and output of the units. Explain the reason for '
the difference, if any.
lc(A) Provide copies of the 1977 Report to Stockholders, copies of the prespectus for the Company's most recent security issue and copies of the most recent 1
SEC Form 10-K. Provide copies of the preliminary prospectus for any pending security issue. Continue to submit copies of the Annual Report J for each year thereafter as required by 10 CFR S0.71(b).
(
d (A) Provide copies of the most recent Officer's Certificete or Net Earnings Certificate prepared in conjunction with the issuance of mortgage bonds or debentures and showing interest coverage calculations using the tests set forth in the applicable indenture. Explain bondable property addition pr visions as they relate to restrictions on the issuance of new long-term cebt. Provide copies of the portions of the indenture relating to interest coverage tests or alternative earnings tests and bondable property additions. Provide calculations of net earnings and interest coverage for the most recent 12-month period using the definitions of net earnings and annual interest requirements (on debt presently outstanding) using the most restrictive test set forth in the mortgage bond indenture.
Assuming a range of interest rates considered redistic by the utility, state the additional amount of first mortgage bonds which could be issued under the most restrictive test based on net earnings as defined by the indenture for the most recent 12-month period.
e (A)
~
If the corporate charter contains a preferred stock coverage requirement, provide copies of that portion of the charter. Assuming a range of dividend yields considered realistic by the utility, state the additional amount of preferred stock that could be issued by applying the most restrictive test for preferred dividend coverage for the most recent 12-month period.
f (A) Prnvide a detailed explar.ation of all other restrictions or constraints on the issuance of short and long-term debt, preferred stock, preference stock and common stock. Short-term debt should include bank lines of credit and commercial paper, if any. Indicate compensating balance require-ments for bank loans.
g (A) Describe the nature and am e of the Company's most recent rate relief action and the anticipated effect on revenues. Provide copies of the rate .
order and opinion. In addia. ion, indicate the nature and amount of any '
pending rate relief action (s). Use the attach . fonn to provide this ;
information. Provide copies of the submitted, financially-related testimony and exhibits of the staff.and company in the most recent 1-'e relief action or pending rate relief request.
Describe aspects of the Company's regulatory environment including, but not necessarily limited to, the following: prescribed treatment of allowance for funds used during construction and of construction work in progress (indicate percentage and amount includea in rate base); form of rate base (original cost, fair value, other); accourting for deferred l income taxes and investment tax credits; and fuel adjustment clauses in effect or proposet.
h(A) Provide a list of generating units, transmission and distribution facilities and general plant projects to be constructed during the period of construction of the subject nuclear power plant, showing the type of facility, net capacity of each generati.19 unit, the dollar amounts to be expended for each facility during each of the years involved, and in-suvice date of each facility.
1
.i(A) Complete the attached form entitled, " Financial Statistics" for the most recent 12-month period and for the years ending December 31, 1977 and December 31, 1976.
3(B) For each municipal and governmental applicant:
- a. Provide a detailed statement of the projected sources of funds and respective dollar amounts for the esplicant's total contributions to the capital costs of Seabrook :tttion, Units 1 and 2. Include a detailed explanaticn of the assumptiens upon which the projc:,ted sources of funds are based.
- b. If the applicant is to finance its ownership share with bonds, indicate the source of funds for payment of interest charges and principal.
- c. Describe the nature, amount, rating, and success of the applicant's most recent revenue and general obligation bond sales. Indicate the current totel outstanding indebtedness in each category for each entity.
- d. Provide copies of the most recent (December 1977 Annual and most recent six-month and 12-mostb) Financial Statements of the applicant.
- e. Is each participant's fercentage ownership share in the facility equal to its percentage entitlement in the electrical capacity and output of l the plant? If not, explain the difference (s) and any resultant effect ,
on any participant's obligation to provide its share of design and construction costs.
- f. Describe the rate-setting authority of the applicant and how that authority may be used to ensure the satisfaction of financial obligations under the Purchase and Ownership Participation Agreements for Siebrook Station.
4(C) For the cooperative applicant:
- a. Indicate the percentage ownership in the facility and any difference between this and the cooperative's percentage entitlement to the electrical capacity and output of the units. Explain the reason for the difference if any.
- b. Provide a detailed statement of the projected sources of funds and respective dollar amounts for the cooperative participant's total contribution to the subject project. Include a detailed explanation of the assumptions upon which the projected sources of funds are based.
. -4_
- c. Indicate the amounts of the respective dollar payments to be made by the cooperative system participant upon execution of the ownership agreement. Provide estimates of the total additional payments to be made subsequent to the execution of the agreement and through completion of the units.
- d. If financing is to be provided through REA guaranteed sources, the applicant must provide copies of favorable letters of intent from REA regarding the proposed REA loans. These must be provided prior to issuance of amendments to the construction permits. Indicate whether the REA has provided loans to the applicant in the past. jr Provide copies of excerpts from state statutes on which the cooperative is relying a: authority to incur debt and to take other actions necessary -
to acquire partial ownership of the subject facility.
- e. Describe the rate-setting authority and rate covenants of the cooperative and how that authority will be used to ensure the satisfaction of financial obligations in relation to the design and construction of Seabrook Station, Units 1 and 2.
- f. Provide copies of the December 1977 and the most recent twelve months financial statements and other relevant financial information.
J k
t h
a
ll 1
I I
1
~ -
I I
T- ~ _ '
C U I R I T
S *
$ $ $ $ $ 1 L t A n T a ,
I l 1
P P A ra Cr r A e I DI w I -
NT o AF P _
I $ $ $ $$ $
ST r ~
E a RE UF l e
1 T e _ _
IW D
NI h ' _
EI t PT c
- a. :
X EW j e
2 t i b n M T s u
. a 0C r S O l 1E e 1 N F TJ1 f CI1 o M r UU o E a R SO s I T e 1 r I I
R l
c u
5F N O O
r o
Y a
e O N CN s F O n n EI o o T 1 N IDT t i t
t l c
. m WWCi MTH T u I r I t
t A Ed(
TT s
_ T SG n $
_ T Y o $ $ $$ 5 A C SU A
'O _ 1 FD D
SI DR I NE I
- UF t F ~
n $ $ 5 a
c FW OI i R l
p SU EI 1
p C A R U I O I S
A $ $ $ $$ $
M R
O _
F _
1 O
R P I i
s s d s d d e l d n s S n r a n o t I u ' S.B r n N
)f u H S
r eti
.t F 5 T o e E
)
1 e A f rp E N gf m H C s eoa l R . t E n e [
8 ibl a d dmc a U s s n M is r R .
.a gn n 'p al E rd i T t I m rn D n ess r l n R un u U $
(
o cr E G
N k: f r s e et T
A ddg i nn d
edi e
tS e l l a m p e
I UaB t o q Q e E n p r QM sR R E k I
C ct obes N kt el nt d n (E
R E
N veisrnk id necar di rm o IS U
[
P X r
. a t e E
R f ons fd L
R tc U boy A csdboesl E vaannwClF E e sl o uu A T ettL N o i ainda G e diet ao tt nF tLDa M o w n c L no nF o i e)l CdsiA nT U
t d s yt - nt m ed o u A i ndqO I
F seraut uo Y o r dd ai A o A 0 p c n T oignlP 8 repb nfT L c rnee .i T! l Iit nalA 1 reeT n 0 i r l t P tiil aC 5 er ie t e e nrt i r ces e g: a t rn Mnrtoe t
srrr get ae e i: f sen v aeerns 1 C U ert e C a c A psklt mineeL L ee mfent n ph r
uu1 cdA A gf R l eoj new f
R R t sr otf vpas orooo t eepceenehe 1 chT b R d q$ s(I T t t t u ec i D I oro t
I LFLHC O i N
NL RDiDCL 5kO N S ti l RA M 1 P
[ I O~
C l
O ARPC E
j : , fi ! i
- ,lll11
ATTACHMENT FOR ITEM NO. 2.g.
RATE DEVELOPMEliTS Electric Gas Steam Granted Test year utilized Annual amount of revenue increase requested-test year basis (000's)
Date petition filed -
Annual amount of revenue increase allowed-test year basis (000's)
Percent increase in revenues allowed Date of final order Effective date Rate base finding (000's)
Constructior work in progress ' included ih Rate base (000's)
Rate of return on rate base authorized Rate of return on common equit; authorized Revenue Effect (000's)
Amour.t received in year granted Amount received in subsequent year (If not available, annualize amounts received in year granted)
Pendinc aests Test yea utilized Amount (000's) .
Percent increase Date petit. ion filed Date by which decision must be issued Rate of return on rate base requested Rate of return on common equity requested Amount of rate base requested Amount of construction work in progress requested for inclusion in rate base 6
e
ATTACINENT FOR ITEM NO. 2.1 FINANC1AL STATISTICS 12 months ended 1977 1976 (dollars in millions)
Earnings available to comon equity Average comon equity Rate of return on average,comon equity Times total interest earned before FIT:
Gross income (incl. AFDC) + current and deferred FIT + total interest charges +
amortization of debt discount and expense Times long-tenn interest earned before FIT:
Gross income (incl. AFDC) + current and deferred FIT + long-term interest charges
+ amortization of debt discount and expense Bond ratings (end of period)
Standard and Poor's Moody's Times interest and preferred dividends earned after FIT:
Gross income (incl. AFDC) + total interest charges + amortization of dabt discount and expense + preferred dividends AFUDC Net income after preferred dividends 3
Market price of comon Book value of comon Market-book ratio (end of period)*
Earnings avail, for comon less AFDC +
depreciation and amortization, deferred taxes, and invest. tax credit adjust.-
l deferred Comon dividends Ratio Short-term debt Bank loans Commercial paper Capitalization (Amount & Percant)
Long-term debt Preferred stock Comon equity CIf subsidiary company, use parent's data.
. - - _ - - _ _ _ _------