ML20137S298

From kanterella
Revision as of 11:08, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Preoperational Security Program Review Insp Rept 50-443/85-18 on 850610-14
ML20137S298
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/29/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harmion R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20137S303 List:
References
NUDOCS 8512060205
Download: ML20137S298 (2)


See also: IR 05000443/1985018

Text

!

1

<#

" '

DD3IGNATFJ) mygg

NOV 2 91985 *tN Bn

Docket No. 50-443 License No. CPPR-135

Public Service of New Hampshire

ATTN: Mr. Robert J. Harmion

President and Chief Executive Officer

P.O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject: Inspection No. 50-443/85-18

This refers to the Pre)perational Security Program Review conducted by Mr. R.

J. Bailey of this office nn June 10-14, 1985 of activities authorized by NRC

Construction Permit No. CPPR-135 at the Seabrook Nuclear Station, Seabrook, New

Hampshire and to the discussion of our findings held by Mr. Bailey with Mr. W.

A. DiFrofio and other members of your staff at the conclusion of the inspec- i

tion. l

Areas examined during this review are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the review con-

sisted of an examination of security program plans and procedures, status of 1

program implementation, interviews with personnel, and observations by the in- ,

spector. <

Portions of Attachment I to the enclosed inspection report contain details of

your security program that have been determined to be exempt from public dis-

closure in accordance with 10 CFR 73.21 (Safeguards Information) and 10 CFR

9.5(a)(4) (Commercial or Financial Information). Therefore,'the portions so

identified will not be placed in the NRC Public Document Room and will receive

limited distribution. The remainder of Attachment 1, Attachment 2, the

inspection report and this letter will be placed in the Public Document Room

in accordance with 10 CFR 2.790(a).

l

No reply to this letter is required. Your cooperation is appreciated.

Sincerely,

Origina1 M M

James L J' M

i

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-443/85-18 (Portions of

Attachment 1 contain Sageguards Information (SGI) and Commercial or

Financial Information (C0FI))

0FFICIAL RECORD COPY IR SEABROOK 85-18 - 0001.0.0

11/15/85

85120602o5 851129

gDR ADOCK 050 g 3

.. t

2

cc w/ encl: (w/o Portions of Attachment I which contain SGI and C0FI)

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/SGI and C0FI)

State of New Hampshire

bec w/ encl: (w/o Portions of Attachment I which contain'SGI and C0FI)

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

ORP Section Chief

Jane Grant, DRP

1

l

\

RI:D R RS S R- S

Bail mig oyner Ma in

11/.y/85 1 (/85 11/2G/85 1/ /85

0FFICIAL RECORD COPY IR SEABROOK 85-18 - 0002.0.0

11/15/85