ML20080A564

From kanterella
Revision as of 10:19, 22 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-316 Re Cumulative Population Dose calculations,EP-206A Re Fire Fighting Group & EP-206B Re Damage Repair Group
ML20080A564
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/01/1983
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20080A557 List:
References
NUDOCS 8307270043
Download: ML20080A564 (1)


Text

-

I;

,. ' PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 Smit S t cA oFP (

m r ouem .

July 1, 19R3' Ret Docket Nos. 50-277 50-278 t

Mr. J. Pt. Atlan, Acting Administrator Region T Office of Inspection and Enforcement U.S. Nuclear Reculatory Commission 631 Park Avenue Kina of Prussia, PA 14406

Dear Mr. Allan:

Enclosed are two conies of additicnal revisions to the Peach Pottom Atomic Power Station Emergency Plan Imolementing Procedure =. Wose procedures are submitted, within 30 days of the chance, per regulations in 10 C?R 50, Apeendix E, Section v.

The crocedures being submitted are the foll.owinn EP 206A EP 208 EP 206R EP 316 -

, EP 207E EP 317 EP 2077 Two cooles have been sent under separate cover to the Document Control Desk.

Very truly yours, Ct.girut signea by Enclosure 8' E D' cc: Document Control Desk U.S. Nuclear Maquiatory Commission Washington, DC 20555 [

Site Inspector - Peach Bottom 8307270043 830719 PDR ADOCK 05000277 -

F PDR .

1_ _ _ - . . _ . _ . _ _ _ _ . _ _ _ .- ._. . . _ - ___.