ML20206K658

From kanterella
Jump to navigation Jump to search
Forwards PBAPS Bases Changes Through Unit 2 Bases Rev 25 & Units 3 Bases Rev 25.Bases Reflect Change Through Apr 1999, Thereby Satisfying Frequency Requirements of 10CFR50.71
ML20206K658
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/04/1999
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206K662 List:
References
NUDOCS 9905130234
Download: ML20206K658 (1)


Text

~

A 10CFR50.71(c)

V PECO NUCLEAR ecco teerov comnemv 965 Chestertwook Boulevard A Unit of PECO Energy Wayne, PA 19067-5091 May 4,1999 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S,. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Changes to Technical Specifications Bases Dear Sir; In accordance with the requirement of Peach Bottom Atomic Power Station (PBAPS)

Units 2 and 3 Technical Specification 5.5.10.d, PECO Energy Company hereby submits all Unit 2 and Unit 3 Technical Specifications Bases changes through Unit 2 Bases Revision 25 and Unit 3 Bases Revision 25. The enclosed Bases reflect changer through April 1999, thereby satisfying the frequency requirements of 10CFR50.71.

If you have any questions or require further information, please contact us.

Very truly yours, W

Garrett D. Edwards Director-Licensing f

[

Enclosures:

1) PBAPS Unit 2 Bases
2) PBAPS Unit 3 Bases cc H. J. Miller, Administrator, Region 1, USNRC (w/ enc) g A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (wo/ enc) yI.

9905130234 990504

~

PDR ADOCK 05000277 P

PDR m