Submits 1998 Annual Decommission Rept for Pbaps,Unit 1. There Were No Reportable Events Involving Unit 1 for 1998
ML20205B642
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/24/1999
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-99-14030, NUDOCS 9903310316
Download: ML20205B642 (2)


Text

,-o John Doering, Jr.

Vice President Peach Bottom Atomic Power Station v

PECO NUCLEAR nco Enemv c-ev 1848 Lay Road 1

A Unit of PECO Energy Delta. PA 17314-9032 717 456 4000 Fax 717 456 4243 E-mad: jdoenngra peco-energy com March 24,1999 Docket No. 50-171 License No. DPR-12 l 1

U.S. Nuclear Regulatory Commission Document Control Desk l Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Unit 1

. Annual Unit 1 Decommission Report - 1998 Gentlemen:

in accordance with Peach Bottom Atomic Power Station, Unit 1 Technical Specifications, inspections are periodically performed to verify radiation and contamination levels, barrier '

integrity, liquid and gaseous effluents, and water intrusion. All records of Unit 1 inspections are mairtained for retrieval and review.

Radiological surveys are performed semi-annually in the accessible areas of the exclusion area.

In 1998, radiation levels did not exceed 0.2 mrem / hour and all smearalle contamination levels were less than 1000 dpm/100cm2 beta-gamma. No non-naturally occurnnj airborne radioisotopes were identified. No liquid or gaseous radiation effluents were identified.

All exclusion area barriers as described in the Technical Specifications are maintained locked except when opened to provide access and egress for inspections, surveys, or repairs. Exclusion area barriers have not visually degraded from previous reports.

Water intrusion inspections are performed semi-annually. In 1998, there was no sampleable water accumulation in the accessble areas below ground level in the containment vessel; therefore, no radioanalysis was performed.

There were no reportable events involving Unit 1 for the year 1998.

Sincerely,

$/I d4d7 /5/ Z NdAb[

John Doering, Jr.

Vice President, Peach Bottom Atomic Power Station ME / T/ /

CCN 99-14050 j 70 cc: H. J. Miller, Administrator Region I, USNRC  !

A. C. McMurtray, Senior Resident inspector, USNRC 9903310316 990324 PDR ADOCK 05000171 R PDR  %

i U.S. Nuclear Regulatory Commission )

, J4 arch 13,1998 Page 2 .

i bec: N. J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania R.1. McLean, State of Maryland A. F. Kirby, lit, Delmarva Power Commitment Coordinator 62A-1, Chesterbrook J. J. Hagan 638-1, Chesterbrook J. Doering, Jr. SMB4-9, Peach Bottom  !

E. J. Cullen S23-1, Main Office )

T.A.Shea SMB4-5, Peach Bottom  !

G. D. Edwards - 62A-1, Chesterbrook C. J. McDermott - S13-1, Main Office H. N. Trimble - PS1-1, PeachBottom M. J. Kelly SMB4-6, Peach Bottom -

M. E. Warner A4-1S, Peach Bottom G. R. Rainey 63C-3, Chesterbrook j A. A. Winter - A4-4S, Peach Bottom l J. G. Hufnagel 62A-1, Chesterbrook l PB Nuclear Records . SMB1-1. Fexh Bottom l Correspondence Control 618-3, Chesterbrook I

I i

l 1

J l

i

..)