qm
-r 4
NUREG 0737 PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUiRTERS 955-65 CHESTERBROOK BLVD.
WAYNE. PA 19087 5691 (sisi sso sooo February 15, 1990 t
Docket No. 50-278 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 I
SUBJECT:
Progress Report for Implementation of Control Room Enhancements Pursuant to NUREG-0737 Peach Bottom Atomic Power Station, Unit 3
REFERENCE:
- 1) Letter, S. L. Daltroff, PECo, to D. R. Muller, USNRC, dated February 26, 1986;
Subject:
Control Room Design Review L
- 2) Letter, E. P. Fogarty, PECo to USNRC
)
dated June 30, 1989 In the reference 1 letter, which transmitted.the Control Room Design Review (CRDR) Report, we stated that a progress report on the implementation of the control room enhancements would be submitted-to the NRC within two months following completion of the next refueling outage for Peach Bottom Units 2 and 3.
This letter E,
provides the status of the control room enhancements as of the end D
. of the 7th refueling outage for Unit 3.
Reference 2 letter submitted the progress report as of the end of the 7th refueling outageJfor Unit 2.
\\_1 4;
The submittal of this report was delayed to allow for an independent verification of the control room enhancements status.
We regret any inconvenience this delay may have caused.
In the CRDR Report, 262 Human Engineering Discrepancies
^
(HEDs) were identified.
Each HED was assigned a priority with respect to safety using a significance scale of 1 to 6, indicating L
the overall111kelihood of the HED to cause operator error.
Three (3) HEDs ware assigned' dual priorities.
The HED priority categories and numbers of HEDn aa=lgned to each were:
Document Contrcl Deck Fcbrunry 15, 1990 Page 2 i
l Priority Number of Unit 3 UEDs Identified Resolved 1
High Safety Significance 10 10 2
Low Safety Significance 44 36 3
Operational Reliability 26 14
[
4 No Significant Improvement 94 66 5
Previously Corrected 52 NA 6
Not A Discrepancy 39 NA The subject, schedule, and status of each identified Priority 1 and 2 HED are provided in Tables 1 and 2 of Attachment 1 to this letter.
The status is presented as the actual outage the HED was resolved or the forecasted (F) outage during which the HED will be resolved.
In summary, the corrective actions for all the Priority 1 HEDs scheduled for the 7th and 8th refueling outages have been completed for Unit 3.
The corrective actions for 36 Priority 2 HEDs were also completed during the 7th refueling outage.
The remaining Priority 2 HEDs, D5-09, 13-07, TAl-01, TAl-06, TAl-16, SPl-02, VW-11 and VW-12 will be resolved during the 8th refueling i
outage as originally scheduled or as indicated in Note 1 for Table 2 of Attachment 1.
During the implementation of the Priority 1 and 2 HEDs, the corrective actions for many Priority 3 and 4 HEDs were completed.
The resolved Priority 3 and 4 HEDs are listed in Table 3 of.
"Yes" appears in the "HED REV" column of Tables 1 and 2 If corrective actions changed.
The corrective actions for one dual Priority 1/2 HED and four Priority 2 HEDs have been revised, and one HED has been cancelled (no action required).
The HED Assessment revisions are provided in Attachment 2.
PEco will update the NRC on the status of the control room enhancements annually as committed to in the Reference 1 letter.
Should you have any questions regarding this progress report, please do not hesitate to contact us.
l-Ve y truly
- ours,
^
- 1. U.
G. A. Hunger, Director-Licensing Nuclear Services Department l
i l
. Attachments t
l cc:
J. J. Lyash, USNRC Senior Resident Inspector l
W. T.
Russell, Administrator, Region I, USNRC L
l 1
l I
t Docket No.
50-278 t
I i
l ATTACHMENT 1 Schedule and Status of Human Engineering Discrepancies (BED) i Table 1 - Priority 1 HEDs l
r Table 2 - Priority 2 HEDs Table 3 - Priority 3 and 4 HEDs t
5
+
IM:.y m
s I
1 i/
-.i a.
- ~
J@ :
i TABLE 1 - PRIORITY 1 HEDs
?:,
E
HED Priority Schedule Actual / Forecast HED REV L
Al-09.
Annunciator Silence Centrol PRI 1
'7th Refuel 7th Refuel 4
Ik Rimic F15m Direction PRI 1 8th Refuel 7th Refuel D2-05 t ;
l' '
-D3 Component String and PRI 1 8th Refuel 7th Refuel b
Matrix Arrangement p,
_,i I
El-02 P.A;Systemneooms PRI 1 8th Refuel 7th Refuel 13-01 Reconter Values PRI 1 8th Refuel 7th Refuel
-r 13-05 Multipoint Recorder Speed -
PRI Bal 8th Refuel 7th Refuel
- B Replace Reconter 7R2-2-3-89
.}
L SD2-03 Containment Isolation -
PRI 1 8th Refuel 7th Refuel l
Mimic Arrangement
.SD3 23. Control /DisplayRelationahlpoPRI1 7th Refuel 7th Refuel o
E' T&l*04 Isolation Stamary Display PRI 1 8th Refuel 7th Refuel I?
i e
T&l 07 ' Reactor Level - 172 inches
.PRI All 7th Refuel.
2/8/90*
Yes
[
A Add Caution Tag
'i f eDue to a. misunderstanding, the infonmatlan tag was not added until February 8,1990.
c V..
V p
.\\
ii i
t k
h-1 of 1 0-..
.. n, r
b
d N
TAB 11 2 - PRIORITY 2 HEhe'
{
HED Priority Schedule Actual / Forecast HED REV Al-12 "Alara clear" Indication PRI 2 Btb Refuel 7th Refuel Yes t
D5-01 Operation Limits & hrnings PRI 2 8th Refuel 7th Refuel l
s
.{
D5-02 Illerarchal Labeling PRI 2 8th Refuel 7th Refuel DS-06 Redundant Latel Information PRI 2 8th Refue]
7th Refuel
?
!$-09 Incamplete Labels PRI 2 8th Refuel 8thRefuel(F)
(See Note 2)
~
-7, R
I2-01 Indicator Zone Markings PRI 2 8th Refuel 7th Refuel I
13-03 ' ' Recorder Alarm Points PRI 2 8th Refuel 7th Refuel ri 13 07-Recorder Pen Colors PRI 2 8th Refuel 8thRef.uil(F)
-(SeeNote2)
I 13-11 kemrder Zune Markings,
PRI 2 8th Refuel 7th Refuel' I
E, 15-05 Inadvertent Control PRI 2 8th Refuel 7th Refuel
-l nctivation P4-01, Feedback to ogerator _
PRI 2 Dnc 1987 7th Refuel i
P~
SD314 HPCI Itxlications
- PRI 2 8th Refuel 7th Refuel 1
SD3 1B Control GroupinJ PRI 2 8th Refuel-7th Refuel i
- SD3 Control Grouping PRI 2 8th Refuel
.7th Refuel l
SD3-21 RHR Irwitcator Arrangements PRI 2 8th Refuel 7th Refumi i
SD3-28 Reactor Nodo Switch Location PRI 2 8th Refuel 7th Refuel I
l.
SP1-02 Procedure Terminology Update PRI 2 See W StA 4to 1 HIDJ 1
NRC2-11 Torus !avel Zone Marking
. PRI 2' Complete 7th Refuel-
~
NRC2 12' Reactor level Accuracy PRI 2 Complete 7th Refuel
'LER 06 Diesel Generator Restart PRI 2 Sth Refuel 7th Refuel Procedural Requirements n
LER-081 Valve Alignant Procedural PRI 2
'8th Refuel 7th Refuel Requireannts
- LER 14 Reactor Vessel lioat up Rate PRI 2 8th Refuel 7th Refuel LER-18 Imprger Switch Position -
PRI 2 7th Refuel 7th Refuel 1 of 3
1 4 6 p
P
~
TABLE 2 - PRIORITY 2 HEDs HED Priority Schedule Actual / Forecast HED REV 1
LER Igr@er Valve Operation PRI 2 8th Refuel 7th Refuel l
761-01 Reactor Cooldown Rate PRI 2 With 8thRefuel(F)
Coquter Mod
' TAl-02 Reactor level - 48 inches PRI 2 8th Refuel 7th Refuel' TAl-05 HPCI Initiation Signal PRI 2 8th Refuel 7th Refuel Yes 3
TAl-06 LPCI Flow Resolution PRI 2 8th Refuel 8thRefuel(F) l J
TA1-07 Rosetor Level - 172 inches PRI B 2 8th Refuel 7th Refuel Yes bs t w Aatk Scalas
+
i TAl-08 6PCI & ROC bual Initiation-PRI 2 Uth Refuel 7th Refuel TA1 09 CS Manual initiation PRI 2 8th Refuel 7th Refuel t
TAl 10 - LPCI Manual Initiation PRI 2 8th Refuel 7th Refuel TAl 11 ADS Tiant Roset PRI 2 8th Refuel.
7th Refuel TAl-16. SRV Inctrument N2 Alatu PRI 2 8th Refuel 8th Refuel (F)
Yes Thl 17 TORUS level Range PRI 2 8th Refuel 7th Refuel TAl 20 TORUS Level 18.5 feet
.PRI 2 Bth Refuel 7th Refuel I
TAl 21 MUS Air Space Temperature PRI 2*
8th Refue' Cancelled Yes TAl-22 '10RUS Pressure Range PRI 2 8th Refuel 7th Refuel W-01._
ADS Numbers PRI 2 8th Refuel 7th Refuel W-04
,0rifice Bypass Valve Tag PRI 2 8th Refuel 7th Refuel it W-06 ' Torus Pressure Instrument No.
Pt7 2 bth Refuel 7th Refuel W-11 ECCS Instrument Color Pads PRI 2 8th Refuel P'1 Refuel (F)
W-12 T-200 Series Mananclature PRI 2 7th Refuel See Note 1 q
W-15 T-221 Valves Not Found PRI 2 8th Refuel 7th Refuel
- - The revised HED disposition would change this priority to PRI 6. It is not our practice to rtw% a priority once j.
established.
s 2 of 3
.- j,
E
~, :-
i r
- i. l l
NOTES FOR. T/.BLE 2, DRIORITY 2 HEDs j
Note is Series T-200 procedures were completed prior to the end j
of the 7th, Refueling outage. The need to revise the i
t T-190: procedures is being reevaluated because of the flowchart format of these procedures.
i
. Note 23.This HED is mubstantially complete. Only a few items remain.
5
= j
. I 9
l t
i L.
p:.
e b
?
r
- i. "
v y
l 1
1
- ?
5 3 of 3
.s
, $.s,.f.,
1 of 4
[..
r l
e s
TABLE 3 - RESOLVED HEDs PRIORITY 3 AND 4-
'HED' PRIORITY Al-03
. Annunciator Type Style PRI 4 Al -Multi-Choice Alarms PRI 4 1
Al-07 Annunciator Priority PRI 4 Coding Al-08 Annunciator Identification PRI 4
.{
1 Al-10 Annunciator Control Arrangmt.PRI 3 D1-02 Console Control Reach Dist PRI 4 I
1 D1-04 Mirror Imaging of Panels PRI 4 1
D1-05 Uncovered Panel Holes PRI 4 j
j D2-01 Control Distinction PRI 4 D2-02 Demarcation and Mimic Lines PRI 3
- D2-03 Demarcation Lines Contrast PRI 4 D2-04
- Mimic Flowpaths PRI 3 i
D2-06 Mimic Consistency PRI 4 D3-01 Control / Display Grouping PRI 4 a
~
D3-04 Color Coding Consistency PRI 3 D3-05 Control Display Height PRI 4 j
D5-03 Panel Identificatica PRI 4
- D5-05.
Label Type and Style PRI 4-D7-01 Control Panel Access PRI 4 D7-03.
Movable Obstructions PRI 4
{1
- D7-04 Low Control / Display PRI 4.
Visibility D7-06 Annunciator. Location PRI 4 i
i I
J
- u.,,
' 2 of 4 r
IABLE'3 - RESOLVED HEDs PRIORITY 3 AND 4 HED.
PRIORITY
~
E3-02 Protective Clothing PRI 4 E4-02 Telephone Cords PRI 4 11-01 Controller Height Low PRI 4 I2-03 Scale Units PRI 4 I2+04 Pointers Obscure Markings PRI 4 I2-06A Display Grouping PRI 3 I2-08 Excessive Scale Graduations PRI 4
'I3-08 Recorder Marking Procedure PRI 4
(
15-02 Position Indication Labels PRI 3 15-03 Position Markings PRI 3
- I5-04
-Control Height PRI 4 15-06 Label & Indicator Visibility PRI 4 15-07 Control Shape Coding PRI 4
-IS-08 Label & Pointer' Visibility PRI 4 IS-39 Emerg Control Identification PRI 4 4,
p E
P1-04' Annunciator Response Card PRI 4 ldentifApation
=S01-01 Opposing Surfaces Close PRI 4
,4 c
SD2-02 Containment Purge-Mimic PRI 3 pq Arrangement SD3-01
. Control /Displaiy Grouping PRI 3 GD3-03 Air.F.jeckbr Indications PRI 4
't a :
SD3-04 Air Ejector Controls PRI 4 SD3-05*
Air Xjector Controls PRI 3
- Enhanced by colored outline instead of colored field s.
f+
r
3 of 4
.I
'~
j
=
.\\
t s.'
l-l t
TABLE 3 - RESOLVED HEDs PRIORITY 3 AND 4 HED PRIORITY I
.SD3-06 Condensate Panel Control PRI 4 b
Grouping o
CS1-08 Turbine Drain Controls PRI 4 i
i-SD3-09 Drain Tank Dump Indications PRI 4
'SD3-10*
Drain Tank Drains PRI 4 l
SD3-11 Recirc indications not PRI 4 Grouped SD3-12 CRD Indications PRI 4 SD3-13
'HPCI Controle PRI 4 SD3-15 Controls Arrangement PRI 4 SD3-16 Display Arrangement PRI 3
- SD3-20 Containment Ventilation PRI'4 Control Arrangement SD3-22
.Drywell Pressure Indicator PRI 4 Arrangemes' i
I SD3-25 Indicator Arrangement PRI 3 i
SD3-27 Contro1' Color Coding PRI 4 SD4-01 Label Location PRI.4 SIl-01 High Module Location /
PRI 4 Readability SI2-01 Recorder Location Low PRI 4 SI2-05 Selector Light Color PRI 4
'SI3-01 Recorder Pen Colors PRI 4 spi-01 Remote Shutdown Panel PRI 4 Procedures t
ST1-01 Training Update on PRI 3 Enhancements
- Enhanced by colored outline instead of colered field v
e
~-
4 of 4 i
- (
d TABLE 3 - RESOLVED HEDs PRIORITY 3 AND 4 L
HED PRIORITY f
il NRC2-01 Torus Recorder Scales PRI 4 NRC2-02 Extra Scale on Chart PRI 4 NRC2-03 Label Terminology PRI 4 NRC2-05' Scale Increments Too Large PRI 3 5
(
TAl-24 HPSW to RHR Drain PRI-4 k
TAl-25' Reactor Pressure 330 PSIG PRI 4 TAl-27 Reactor. Pressure 150 PSIG PRI 4 e
TAl-28 Reactor Torus Delta P PRI 4 TAl-30 Procedural Reference PRI 4 i
TAl-31 Procedural Referenco PRI 4 TAl-32 Generator Load 5%
PRI 4 h
TAl Core Map Green Light PRI 4 VW-03
-Turbinc. Speed' Label
.PRI 4 VW-07' Torus instrument Color Pads PRI 4 VW-08
VW-10 Location of Rx Instruments:
PRI 4 VW-14 T-220 Stop Not Cicar PRI 4 1 '
g f,.1 F
F b
k
Docket No.
50-278
'f ATTACHMENT 2 i
Revised Human Engineering Discrepancy (HED) Assessments I
HED No. Al-12 HED No. TAl-05 i
HED No. TAl-07 HED No. TAl-16 i
HED No. TAl-21 I
h h.
3 m
t'.
)
PEACH BOTTOM HED ASSESSMENT REVISED 6/89 l
HED No. Al-12 EP =
8/PRI 2 Code D TITLE:
" Alarm Clear" Indication
+
COMMENT:
No indication exists for a cleared alarm Item: 4.3.12 Ref: C6.4 Source: CRS IDENTIFICATION:
Panel:
All Component:
Annunciators ID or Number:
N/A DESCRIPTION:
No special cue is available to an operator (e.g a slower blink rate) to indicate when an alarm input clears. The operator must determine on his own, that the alarm has cleared.
RESOLUTION:
(Sched:
None
)
The previous resolution of this HED required the position on of the internal: annunciator slide switch to be engraved on the cnnunciator window. Alarm cards were to be revised to-indicate the required setting. Guidelines for setting switches were to r
be provided. This resolution is revised. The slide switch position will not be engraved on the annunciator windows. Revised i
cnnunciator procedures have been prepared to show the required position of the slide sut:ches.
i TRAINING REQUIREMENTS:
Trair, operators in system for required settings.
-PROCEDURE REQUIREMENTS:
Revised annunciator window setting procedure now in place l-REASON FOR REVISION:
The desire for additional controls has led to generation of a station
.. annunciator log / procedure in which the switch settings nre controlled.
Tha oparating phiinanphy in r.n require aggreamive fal.1nwup nn alarma,,--
Further review shows that the originally conceived engravings would be confusing.
l Team Approval Signature:
f
^
0
~
Tpe atfo'ns /
^
Engineering (
y,
'W
( ) Add'1 page(s) attached Human Factors j
4 PEACH BOTTOM HED ASSESSMENT REVISED 6/89 HED No. TAl-05 EP:
/PRI 2 Code B TITLE:
HPCI Initiation Signal COMMENT:
No indication that ECCS initiation signal has been generated.
. ltem: NLA Ref: N/A Source: TA IDENTIFICATION:
Panel:
Component:
ID or Number: T-101 RC/Q, Step lb
' DESCRIPTION:
No indication that ECCS initiation signal has been generated.
(Rapid Action)
MITIGATING CONSIDERATIONS:
Annunciator alarms exist for Reactor Low Low Level and Drywell liigh Pressure, both initiating conditions for HPCI.
RESOLUTION:
(Sched: Complete
)
l The Reactor Low Low Level and Drywell High Pre,'sure are the only two conditions that initiate HPCI automatically.
l TRAINING REQUIREMENTS:
Additional training in meaning of colored annunciator windows PROCEDURE REQUIREMENTS:
Station procedure for coloring annunciator windows.
I REASON FOR REVISION:
Verification of HPCI initiation is by visual verification of HPCI flow.
L Annuciator windows are colored in accordance with the newly developed window coloring procedure.
Team Approval Signature:
Y4<'k O
(l'o
/,
Engineering s.
( ) Add'1 page(s) attached ts L.
'Hdman Factors
y PEACll BOTTOM IIED ASSESSMENT l-REVISED 6/89 IIED No. TAl-07 EP =
/PRI 1/2 Code C TTTII:
l Reactor level -172 inches I
CDflHEl?fT
(
Cannot read discrete level of -172 inches as required by l
procedure.
i I
Item: N/A Ref: N/A Source: TA I
TUENTU TCAYION: Pancl: 2DtU3 D UUO4C l
Component: LI-2-3-91
, LR-2-3-110A/B, LI-2-3-113 ID or Number: T-101 RC/L, Step 3 DESCRIPTTUN:
There is no line on scale at -172 inches which is the top of active fuel. In addition, the level may not be correct wLien flow is present in jet pumps (e.g. Recire or LPCI injection )
(Rapid ac. tion) e IEEYBETTUN:
(Sched: Complete )
Zone mark scales to indicate -172 inches. Add an information tag to panels to indicate that there will be a level error when flow is present in jet pumps. A: Information tag Pri 1 I
B: Zone Mark Pri 2 TRTINTNC~1TEQUIT(ERENTS:
Train operators in meaning of zone markings.
P1tTiUELURiniEQUITtERENT3:
New zone marking procedure now in place.
L llEASON FUK REVT5 TON:
Indicator numbers changed by subsequent modifications. Caution tag changed to information tag. A future plant modification is expected to delete the requirement for this tag. No r.one marking was apalied to recorders LR-2-3-110A/B because of scale crowding (SEC IIBD NRC2-12). Zone marking added to indicators.
Team Approval Signature:
/
pscati ngineerin b
i
( ) Add'l page(s) attached t
lluman' Factors
/
~~
.,-= =
- =
.n
. + = -
4 PEACH BOTTOM HED ASSESSMENT REVISED 6/89 I
HED No. TAl-16 EP:
/PRI 2 Code D l
1 TITLE:
SRV Instrument N2 Alarm j
COMMENT:
The alarm is too far away from the SRV Control Panel.
Item:
Ref*
Source: TA IDEFTIFICATION:
Panel: 20C209L Component: ADS NITROGEN HI/ LOW Pressure ID or Number: T-101 RC/P, Step 9b DE3CRIPTION:
The SRV controls are on Panel 20C03(2). To operate the SRVs, instrument N2 must be available. The absence of instrument N2 is announced by an alarm over Panel 20C09 approximately 28 feet away i
in the same plane.
(Deliberate Action)
RESOLUTION:
(Gehed: 8th Refuel
)
(1) The original resolution of this HED was to color the alarm window amber to alert operators to take immediate action.
i (2) The revised resolution is to move the alarm window to an annuciator associated with Panel 20C03(2).
TRAINING REQUIREMENTS:
Train operators in new annunciator window location PROCEDURE REQUIREMENTS:
Revise procedures to include new annuciator window location.
REASON FOR REVISION:
Recent modifications have added spare annunciator windows which were not available when this HED was orignally written.
~
Team Approval Signature:
/"7 f
W' v~
0FersE"sns /
/"
Engineerindg
{
/
Lu(
( ) Add'1 page(s) attached Human' Factors
)_
f l
0 l
PEACH BOTTOM HED ASSESSMENT REVISED 6/89 HED No. TAl-21 EP =
/PRI 2 Code A TITLE:
TORUS Air Space Temperature COMMENT:
There is no indication of TORUS Air Space Temperature Item:
Ref:
Source: TA IDENTIFICATION:
Panel: N/A Component: N/A ID or Number: None DESCRIPTION:
There is no indication of TORUS air space temp.
MITIGATING CONSIDERATIONS:
Present method of determining TORUS temperature to initiate TORUS spray to' allow air space to come into equilibrium with spray temperature, then read spray temperature.
RESOLUTION:
(Sched:.None
)
Previous resolution was to install a TORUS air space temperature indicator. Revised resolution is to accept the condition as is.
-TRAINING REQUIREMENTS:
None.
PROCEDURE REQUIREMENTS:
None.
REASON FOR REVISION:
Recent changes in EPGs have deleted the requirement to measure TORUS air temperature. No additional work to be done.
Team Approval Signature:
WI
- /'
Engineering \\JF Operations /
y
/
/.
'de ad
( ) Add'1 page(s) attached i