Updates Some of Transmitted Data Points Provided in Data Point Library ERDS for Pbaps,Units 2 & 3.Data Point Info Format Consistent with Guidance Specified in NUREG-1394
ML20206P917
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/10/1999
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 NUDOCS 9905190011
Download: ML20206P917 (4)


Text

a 4 10CFR50, /sppendix E V

PECO NUCLEAR esco eme,2< como <<<

965 Chesterbrook Boulevard A Unit of PECO Energy. Wayne. PA 19087-5091 May 10,1999 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Response Data System Data Point Library Changes

Dear Sir:

The purpose of this letter is to update some of the transmitted data points provided in the Data Point Library for the Emergency Response Data System (ERDS) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. ERDS is a direct, near real-time, electronic data link between PBAPS and the NRC's Operations Center which provides for the automated transmission of a limited data set of selected parameters.

10CFR50, Appendix E, Section VI.3.a requires that any changes in computer hardware or software that affect the transmitted data points identified in the ERDS Data Point Library must be submitted to the NRC within 30 days after the changes are completed. NUREG-1394, Revision 1, " Emergency Response Data System (ERDS) Implementation," provides the appropriate guidance for submitting ERDS data point library information.

Accordingly, the enclosed ERDS data point information for PBAPS is being submitted within 30 days after the changes have been completed as required by 10CFR50, Appendix E. The data point information is a format consistent with the guidance specified in NUREG-1394. In addition, the changes have been annotated with a vertical line in the margin adjacent to the change to the data point library.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, I

arrett D. Edwards Director- Licensing Q)b j I i

Enclosure cc: H. J. Miller, Administrator, Region 1, USNRC (2 copies of enclosure)

A. C. McMurtray, Senior Resident inspector, PBAPS (w/ enclosure) 9905190011 990510 PDR ADOCK 05000277 F PDR

I May 10,1999 Page 2 bcc: N. J. Sproul, Public Service Electric & Gas w/o enclosure R. l. McLean, State of Maryland

  • A. F. Kirby, Ill, Delmarva Power & Light Company R. R. Janati, Commonwealth of Pennsylvania "

G. R. Rainey - 63C-3 J. J. Hagan - 62C-3

  • J. Doering - PB, SMB4-9 "

M. E. Wamer - PB, A4-1S

  • A. A. Winter- PB, A4-5S "

R. Z. Kinard,61 A-4 w/ enclosure J. G. Hufngel - 62A-1 "

J. L. Phillabaum, 62A-1

  • Commitment Coordinator- 62A-1 Correspondence Control Desk- 61B-5 "

DAC - 618-5

PEACH BOTTOM ATOMIC POWER STATION U/2 DATA POINT LIBRARY REFERENCE FILE SPOTMOS MOD Date 4/16/99 Reactor Unit PE2 q

Data Feeder N/A i

NRC ERDS Parameter SP TEMP 1 Point ID SPDS0030 Plant Spec Point Description AVG TORUS TEMP Generic /Cond Description SUPPRESSION POOL TEMPERATURE Analog / Digital A Engr Units / Dig States DEGF Engr Units Conversion N/A Minimum instr Range 30 Maximum Instr Range 330 310 Zero Point Reference N/A Reference Point Notes N/A PROC or SENS P Number of Sensors 26 I How Processed AVERAGE Sensor Locations 97 FT ELEV Alarm / Trip Set Points Hl=95"F HIHl=110*F i

NI Detector Power Supply Cut-off Power Level N/A NI Detector Power Supply Turn-on Power Level N/A

( Instrument Failure Mode N/A Temperature Compensation for DP N/A Transmitters l

Level Reference Leg N/A Unique System Description This Point is the average of 26 resistance temperature detectors that are evenly spaced around the inside radius of the Torus.

I .

PEACH BOTTOM ATOMIC POWER STATION U/3 DATA POINT LIBRARY REFERENCE FILE SPOTMOS MOD Date 4/16/99 f Reactor Unit

  • PE3
Data Feeder N/A l l

l NRC ERDS Paramete.' SP TEMP Point ID SPDS0330 Plant Spec Point Description AVG TORUS TEMP l

Generic /Cond Description SUPPRESSION POOL TEMPERATURE Analog / Digital A Engr Units / Dig States DEGF l Engr Units Conversion N/A l

i Minimum Instr Range 30 Maximum Instr Range 240 310 l

l Zero Point Reference N/A l Reference Point Notes N/A PROC or SENS P Number of Sensors 26 l How Processed AVERAGE Sensor Locations 97 FT ELEV l

Alarm / Trip Set Points Hl=95'F HlHl=110'F NI Detector Power Supply Cut-off Power Level N/A NI Detector Power Supply Turn-on Power Level N/A Instrument Failure Mode N/A Temperature Compensation for DP N/A l Transmitters l

Level Reference Leg N/A Unique System Description This Point is the average of 26 resistance temperature detectors that are evenly spaced around the inside radius of the Torus.