ML20012F097

From kanterella
Jump to navigation Jump to search
Forwards Summary of ASME Repairs & Replacement Completed, Per Facility Second 10-yr Interval Inservice Insps Completed During 900331-891111 Extended Refueling Outage
ML20012F097
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/22/1990
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012F098 List:
References
CCN-90-14050, NUDOCS 9004100067
Download: ML20012F097 (1)


Text

I

'CCN-90-14050 PHILADELPHIA ELECTRIC COMPANY Pt'.ACH DUTIDM ATOMIC POW'ER STATION R. D.1. Ikm 208 Delta. lennsyhenia 17584 panca servons-.reis pourse ot acanewa (717) 4 4 7014 Up"%i.

March 22, 1990 Docket Nos. 50 278 A

U.S. Nuclear Regulatory Commission

' Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Unit 3 Inservloe inspection

Dear Sir:

In accordance with the Philadelphia Electric Company Second Ten Year Interval inservice inspection Program, inservice Inspections (ISIS) were completed on Unit 3 during the March 31, 1987 through November 11,1989 Extended Refueling Outage.

Enclosed are three copies of the ' Summary of ASME Repairs and Replacement Completed" (NIS 2). This documentation follows the ' Summary of Indications Observed", which was mailed March 6,1990.

Sincerely, en DMS. C/MJB:gh Enclosures cc:

' W.T. Russell, USNRC, Administrator, Region I (3)

J.J. Lyash, USNRC, Senior Resident inspector Boller Division, Pennsylvania Department of Labor and Industry D.B. Eggleston, The Hartford Steam Boller Inspection t

and Insurance Company T.E. Magatte, State of Maryland J. Urban, Delmarva Power R.A. Burricelli, Public Service Electric & Gas H.C. Schwemm, Atlantic Electric T.M. Gerusky, Commonwealth of Pennsylvania h

10H005 NRc 9004100067 900322 PDR ADOCK 05000278 g

PDL 0u1 N1 r.

.