ML20012B173

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revs to Epips,Including Rev 5 to ERP-101,App 1 to Rev 13 to ERP-110,App 2 to Rev 10 to ERP-110,App 1 to Rev 7 to ERP-140,App 2 to Rev 10 to ERP-140,App 3 to Rev 11 to ERP-140
ML20012B173
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/15/1990
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012B174 List:
References
NUDOCS 9003130719
Download: ML20012B173 (3)


Text

,.

-~

m x

m q

t L,b..,

10 CFR 50.54(q) 10 CFR 50 Appendix E

-l d

PHILADELPHI A ELECTRIC COM PANY NUCLEAR GROUP HEADQUARTERS I

955 65 CHESTERBROOK BLVD.

WAYNE, PA 19087 5691 (tis) s40 sooo

)

.s February 15, 1990 J

Docket Nos.

50-277 1

50-278 License Nos. DPR-44 1

DPR-56 1

U. S.' Nuclear Regulatory Constission-Attn: Docuaient Control Desk-Washington, DC 20555

SUBJECT:

Peach Botton Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures

Dear' Sir:

Enclosed is revision number 34 to the Emergency Response Procedures for Peach Botton Atomic Power Station Units 2 and 3.

These procedures are being i

submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 10 CFR 50.4.

The following revised procedures are enclosed.

o ERP-101 Rev. 5

" Classification of Emergencies" o.ERP-110, App. 1. Rev. 13

" Emergency Classification Notification Telephone List for an Unusual' Event or Alert" k

o ERP-110. App. 2. Rev. 10

" Emergency Classification Notification Telephone List for a Site Emergency or General Emergency" o ERP-140, App. 1, Rev. 7-

" Emergency Directors (ED) (Call in 2)"

o ERP-140 App. 2. Rev. 10

" Technical Support Team Leader (TSTL)"

o ERP-140, App. 3. Rev. 11

" Doss Assessment Team Leader (DATL)"

i o ERP-260 Rev. 5

" Emergency Operations Facility (EOF) Activation" o ERP-317 Rev. 2

" Determination of Protective Action

)

Recommendations" o ERP-500 Rev. 2

" Security Team Leader (STL)"

l 1

J (60 9003130719 900215 PDR-ADOCK 05000277

-p PDC

.e, U'.J. Nuc1:ar _Regulatcry Commissitn Februcry 15, 1990 4

[merg:ncyPlanImplementingProcedures Page 2 of 2 o ERP-510 Rev. 3

" Personnel Accountability" i

o ERP-520 Rev. 1

- " Security Team Activation" In accordance with 10 CFR 2.790(a)(6), we request that names and 1

telephone numbers in the above procedures be withheld from public disclosure since such disclosures would constitute an unwarranted invasion of the personal

{

privacy of the individuals involved.

1 If'you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, l

.h.

fo G. A. Hunger, Jr.

i Director-Licensing Nuclear Services Department Enclosure cc:

'J. J. Lyash, USNRC Senior Resident Inspector, PBAPS W. T. Russell, Administrator, Region I, USNRC (2 copies) i I

i l

l

l

7..

ae..,,

d

.;[

' UNITE 3 STATES 33 -

NUCLEAR REGULATORY COMMISSION -

+.

E WASHINGTON, D. C. 20666 J

E March 5, 1990.

.l 50-277/278.-

Peach Bottom MEMORANDUM FOR:

Chief, Document Management Branch, TIDC FROM:

-Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION' i

The' Division-of Rules and Records has reviewed'the attached document and has determined that it may now be made publicly available,

/f k "*=l) f{as Donnie H. Grimsley, Director Division of Rules and Rec rds-1 Office of Administration.-

's

Attachment:

As stated

-j 1

I

't 1

-t l.

.