ML20012B173
| ML20012B173 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/15/1990 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20012B174 | List: |
| References | |
| NUDOCS 9003130719 | |
| Download: ML20012B173 (3) | |
Text
,.
-~
m x
m q
- t L,b..,
10 CFR 50.54(q) 10 CFR 50 Appendix E
-l d
PHILADELPHI A ELECTRIC COM PANY NUCLEAR GROUP HEADQUARTERS I
955 65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 (tis) s40 sooo
)
.s February 15, 1990 J
Docket Nos.
50-277 1
50-278 License Nos. DPR-44 1
DPR-56 1
U. S.' Nuclear Regulatory Constission-Attn: Docuaient Control Desk-Washington, DC 20555
SUBJECT:
Peach Botton Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures
Dear' Sir:
Enclosed is revision number 34 to the Emergency Response Procedures for Peach Botton Atomic Power Station Units 2 and 3.
These procedures are being i
submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 10 CFR 50.4.
The following revised procedures are enclosed.
o ERP-101 Rev. 5
" Classification of Emergencies" o.ERP-110, App. 1. Rev. 13
" Emergency Classification Notification Telephone List for an Unusual' Event or Alert" k
o ERP-110. App. 2. Rev. 10
" Emergency Classification Notification Telephone List for a Site Emergency or General Emergency" o ERP-140, App. 1, Rev. 7-
" Emergency Directors (ED) (Call in 2)"
o ERP-140 App. 2. Rev. 10
" Technical Support Team Leader (TSTL)"
o ERP-140, App. 3. Rev. 11
" Doss Assessment Team Leader (DATL)"
i o ERP-260 Rev. 5
" Emergency Operations Facility (EOF) Activation" o ERP-317 Rev. 2
" Determination of Protective Action
)
Recommendations" o ERP-500 Rev. 2
" Security Team Leader (STL)"
l 1
J (60 9003130719 900215 PDR-ADOCK 05000277
-p PDC
.e, U'.J. Nuc1:ar _Regulatcry Commissitn Februcry 15, 1990 4
[merg:ncyPlanImplementingProcedures Page 2 of 2 o ERP-510 Rev. 3
" Personnel Accountability" i
o ERP-520 Rev. 1
- " Security Team Activation" In accordance with 10 CFR 2.790(a)(6), we request that names and 1
telephone numbers in the above procedures be withheld from public disclosure since such disclosures would constitute an unwarranted invasion of the personal
{
privacy of the individuals involved.
1 If'you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, l
.h.
fo G. A. Hunger, Jr.
i Director-Licensing Nuclear Services Department Enclosure cc:
'J. J. Lyash, USNRC Senior Resident Inspector, PBAPS W. T. Russell, Administrator, Region I, USNRC (2 copies) i I
i l
l
l
- 7..
ae..,,
d
.;[
' UNITE 3 STATES 33 -
NUCLEAR REGULATORY COMMISSION -
+.
E WASHINGTON, D. C. 20666 J
E March 5, 1990.
.l 50-277/278.-
Peach Bottom MEMORANDUM FOR:
Chief, Document Management Branch, TIDC FROM:
-Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION' i
The' Division-of Rules and Records has reviewed'the attached document and has determined that it may now be made publicly available,
/f k "*=l) f{as Donnie H. Grimsley, Director Division of Rules and Rec rds-1 Office of Administration.-
's
Attachment:
As stated
-j 1
I
't 1
-t l.
.