Forwards 870331-891111 Inservice Insp Program Final Rept for Peach Bottom Atomic Power Station Unit 3 1987-1989 Extended Refuel Outage. Several Indications Identified
ML20012B901
Person / Time
Site: Peach Bottom 
Issue date: 03/06/1990
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012B902 List:
References
CCN-90-14041, NUDOCS 9003190140
Download: ML20012B901 (2)


Text

' - - -

CCN-90-14041 PHILADELPHIA ELECTRIC COMPANY PEACH BCrrTOM ATOMIC POWER STATION R. D.1. Bos 208 Delta. Itniayh nnia 17314

= n.acar sorvou tese x=sa tw sacanesscs 017)456 7014 bnP March 6, 1990 nt Docket Nos. 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Unit 3 Inservice inspection

Dear Sir:

in accordance with the Philadelphla Electric Company Second Ten Year Interval lnservice i

inspection Program, inservice Inspections (Isis) were completed on Unit 3 during the March 31, 1987 through November 11, 1989 Extended Refueling Outage, in addition, repairs and replacements were completed during this period on Section XI components. Enclosed are three copies of the Inservice inspection Final Report (NIS 1) which summarizes the examinations performed. A separate report,' Summary of ASME Repairs and Replacement Completed" (NIS-2), will be submitted at a later date.

. SeveralIndications were Identified as a result of these examinations, and their resolutions are contained in Section 2 of the (NIS-1) report, ' Summary of Indications Observed.'

in addition to the ISI Reports, a detailed data package which supports this examination has been assembled. The package is retained by PECo, and is available for review, 1

Sincerely,

- f(vhTD h/'

L 7

DMS/TEC/MJB:gh Enclosures 0

cc:

W.T. Russell, USNRC, Administrator, Region I (3)

J.J. Lyash, USNRC, Senior Resident inspector Boller Division, Pennsylvania Department of Labor and Industry

- D.B. Eggleston, The Hartford Steam Boller inspection and Insurance Company T.E. Magatte, State of Maryland J. Urban,' Delmarva Power R.A. Burricelli, Public Service Electric & Gas H.C. Schwemm, Atlantic Electric l

T.M. Gerusky, Commonwealth of Pennsylvania h

1GH005.NRc lpa 2:8 W 2 88 6 P

9 PDC f

i FORM MIS 1 IN-8ERVICE INSPECTION REPORT PHIIADELPHIA ELECTRIC COMPANY 955 Chesterbrook Boulevard Wayne, Pennsylvania 19087 Peach Bottom Station - Unit 3 Date March 1, 1990 R.D. No. 1 Inspection Date: March 31, 1987 Delta, Pennsylvania 17314 through November 11, 1989 Commercial Service Date: December 23, 1974 Gross Generating Capability:

1098 MWe Pennsylvania State Identification Number:

ST433411 National Board Number Assigned by Reactor Manufacturer:

NB 3904 Component Identification: ASME Class 1, 2 and 3 Components Abstract of Examinations Performed, Conditions Observed, Corrective Measures Recommended and Taken See:

Summary of Indications Observed and Section 1,2 Examinations Performed Section 3,4,5 -

Reference Drawings for Class 1

and 2

Components and RPV Internals Name of Inspector:

James Fuhrman Name and Mailing Address of Inspector's Employer:

The Hartford Steam Boiler Inspection & Insurance Company 610 Freedom Business Center Drive Suite 300 King of Prussia, Pennsylvania 19406 I certify that the statements made in this report are correct and

' examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Additional examinations were performed to the applicable guidelines.

Signature of PECO PBAPS Maintenance Senior Engineer: