05000416/LER-1982-003, Forwards LER 82-003/03L-0

From kanterella
Revision as of 20:09, 18 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 82-003/03L-0
ML20055A986
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/15/1982
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20055A987 List:
References
AECM-82-322, NUDOCS 8207200219
Download: ML20055A986 (1)


LER-2082-003, Forwards LER 82-003/03L-0
Event date:
Report date:
4162082003R00 - NRC Website

text

.

, s MISSISSIPPI POWER & LIGHT COMPANY l Helping Build Mississippi EnsMildd5 P. O. B O X 16 4 0, J AC K S O N. MIS SIS SIP PI 3 9 2 0 5 July 15, 1982 NORRIS L. STAMPLEY

$E NeOR VICE PRESCE NT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission ca >-

Region II '" t .,

101 Marietta St., N.W., Suite 3100  % ~M.

Atlanta, Georgia 30303 e #

g ?a#

Attention: Mr. J. P. O'Reilly, Regional Administrator 1, y

Dear Mr. O'Reilly:

~-

SUBJECT:

Grand Gulf Nuclear Station %

Unit 1 Docket No. 50-416 License No. NPF-13 Triaxial Forced Balance Accelerometer Inoperable

Reference:

LER 82-003/03 L-0 File 0260/L-835.0 AECM-82/322 On June 16, 1982, Grand Gulf Unit 1 experienced the failure of a t.riaxial forced balanced accelerometer while performing a surveillance test. Attached is LER 82-003/03 L-0 with supplementary information.

Yours tru y b

NLS:Im Attachment 9 M[ .

cc: Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/a)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Document Control Desk (w/a)

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8207200219 820715 PDR ADOCK 05000416 S PDR .

AEINI Member Middle South Utilities System