Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206T3351999-05-17017 May 1999 Provides Written follow-up of Request for NOED Re Extension of Shutdown Requirement of TS Limiting Condition for Operation 3.0.3.Page 9 of 9 of Incoming Submittal Not Included ML20206N7861999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Braidwood Station. Rept Contains Info Associated with Stations Radiological Environ & Meteorological Monitoring Programs ML20206Q8521999-05-13013 May 1999 Submits Rept on Numbers of Tubes Plugged or Repaired During SG Inservice Insp Activities Conducted During Plant Seventh Refueling outage,A2R07,per TS 5.6.9 ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20210C7221999-05-0303 May 1999 Forwards Initial License Exam Matls for Review & Approval. Exam Scheduled for Wk of 990607 ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6741990-09-17017 September 1990 Suppls Responses to Violations Noted in Insp Repts 50-454/89-11,50-455/89-13,50-456/89-11 & 50-457/89-11. Corrective Actions:Procedures Changed & Valve Tagging Status Provided ML20059K5081990-09-14014 September 1990 Forwards Tj Kovach to E Delatorre Re Visit by Soviet Delegation to Braidwood Nuclear Station in May 1990 ML20059L6611990-09-10010 September 1990 Forwards Byron Station Units 1 & 2 Inservice Insp Program ML20064A3751990-08-24024 August 1990 Forwards Revised Pages to Operating Limits Rept for Cycle 2, Correcting Fxy Portion of Rept,Per Tech Spec 6.9.1.9, Operating Limits Rept ML20064A3681990-08-24024 August 1990 Forwards Response to 900517 Request for Addl Info Re Design of Containment Hydrogen Monitoring Sys.Util Proposes Alternative Design That Ensures Both Containment Isolation & Hydrogen Monitoring Sys Operability in Event of LOCA ML20064A0181990-08-16016 August 1990 Submits Supplemental Response to NRC Bulletin 88-008,Suppls 1 & 2.Surveillance Testing Revealed No Leakage,Therefore Charging Pump to Cold Leg Outage Injection Lines Would Not Be Subjected to Excessive Thermal Stresses ML20059A3991990-08-15015 August 1990 Forwards Response to NRC 900521 Request for Addl Info Re Plant Inservice Insp Program ML20063Q1051990-08-10010 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Byron Units 1 & 2 & Corrected Monthly Operating Rept for June 1990 for Unit 2 ML20058N0551990-08-0707 August 1990 Provides Supplemental Response to NRC Bulletin 88-008, Suppls 1 & 2.Surveillance Testing Performed Revealed No Leakage,Therefore,Charging Pump to Cold Leg Injection Lines Would Not Be Subjected to Excessive Thermal Stresses ML20056A3351990-08-0202 August 1990 Responds to NRC Bulletin 88-009 Requesting That Addressees Establish & Implement Insp Program to Periodically Confirm in-core Neutron Power Reactors.All Timble Tubes Used at Plant Inspected & 18 Recorded Evidence of Degradation ML20055H7631990-07-25025 July 1990 Forwards Financial Info Re Decommissioning of Plants ML20055J1221990-07-25025 July 1990 Notifies That Plants Current Outage Plannings Will Not Include Removal of Snubbers.Removal of Snubbers Scheduled for Future Outages.Completion of Review by NRC by 900801 No Longer Necessary ML20055J1261990-07-25025 July 1990 Notifies That Replacement of 13 Snubbers w/8 Seismic Stops on Reactor Coolant Bypass Line Being Deferred Until Later Outage,Per Rl Cloud Assoc Nonlinear Piping Analyses ML20055H0291990-07-17017 July 1990 Forwards Revised Monthly Performance Rept for Braidwood Unit 2 for June 1990 ML20055G3251990-07-16016 July 1990 Responds to SALP Board Repts 50-454/90-01 & 50-455/90-01 for Reporting Period Nov 1988 - Mar 1990.Effort Will Be Made to Continue High Level of Performance in Areas of Radiological Controls,Plant Operations,Emergency Preparedness & Security ML20055G4631990-07-13013 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-456/90-08 & 50-457/90-08.Corrective Actions:Discrepancy Record for Cable Generated & Cable That Had Been Previously Approved for Use on Solenoid Obtained & Installed ML20044A9621990-07-13013 July 1990 Forwards Rev 0 to Topical Rept NFSR-0081, Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes, in Support of Implementation of PHOENIX-P & Anc ML20044B1411990-07-12012 July 1990 Forwards Addl B&W Rept 77-1159832-00 to Facilitate Completion of Reviews & Closeout of Pressurized Thermal Shock Issue,Per NRC Request ML20044B2141990-07-11011 July 1990 Withdraws 891003 Amend Request to Allow Sufficient Time to Reevaluate Technical Position & Develop Addl Technical Justification ML20044B2081990-07-11011 July 1990 Responds to Generic Ltr 90-04 Re Status of GSI Resolved W/ Imposition of Requirements or Corrective Actions.Status of GSI Implementation Encl ML20044A9521990-07-10010 July 1990 Provides Supplemental Response to NRC Bulletin 88-001. Remaining 48 Breakers Inspected During Facility Spring Refueling Outage ML20044B2871990-07-0909 July 1990 Forwards Brief Description of Calculations Performed in Accordance W/Facility Procedure Used to Make Rod Worth Measurements,Per NUREG-1002 & Util 900629 Original Submittal ML20044A7991990-06-29029 June 1990 Forwards Description of Change Re Design of Containment Hydrogen Monitoring Sys,Per 900517 Request.Util Proposing Alternative Design Ensuring Containment & Hydrogen Monitoring Sys Operability in Event of Power Loss ML20055D4811990-06-29029 June 1990 Discusses Revised Schedule for Implementation of Generic Ltr 89-04 Re Frequently Identified Weaknesses of Inservice Testing Programs.All Procedure Revs Have Either Been Approved or Drafted & in Onsite Review & Approval Process ML20058K3521990-06-22022 June 1990 Requests Withdrawal of 900315 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,changing Tech Specs 3.8.1.1 & 4.8.1.1.2 to Clarify How Gradual Loading of Diesel Generator Applied to Minimize Mechanical Stress on Diesel ML20055D2951990-06-22022 June 1990 Discusses Results of 900529-0607 Requalification Exam.Based on Results of Exam,Station Removed/Prohibited Both Shift & Staff Teams & JPM Failure from License Duties.Shift Team Placed in Remediation Program from 900611-14 ML20056A0361990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-456/90-10 & 50-457/90-11.Corrective Action:Valve 2CS021b Returned & Locked in Throttle Position & Out of Svc Form Bwap 330-1T4 Modified ML20043G5851990-06-0808 June 1990 Forwards Repts Re Valid & Invalid Test Failures Experienced on Diesel Generator (DG) 1DG01KB,1 Valid Test Failure on DG 2DGO1KA & 2 Invalid Test Failures Experienced on DG 2AGO1KB ML20043D3151990-06-0101 June 1990 Forwards Rev 30 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043D3141990-06-0101 June 1990 Forwards Rev 18 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043E3141990-05-31031 May 1990 Withdraws 880302 Application for Amend to Licenses NPF-37, NPF-66,NPF-72 & NPF-77,changing Tech Spec 4.6.1.6.1.d to Reduce Containment Tendon Design Stresses to Incorporate Addl Design Margin,Due to Insufficient Available Data ML20043F4731990-05-30030 May 1990 Forwards Suppl to 881130 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77.Changes Requested Per Generic Ltr 87-09,to Remove Unnecessary Restrictions on Operational Mode Changes & Prevent Plant Shutdowns ML20043C8641990-05-29029 May 1990 Forwards Rept of Local Leakage Rate Test Results for Third Refueling Outage.Leakage Rates of Six Valves Identified as Contributing to Failure of Max Pathway Limit ML20043B7771990-05-23023 May 1990 Forwards Endorsement 9 to Nelia & Maelu Certificates N-108 & M-108 & Endorsement 8 to Nelia & Maelu Certificates N-115 & M-115 ML20043B7691990-05-23023 May 1990 Forwards Endorsement 11 to Nelia & Maelu Certificates N-93 & M-93 & Endorsement 9 to Nelia & Maelu Certificates N-101 & M-101 ML20043A9161990-05-16016 May 1990 Provides Advanced Notification of Change That Will Be Made to Fire Protection Rept Pages 2.2-18 & 2.3-14 ML20043C2811990-05-15015 May 1990 Responds to NRC 900416 Ltr Re Violations Noted in Insp Repts 50-456/90-09 & 50-457/90-09.Corrective Actions:Gas Partitioners Tested Following Maint During Mar 1990 & Tailgate Training Session Will Be Held ML20043A6391990-05-11011 May 1990 Submits Revised Schedule for Implementation of Generic Ltr 89-04 Guidance.Rev to Procedures for Check Valve & Stroke Time Testing of power-operated Valves Will Be Completed by 900629 ML20043A2891990-05-10010 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept for Mar 1990 for Byron Nuclear Power Station ML20042G7111990-05-0707 May 1990 Responds to NRC Questions Re leak-before-break Licensing Submittal for Stainless Steel Piping.Kerotest Valves in Rh Sys Will Be Replaced in Byron Unit 2 During Next Refueling Outage Scheduled to Begin on 900901 ML20042F6851990-05-0404 May 1990 Requests Resolution of Util 870429,880202 & 0921 & 890130 Submittals Re Containment Integrated Leak Rate Testing in Response to Insp Repts 50-454/86-35 & 50-455/86-22 by 900608 ML20042F6771990-05-0303 May 1990 Advises NRC of Util Plans Re Facility Cycle 2 Reload Core. Plant Cycle 2 Reload Design,Including Development of Core Operating Limits Has Been Generated by Util Using NRC Approved Methodology,Per WCAP-9272-P-A ML20042E9601990-04-30030 April 1990 Forwards Response to NRC 900327 Ltr Re Violations Noted in Insp Repts 50-454/90-09 & 50-455/90-08.Response Withheld (Ref 10CFR73.21) ML20042G3591990-04-30030 April 1990 Forwards Errata to Radioactive Effluent Rept for Jul-Dec 1989,including Info Re Sr-89,Sr-90 & Fe-55 Analysis for Liquid & Gaseous Effluents Completed by Offsite Vendor ML20055C5761990-04-30030 April 1990 Forwards Results of Investigation in Response to Allegation RIII-90-A-0011 Re Fitness for Duty.W/O Encl ML20042E9111990-04-25025 April 1990 Forwards Rev 1 to Nonproprietary & Proprietary, Steam Generator Tube Rupture Analysis for Byron & Braidwood Plants. ML20042F2681990-04-18018 April 1990 Provides Supplemental Response to Violation Noted in Insp Repts 50-456/89-21 & 50-457/89-21 Re Safeguards Info.Util Request Extension of 891010 Commitment Re Reviews of Plants. List of Corrective Actions Will Be Submitted by 900601 ML20042F0241990-03-28028 March 1990 Forwards Part 3 of 1989 Operating Rept.W/O Rept ML20012E1081990-03-21021 March 1990 Forwards Calculations Verifying Operability of Facility Dc Battery 111 W/Only 57 of 58 Cells Functional & Onsite Review Notes,Per Request ML20012D8671990-03-21021 March 1990 Reissued 900216 Ltr,Re Changes to 891214 Rev 1 to Updated Fsar,Correcting Ltr Date 1990-09-17
[Table view] |
Text
. _ .
,' Commonwealth' Edison S'
'//'D) orts First National Plaza, Chictgo, lilinois (O Address Reply to: Post Office Box 767
~ Chicago, Illinois 60690 -
l 1
Janua ry 21, 1982
\ N g
Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation S
U.S. SEC!3 PED 9 Nuclear Regulatory Commission . .
Washington, DC 20555 T s[$#jj;yM2319825 vg, ,,.
1
Subject:
. Byron Station Units 1 and 2 k Braidwood Station Units 1 and 2 g Advance FSAR Information '
NRC Docket Nos. 50 A54/455/456/45 7
Dear Mr. Denton:
1.
be included in the Byron /Braidwood FSAR in the next amenca
, Attachment A to this letter lists the information enclosed.
-letter are provided.One (1) signed original and fif ty-nine (59) copies o f this included for your review and approval.Fif teen (15) copies of the enclosures are Please address' further questions to this o ffice.
Very truly yours, i Sk
. T. R. Tramm
[ Nuclear Licensing. Administrator Pressurized Wate r - Reactors l Attachment #
f 3129N '
I i Qo0
.5
- l i
l 1
8201290350 820121 PDR ADOCK 05000454 I
L A PDR i h i
- . ___ _ . , ~ . . . - , . _ , _ - - _ ,. , _ . _ _ - . _ . . _ _ . _ _ _
i 4 Attachment A.
LIST OF ENCLOSED INFORMATION l 'I. FSAR Question Responses' i ,
1
- New
- - 251.5 Revised: 022.15' ,
022.25
.423.35 450.2 I !
) II. FSAR Text Changes i
Preop Tests: Tables 14.2-54, 58, 60
- j. New Chapter 16.0 Figures 3.4-4a, 4b, Sa, Sb i
III. Miscellaneous Items 2 RSB Open Item (Capability to borate to Cold Shutdown) i I
i I
4 I
a 4
I' i
I i
i I
i g- (
- . . - , . . . _ . - , , . . , -.,,nn-_._._.n___n ,...n. ,,.,..,.w-.,,,,,..-.-n.., , . , . - - _ _w---.r ,_ , , . , ,-
B/B Re' actor Systems Branch Open Item Address the issue of'the capability to borate the plant to the cold shutdown condition, using safety grade equip-ment with_ letdown isolation. Is thert sufficient volume in the system to accomodate the volume of bcrated water required to bring the plant to a cold shutdown condition?
RESPONSE
The capability to borate to the cold shutdown condition, with letdown isolation, exists at the Byron plant. We feel that there is sufficient volume available to inject enough borated water to bring the plant to the cold shut-down condition.
We base our conclusion on the analysis performed for the Comanche Peak plant. It was shown that Comanche Peak had the capability to borate to the cold shutdown condition, as reported in the Comanche Peak SER. The NSSS systems at Byron /Braidwood-are nearly identical to the Comanche Peak NSSS systems and we feel that the analysis done for Comanche Peak is directly applicable to Byron /Braidwood.
However, we are persuing a plant specific analysis. The assumptions made for this analysis are the following:
- 1. The plant is in hot standby condition following a trip from 100% power with the most reactive rod stuck out.
- 2. Letdown has isolated.
- 3. -Safety grade equipment is used to borate the plant to
, the cold shutdown condition.
The results of this analysis will be available February 1, 1982.
e
).
s i
, y w - - . . ~ , ~, --a
. , , B/B-ESAR TABLE 14. 2-54
- REACTOR COOLAtJT SYSTEM EXPAtJSIOli AtID RESTPE!!i'
"(Preoperational Test)
Plant Condition or Prerequisite
. Durina hot functional testing prior to core load.
Test chiective To verify that components and piping of the reactor coolant i
system can expand unrestricted with acceptable clearances.
L Test Summary Baseline data will be taken at cold plant conditions prior to l heatup. During the heatuu to operating ecmperatures, selected points on components, piping, and snubbers will be checked at various l temperatures to verify that they can expand unrestricted with acceptable clearances. Any potential points of interference detected during the heatup will be corrected prior to increasing the temperature. Following ecoldown to ambient temperature, the piping and components will be checked to confira that they return to their approximate caseline positions to verify unrestricted movenent during cooldown. .
Acceptance Criteria The pipina and components are verified to expand without restricted movement in accordance wi th Subsection 3.9.2.1.
a f
14.2-66
B/B-FSAR TABLE 14.2-58 INTEGRATED HOT FUNCTIONAL HEATUP (Preoperational Test) 1 Plant Condition or Prerequisite 1
Prior to core load following hydrostatic testing of primary and secondary systems with essentially all associated systems preoperational testing completed.
Test Objective '
To demonstrate ability to heat primary system to normal operating temperature and pressure.
Te_st Su.nmary The reactor coolant system will be taken to normal operating temperature and pressure using reactor coolant pump heat input. Tests will be performed to demonstrate operation of excess letdown and seal water flow paths and letdown flow rates. Thermal expansion checks including snubbers l
will be conducted. Isothermal calibration of reci. stance temperature detectors and incore thermocouples will be performed.
Acceotance Criteria Properational tests to be performe 3uring plant heatup are accomplished and the +aactor coolant system taken to normal operating temperature and pressure in accordance with subsection 3.9.2.
1 f
14.2-70
. a
,' B/B-FSAR TABLE 14.2-60 INTEGRATED HOT FUNCTIONAL TESTING COOLDOWN (Preoperational Test)
Plant Condition or Prerecuisite Prior to core load with the RCS at normal no-load temp 2tature l and integrated hot functional testing at temperature completed. l Test Objective To demonstrate the ability to cooldown the' plant from normal operating temperature and pressure to cold shutdown conditions.
Test Summary The plant will be taken from hot to cold conditions using steam generator. steam dump and the residual heat removal sys-tem as applicable. The thermal contraction of piping rystems including snubbers will be monitored. Auxiliary systems required for cooldown will be operationally demonstrated.
Acceptance Criteria The preoperaticnal tests required to be performed during cooldown of the system are completed and reviewed. Steam dump and residual system cool the plant from normal operating temperature and pressure to cold shutdown conditions, thermal contraction of piping systems, and auxiliary systems required l for cooldown are in accordance with subsection 3.9.2.
P
. a 0
14.2-72
G/B-FSAR AF1END2!EST 36 JANUARY 1982 QUESTION 022.15 <
"In accordance with the NRC request to all applicants contained in Task Action Plan A-2 of NUREG-0609, " Asymmetric
?
Blowdown Loads on PWR Primary Systems," provide the following information for the reactor coolant system break that results in the peak differential pressure loads within the reactor cavity:
- a. Peak and transient loading on the reactor pressure vessel that includes forces and moments separated into their X,Y,Z components,
- b. Provide projected areas used to calculate these loads and the location of these areas shown on detailed plan and elevation drawings.
" NOTE: This is a reiteration of the request made in previous question number 0022.3.j."
RE,SPONSE a-. This item is answered in the response to Question 110.62 and the revision to Section 3.9 of the FSAR.
- b. The drawings requested were provided under separate cover in response to Question 22.16.
I In addition, in letter WCO-256-81, L. J. Kripps to R. A.
Victor, " Byron Reactor Cavity and Inspection Cavity Confir-matory Subcompartment Analysis Results," dated December 9, 1981, confirmatory dif ferential pressure loc.ds associated with the reactor cavity were presented. The Applicant was requested to review these results and evaluate the structural adequacy of the reactor cavity.
This evaluation has been completed and it has been determined that the existing design of the reactor cavity shield wall 1 i is adequate to accept the pressure loadings presented in l .the subject letter.
I l
4 #
I Q22.15-1
B/B-FSAR QUESTION 022.25 "FSAR Section 6.5.2.2 states ' Containment spray injection and caustic education...will continue until...the low-low level alarm of the RWST is annunciated. Containment spray injection and caustic addition may then be terminated, and the operating personnel may transfer the containment spray pumps from the injection to the recirculation
. node by first closing the motor-operated valves in the
.uction line from the RWST, the water and caustic lines _
to the eductor, and then opening the motor-operated valves in the suction lines from the containment sumps.'
State clearly whether transferring the containment spray pumps from the injection to the recirculation mode involves stopping and restarting the containment spray pumps as implied in the above statement because the valves in the suction line from the RWST are riosed before the valves in the suction lines from the containment sumps are opened."
RESPONSE
The containment spray pumps will be run for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following a LOCA. During this time, switchover of pump suction from the injection to the recirculation mode of operation will be manually initiated and completed.
The containment spray pumps do not have to be stopped when transferring from the injection mode to the recirculation mode of operation. A summary of the sequence of events leading up to and during switchover follows.
The RWST level is initially one volume inaccuracy below the low alarm setpoint.
gpm.
RWST cutflow during injection is 18,200 ECCS switchover begins at one volume inaccuracy below the low-low alarm setpoint. The volume consumed prior to switchover is 257,454 gallons and requires 14.15 minutes. e ECCS switchover is given in Table 0212.65-2 in response to Question 212.65. It requires 235 seconds (3.92 min.)
and consumes 73,618 gallons assuming two trains and worst single ECCS failure. Following completion of ICCS switchover, the outflow from the RWST is 14,400 gra and continues until 20.9 minutes have elapsed, consuming an additional 40,752 gallons.
Q22.25-1
B/B-FSAR QUESTION 251.5
" Provide actual pressure-temperature limits for Byron Unit 2 and Braidwood Unit 2 based upon the limiting fracturc toughness of the reactor vessel material and the predicted shift in the adjusted reference temperature ,
RT resulting from radiation damage. The pressure-teMB3r,aturelimitsforthefo110wingconditionsmust be included in the technical specifications when they are submitted:
- 1. Preservice hydrostatic' tests,
- 2. Inservice leak and hydrostatic tests,
- 3. Heatup and cooldown operations, and
- 4. Core operation."
RESPONSE
The requested information is given in new Chapter 16.0 Figures 3.4-4a, 3.4-4b, 3.4-Sa and 3.4-5b.
e 6
e' 0251.5-1
- y. . _ _ = . us -a '
m= _ _w . . _ . .
..a _ ;-._. . _. . , . . _ _ , _ _ _ _ _ _ _ _ . _ __
.)
j .
- zwn., .
p
.i .
v.
t M
i 1 MATEHbt PRC70ATYB/GS p
. Lif/.lTIG f.'ATEntt,L: vfELD METAL C C. W .R C O :J7.T J7: / ~~/:r.,429 TG BE' NYDRO j; (LCS ViT% (ACTUAL CC"47tITT '
n '
4 UWT GC3 YTP4) 1 p
P -
RTI!DT IHITIAL: ,
, o 1 COh*S2GVAYP/CLY (CJM2D TO DE 433F i AOlVAL m*t.DT " .
. 100F} .
t
', ; IITIJOT AFTER tG EFFY:
E m _ 1/iT,1100F (P.OTUAL RT; DT =
N
?!CT. D*F(ACTUAL ni;gy- f sis LMF) y t:
9 8 CURVE AFPUC'J3tE FOR H.?.ATU? .
j S
RATES U? TO C 'JJfHn 003 Ti:2 '
c C33V 02 r Eli:C 3 L*? TO 13 Ei-7Y
$ M D C0((TA*J3 fr.;IG5;r, cp na 100.': AT.D COi :::1 FCirFCULE INZiP,U:(ENT CRROns n -
- 1.1 I IU -
C'3.171'i". LIT ( t.l.*:TT -
f -
tYf.1D CU !!!C2Ti'.fICE.
l .
o tit'[."C31All: YE.Tl l [ TT*:F2DATU?.E IC.1. F)
! FC.'; I;-:I C ~i3V1CE
{ i f 52'O~.) UP TO 15 C77Y i p, I
i -
4
- HSATU?
i CU!lVI i i i I 8 1
+ o i 0 1C3 200 300 400 ECO 1NDICATED T~1v72 RAT URE 10F) ..
I . .. .
t I
CY P.C :'103M D.' r ^ D OT AT:" * ':?. l l
r::..t . c.u rre i. ; .. eat ,
[
l
' . FIGURE 3.4-ta.
DYRON tlfilT 2 P.EACTOft CCOLA? T SYSTEM HEATU? Lt!.llTATICNS
. /FPLICAP,M b? TO 10. EFPY
. 4
_o _ _ _ ____ . _ . . .-_ . . _ _ __
-q
.V w .t
, - . ti'M2 i
.- 3000 --
1 j
$4AYEnt"<L FRCPEftTY M '
U;.*.lTINQ UAT~calAL: Y ILD t.iETAL O~,.7f.R C'Jin EKr: A 1".m TO BE 07517P,4 f/,CTUAL CCf.TCtT =
ernu .
RT;DT17:rilAL:
t CCf*.'SIWATiVELY
/4%i2D TO CS C37(It7iUAL -
Hrg;py = TFF ftT;;37 AFIER 13 EFW:
2000 1/4T.11CPF(ACTUAL A7PDT*
G4)
$ 3/4f, OOF (ACRIAL RTemy =
E
~ C307) m c CLinV E f PPLt:f M *i F3:4 f~
a CCDLCC?.;l HP7E3 L'? *iD 1MF/'43 FOR TiiF;~r!*%
. c i2r.:09 L'/ TO to UW t T
.I su CC!TiNTOIt*APGt! ?.C F 1U;? .N.o fa FT,9A f
CC'73LE l?!3TR*. CENT I
C'i!Gi;;3 o
if tsa -
( i
/
- r. ,
I
- 0 -,s' 23 p. '
- /
l <0 W;/
gh CCOLCCJM II ATES (Cf(HPJ -
I. l l l I O 9 0 1CD 22 0 230 C3 Q l IR0!CATED TE132HATURE (OF)
I ,
I (
BYROrl/33t.lC'A' COD CTA7:O:'3
?
RNAL C AFETY ,*JJALY3 3 ITIOrtT FIC' ' Pd 2.4.S. !
GYROff UtT 2 3'iACTG3 COOL /. IT I SYSTE.'.1 COOT.:C'J!?! L1.UTA7!C? '
AT'PLIC.*J.LG L'? TO_1ft rifPY ee I y
- j. p 35 ?C.3 i . .
f 1 ,
a e n M
&*ATEllfAL MCMim* BA'23 NYDRO COr7ER COMTENT: C0!"._SnVATIVELY M C;"JD TO Cr 41r,trPI N
};a7p* -
M f,'3y I.'!TTIAL: <FF gg Ri it'JTEFTEI410EIVY; *
< 1/4T,117f-2.4T, C;cp CV:1's"I/STLittf.lLE Foa '
I'.51G C? P.NCES L'." TO C.07M3 FOR TWI f:IRVICE N ^
fCR!OD CJ TO 10 0FP'/ .V;D O
, Cb:IT(d CS t.W:Gl?.3 OF ltr F
. , R K:D C') ?C'G FC3 Ft GmLE t
G.
rc 1:3ilL*?2?!T EPJ103S D
U o -
c
- n. -
O es 6-
<t o a 8
5 a:
tCO3 -. CCIT!^,N.17Y LC'1T C,:.t10 C:4!!C.LTV! 5 (TfC:'.C2TI.T C T ".7 5 T 2JJ.'.r.AT U.'d (;;.;f-)
. FOR THE MrN;cs
. . F2T. CD 1,~21015 E.21Y l
I #
} I I I g ___
o 1c3 r3 :>n e:3 cn U;DICATED TDJ2tRATUf1C (CF) u . ....
13./ R O .., s.,
v . i, c a.,. v. v ,.v0 e.. 4 . ..
. . r. .a FIN AL F.r ETY .* *ba.Y :: r.C 70?.T
- F!OUilE 3.+Ec, !
- LR/C/ COD U.4f T 2 H34.CTC .; CC.0L/o . i j SYSTD.i HE ATU? L'
- .:!YAT:0.'.S }
{~
g AFPLICAAE UP TO 13 N PY }
~
ypen.. . . - m.yv v nmy v. w m x wwm~ . . . a . :ecs
.e.
~~" ~~
'aPg x;.,
2614 N
- l
_ g ---
l LIATERfAL PRCSERTY lLS
( '
CD.'"PER CC'frEfff: CO**O*iRVATIV$LY a AS5UldED TG CICdu117%
fYTg;Tp (ftmAL: 4 JF
F ,
RTf TDAFTER 13 EF4Y:
- 1/4T,11C0F
, 3/47, ETCF CIIRVE /JPL!Cf.7 Cl) T-33 CCOLecl.TJ th'. TIS 1.'?10
- tC:47ntn FC*1 *ll'.?.C::NM l 2;);c - FE3IG3 U.' TO 13 E7 W 7:;D
]" .- CC;JrAl;G rJA?CWiOF IGF E /JfD C0 FC 3 FG3 6& 't2LE E It%n1U:.**JIT T.33&~G es z.: ,
1 3 .
~
8 w,
i n
a.
O tu.
S u .
1 6 -
.n.
j 1CCO - ~
7*
/.
0
/
m c:Ay/,.-
<3 p C') CCCLCC'.Ci P).TCS 1M pp;ua)
(
l I D I I I L-I O 2c0 Sco 300 (C3 E3 1
- INDICAffD Tn*2ERATURE (CF)
{ -
t, j ..
- . . =
L..,.. .u.,.,y . . . ..-~, ,. .. .. .....
, F :.. i. U,i Ti Y i . '.L . ..1...; .. ;
,_ {
FIGURE 3.'.-C).
- - }
DRAIC'.'lOOD Ut4tY 2 RE ACTO 6 CCOL/ .'- l*
SYSTET.1 CCOLGC'.'<ll Ll'.ilTA710!.3 Afi'llCAnLE UP TO 1'; G7PY A-
B/B-FSAR QUESTION 423.35 "The response to Item 423.14 is inadequate. Modify the initial test program to provide a description.of the inspections or tests'that will be performed following system operation to assure that all snubbers are operable."
RESPONSE
Snubbers will be inspected to be operable as defined in the
~
response to Question 110.63 during integrated hot functional testing. See revised Tables 14.2-54, 14.2-5P, and 14.2-60.
r-
. s 4
0423.35-1
B/B-FSAR QUESTION 450.2
" Standard Review Plan Section 6.5.2 (part II.2.a. 'Spe-cific D3 sign Requirements for Iodine Removal Function')
specifies : hat the containment spray system be designed
'to be initiated automatically...and should be capable of continuous operation thereafter until the design objectivcs of the system have been achieved. In all cases the operating period should not be less than two houre.' This criterion is normally met by automatic initiation and automatic switchover of the spray pumps to the recirculation mode. To determine if these criteria are met with the operator action proposed for Byron, discuss:
- 1) all the actions required of the operator to transfer the containment spray pumps to the recirculation mode,
- 2) the timing for the operator actions, including timing of instruments indicating that these actions are required, and
- 3) the permissible time intervals for operator actions, and the effects on system performance, including spray and sump pH variations, of delayed operator response."
RESPONSE
Refer to the response to Question 022.25.
6 i'
0450.2-1
. - . ._ . . - - ., .- . - __ .