Provides Actions Taken to Ensure & Verify Sys Design Basis Performance,Per 900205 SSFI at Facility
ML20012B621
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/08/1990
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003150426
Download: ML20012B621 (2)


Text

p :Y '

c '. ;, 1 CCN-90-14043

[ e M .. PHIfADELPHIA ELECTRIC COMPANY

\

4kt[ l'l.ACil IKTrIUM A10MIC M)WI.R STATION R. D.1. Ikix 208 Zh 1 -

Delta, l'ennsyh ania 17314 l N C IUrwu-Un Nm a os I Mut 4 Mt C17) 447014 D. M. $rnith Vice l'rrsklent March 8, 1990 Docket Nos. 50-277 50-278 i

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Units 2 and 3 Emergency Service Water System Action Plan to Verify Design Basis Flows

Dear Sir:

Background

On February 5, 1990, an inspection team from the Nuclear Regulatory Commission began a Safety System functional Inspection (SSFI) at i Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3 on the High Pressure Coolant Injection (HPCI) and the Emergency Service Water (ESW) systems. While responding to information requests and questions raised by the SSFI team, PECo became aware that existing field test data on the ESW system did not prove conclusively that design basis flow performance levels for this system have been met. Philadelphia Electric Company (PECo) is taking the following actions to ensure and verify system design basis performance.

Unit 2 On March 2, 1990 PBAPS Unit 2 began an orderly shutdown in preparation for a scheduled mid-cycle outage. Before restarting Unit 2, the adequacy of flows in the ESW system in Unit 2 will be proven conclusively. We are developing a program to 1) inspect 2) clean or replace portions of the system, as required, 3) upgrade instrumentation as required, and 4) test the ESW system so that flow performance levels comensurate with the design basis can be demonstrated. The information f

Qh 9003150426 90030s 73 #

'O hDR ADOCK 05000277 4 PDC {

o A.'- -

Document Control Desk March 8, 1990 j Page 2  ;

needed to prove conclusively that design basis flovl rates have been met {

will be made available for NRC review.

s Unit 3 i

As a result of information obtained by tests performed on PBAPS  ;

Unit 3 ESW system on March 4 and 5, 1990, we have concluded that continued operation of the unit is warranted under specific conditions. A  ;

Justification for Continued Operation outlining these conditions and the basis for our conclusion will be provided to the NRC before restart of the unit.

Two Unit Operation Prior to sustained two unit power operation we will demonstrate by a coordinated test conducted on both units that overall ESW flow performance levels are commensurate with the design basis for two units in operation. As with the previous programs, the NRC will be apprised of the methodology and results.

Very truly yours.

JAB:1c Jm DfA Attachment cc: W.-T. Russell, Administrator, Region 1. USNRC J. J. l.yash, USNRC Senior Resident inspector G. Y. Suh, Project Manager, USNRC i