MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED DISTRIBUTION DEMONS~TION SYSTEM 1~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthl 3& 4 911213 tr.repts for Nov 1991 for Turkey Point Units D DISTRIBUTION CODE: IE24D COPIES RECEIVED ILTR TITLE: Monthly Operating Report (per Tech Specs) i ENCL Q SIZE:
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2'A 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB PEB10 1 1 NRR/DOEA/OEAB R FILE 01 1 1 RGN2 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENIS:
PLEASE HELP US TO REDUCE WASFE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
ii' I P.O. Box 029100, Miami, FI33102-9100 DEC 1$ 'IS[
L-91-333 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the November 1991 Operating Status and Summary of Operating Experience. Reports for 'Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Reg'i:onal Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9112240319 911130 ADOCK 05000250 PDR
- R
~ wu-~ PDR 7p an FPL Group company
t' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE December 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 '46-6970 MONTH November 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/91 682 11/02/91 678 11/03/91 674 11/04/91 673 11/05/91 682 11/06/91 688 11/07/91 684 11/08/91 680 11/09/91 687 11/10/91 703 11/11/91 704 11/12/91 703 11/13/91 487 11/14/91 401 11/15/91 692 11/16/91 568 11/17/91 463 11/18/91 646 11/19/91 614 11/20/91 646 11/21/91 648 11/22/91 619 11/23/91 342 11/24/91 609 11/25/91 693 11/26/91 702 11/27/91 703 11/28/91 686 11/29/91 695 11/30/91 693
444k l
y
'I P
'll
OPERATING DATA RFPORT DOCKET NO 50 - 250 DATE 12/1 1/91 COMP!.ETED BY R. A. TIERNEY TELEPHONE 305/246/6970 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT
- 2. ttEPOR! ING PERIOD: NOVEMBER 199
- 3. 'CENSED THERMAL POWER (MliilT)E
- 4. NAMEPLATE RATING (GROEL MWE) I E. OEEIGN ELECTRICAL RATING (NET MWE):
UNIT 3 6, MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
- 7. MAXIMUM DEPENDABLE CAPACITY (NEt MWE):
8.:f 1
Ct(ANGES OCCUR IN CAPACITY RAIIN( 5 (ITEMS StNCE LAST REPORT, GlVE REASONSE
, 2200 760
'393 699 666 tEUMBER 3 THROUGH 7) 9 POWFR LEVEL TO WHICH RESTRICTED'P ANY (~ET MWE)
!0. Rf.ASUNS FOR RESTRICTIONS, IF ANY:
hIONTHLY YTO- CUMULATIVE 11 ~ I!OURS IN REPORT PERIOD: 720 8016 166449.6 3
2, NUMBLtt OF t!OURS REACTOR WAS CRITICAL 720.0 1508. 1 10598 1.3
- 3. Rf A< Tt)R RESFRVE SHUTDOWN HOURS, 0.0 0.0 844.4
'4. "Ot)R'ENERATOR ON-LINE 720.0 1411.8 104467 5
- 15. "I 'OBSERVE SHUTDOWN HOURS g~ 0.0 0.0 121.8 1 6 'E >'PS
~
THERMAL ENERGY GFNERATED (MWtt) t=a3685 2699222 216930864
- 7. LRE )5:3 t(LEI TR ICAI. EN RGY GENERATED (MWH) 482405 862070 69478061 3
8 - 'El > ft ECTRI CAL Et!ERGY GENERATED (MWH) 459450 798932 65677450
!9 v 1 SERVICE FACTOR 160 0 17. 6 62,8 2G UN) t AVAILABILITYFACTOR 100.0 17.6 62.8 2'.APACE)'Y FACTOR " USING MDC NE1) 95.8 15.0 60.4
- 2. E.Af'AC'. TY 1-AC10R (USING DER NET) 92.! 14. 4 56.9 23 Et I 1 3 OltCED OUTAGRE RATE 0.0 1.8 12.3
- 74. SEE"'1)OWNS SCHEDtt'D OVER NEX- 6 MONTHS
- 25. IF St'13 I DOWN A1 END OF REV')8 I 1'I:R lOU. Eb 1 I MAT ED DATE OF STARTUP t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 250 UNIT NAME Turkey Point II 3 pATE December ll, 1993.
COMPLETED BY - A Tierney REPORT MONTH November, 1991 TELEPHONE (305)246-6970 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor" Report¹ Code4 odes Prevent Recurrence 03 9111133 F 27:25 N/A RB CONROD Unit 3 reduced power due to control rods partially inserting into the core.
04 9111166 12r89 N/A CC VALVEX Unit 3 reduced power due to a reheat intercept valve failing to re-open within 5 mine.
05 911122 36:40 N/A Unit HC PUMPXX 3 reduced power to .repair the 3B Heater Drain Pump.
3 F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUAEG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Exphin) 5 G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
II
SUMMARY
OF OPERATING EXPERIENCE'OCKET NO. 50-250 UNIT Turke Point 3 DATE December 12 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH November 1991 While performing equipment repairs on the (manual/auto) station PCV-3-455C the Pressurizer Operating Reli.'ef Valve (PORV) was opened. Unit 3 reduced power on November 13', 1991 due to four (4) control rods in Rod Bank C partially inserting into the core.
This occurred during maintenance of a "Signal" card in the Rod Control Cabinet. Unit 3 returned to full power on November 14, 1991. Unit 3 reduced power on November 16, 1991 when the Southeast Reheat Intercept Valve failed to re-open within 5,minutes. The Reheat Intercept Valve was repaired and Unit 3 was returned to full power on November 17, 1991. .Unit 3 again reduced power on November 22, 1991 to repair the 3B Heater Drain Pump. Unit 3 was returned to full power on November 24, 1991.
II 0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE December 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH November 1991 AVERAGE DAILY POWER LEVEL (MÃe-Net) 11/01/91 281 11/02/91 287 11/03/91 485 11/04/91 668 11/05/91 675 11/06/91 654 11/07/91 681 11/08/91 679 11/09/91 685 11/10/91 692 11/11/91 692
'11/12/91 690 11/13/91 690 11/14/91 688 11/15/91 684 11/16/91 681 11/17/91 678 11/18/91 676 11/19/91 679 11/20/91 678 11/21/91 677 11/22/91 677 11/23/91 674 11/24/91 673 11/25/91 544 11/26/91 217 11/27/91 295 11/28/91 510 11/29/91 681 11/30/91 681
"1 Q(
t 4
i
)t 0
OPERATING DATA REPORT DOCKE1'O 50 - 251 DATE 12/11/91 COMPLETED BY R. A. TIFRNEY TELEPHONE 305/246/6970 0>ERAT ING STATUS UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORtING PERIOD: NOVEMBER l99l l 1CENSEO THERMAL POWER (MW>)6 2200 4 NAMEPLATE RATING (GROSS MWE): 760 6 'I'SIGN ELECTRICAI. RATIIIG (NET MITE)I 693
- 6. MAXIMUM OEPENOABLE CAPACITY (GROSS MNE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B. 1F CEIANGES OCCUR IN CAPACITY RA1 INIAS (I IEMS NUMBER 3 THROUGH 7)
SINCE AST REPORTS GIVE REASONS:
- 9. 1'OWER LEVEL TO WHICH RESTRICTED, IF ANY (NE> MWE) 10 REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. T(OURS IN RElrURT PERIOD: 720 8016 160181. 0 1 ~ PlUMBER OF HOURS REACTOR WAS CRITICAL 7'20. 0 864.6 102050. 9
- 3. Pra( tOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. TOU() S GENERATOR ON-LINE 720.0 782.7 98349.8
- 15. l>NI1 RCSERVE SHUTDOWN HOURS 0.0 0.0 32.}
1445968 1501489 207131549 (r((Umb ELLCTR I CAL ENERGY GENERATED (MWH) 460775 475130 66088010
- 18. Nl. '- f 1 Ei.,RICAL FNf 4GY GENERATED (MWH) 438067 434851 62488479
- 19. trW1,'ERVICE FACTOR 100. 0 9.8 61. 4
- 20. UN I .'vP ILABILI't'YFACTOR 100. 0 9.8 61.4
- -'1. CAP</I "~ FACTOR (U ING MDC FIET) 91. 8.1 4 59.7
~
- 22. LaPaLl 1 Y iALfOR '.AJSING DER NET) 87.8 7.8 56.3 23 Nl1 Fi)(lCED OU-n. 0 RATE 0.0 0.0 11.8 24 = SSl(ETDOWAIS SCHFOl . 0 /ER NEX ( MONTHS
.25~ <<F SHUf-DOWN AT END OF REPOR'1 PFRIOU. ESIIMAIED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
ff UNjT NAME Turke Foint P4" DATE December 11 1991 COMPLETED BY R. A. Tierney REPORT MONTH November, 1991 TELEPHONE 305 246-6970 Method of Shutting Ucensee Cause S Corrective Type'uration Down Event System Component Actionto Date (Hours) Reason2 Reactor Report¹ Code4 Codes Prevent Recurrence 911031 54 44 B IC INST RU Unit 4 reduced power for current adjust-ments on the Nuclear Instrumentation System (NIS).
911125 68:30 N/A SG COND Unit 4 reduced power to perform repairs on a condenser tube leak.
2 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training 8 License Examination 5 - Load Reduction F - Administrative 9 - Other(Exphin)
G - Operational Error(Exphin) Exhibit1-Same Source H - Other(Exphin)
~ l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE December 'll 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH November 1991 Unit 4 reduced power on October 31, 1991 to perform current adjustments on the Nuclear Instrumentation System (NIS) . Unit 4 was returned to full power on November 3, 1991. Unit 4 reduced power on November 25, 1991 to perform repairs on a Condenser Tube leak. The unit was returned to full power. on November 28, 1991.
0 0 1 1
8, ~