ML17353A597

From kanterella
Revision as of 21:24, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr
ML17353A597
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/29/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-067, L-96-67, NUDOCS 9603190371
Download: ML17353A597 (17)


Text

AU'AH.NAME KNORR,J.E.

HOVEY,R.J. Flor)da AFFILIATION Florpda Power Power

~

CATEGORY 1 REGULATCiO INFORMATION DISTR ECTION %STEM (RIDE)

C.>>>>>>

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light

'U'AR Tight Light Co.

Co.

il'i

".J'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C

C DOCKET 05000250 05000251

¹ RECIP.NAME RE)IPIENT AFFILIATION

'J SUBJECT.: Month}y repts for Feb 1996 for Turkey Point Units 3 & 4 960313 DISTRjBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL I SIZE: !Q TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPL'ENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1. PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB '1 1 FILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 R 1 1 FRATERNAL LITCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUl'RED: LTTR 9 'ENCL

E I

'L

FPL NAR13 1996 L-96-067 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Robert J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant yBOO54 e~OS1~0S71 Vao~ae PDR ADOCK 05000250 R PDR an FPL Group company

1 iP

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 3/ 7/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 696 1440 203697.6
12. NUMBER OF HOURS REACTOR 550.3 1294.3 138200.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LZNE 526.6 1270.6 136166.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 3%$ 768 2rSV227 2FK61246
17. GROSS ELECTRICAL ENERGY GENERATED (MWHj 323526 862310 91099295
18. NET ELECTRZCAL ENERGY GENERATED (MWH) 306886 821685 86235081
19. UNIT SERVICE FACTOR 75.7 88.2 66.8
20. UNIT AVAILABILITYFA 75.7 88.2 66.9
21. CAPACITY FACTOR (USING MD 66.2 85.7 64.5
22. CAPACITY FACTOR (USING DER NET) 63.6 82.3 61.1
23. UNIT FORCED OUTAGE RATE 24.3 11.8 11 '
24. SHUTDOWNS SCHEDULED OVER NONE
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

IP 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

ZL25Q.

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason'ethod of Event code'ause code'caponent System 4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 01 960201 0.0 N/A FILTERS GRASS fOULING Of INTAKE SCREENS/STRAI HERS 02 960201 0.0 N/A HH HTEXCH WATER BOX CLEANING 03 960201 0.0 N/A HB VALVEX TURBINE VALVE TEST 04 960209 53.5 LER 96- CC HTEXCH AUTO TRIP DUE TO HIGH S/G WATER 002 LEVEL 05 960212 0.0 N/A CH VALVEX FAILURE Of MAIN FEEDWATER PUMP CHECK VALVE 06 960216 83.5 N/A fI LTERS GRASS FOULING Of INTAKE SCREENS/STRAINERS 07 960219 32.4 NA RB INSTRU ROD CONTROL PROBLEMS

F - Forced Reason Method Exhibit 0 - Instructions Exhibit 1 - same Source S - Scheduled A - Equipment Failure 1 - Manual for preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 - Load Reduction License Examination 9 Other (Explain)

F C - Administrative Operational Error (Explain)

H Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96 317 02/02/96 371 02/03/96 685 02/04/96 699 02/05/96 709 02/06/96 707 02/07/96 702 02/08/96 686 02/09/96 604 02/10/96 0 02/11/96 0 02/12/96 246 02/13/96 379 02/14/96 384 02/15/96 371 02/16/96 58 02/17/96 0 02/18/96 0 02/19/96 0 02/20/96 0 02/21/96 383 02/22/96 683 02/23/96 686 02/24/96 687 02/25/96 687 02/26/96 686 02/27/96 686 02/28/96 686 02/29/96 686

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 began operation for the month at 60% reactor power. Power was reduced to 40% for a turbine valve test on February 2. Power was returned to 60% power for waterbox and heat exchanger cleaning on February 2 and taken to 100% power on February 3.

The unit remained at essentially 100% power until February 9. On February 9 power was reduced to 60% power for waterbox cleaning and testing of a main feed water pump discharge check valve.

During this testing an automatic reactor trip occurred on February 9 due to hi-hi steam generator water level, which is discussed in LER 96-002. The unit was restarted on February 11 and operated at approximately 60% during repair of the main feed water pump discharge check valve. On February 16 the unit was taken to Mode 3 due to a grass influx into the intake and remained off line until February 19. The unit was taken to Mode 2 on February 19 however returned to Mode 3 due to rod control problems. The unit was returned to power on February 21 and remained at essentially 100% power through the end of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96 689 02/02/96 688 02/03/96 689 02/04/96 698 02/05/96 709 02/06/96 709 02/07/96 707 02/08/96 704 02/09/96 700 02/10/96 693 02/11/96 692 02/12/96 697 02/13/96 701 02/14/96 700 02/15/96 697 02/16/96 695 02/17/96 703 02/18/96 705 02/19/96 700 02/20/96 695 02/21/96 690 02/22/96 681 02/23/96 675 02/24/96 681 02/25/96 681 02/26/96 678 02/27/96 678 02/28/96 670 02/29/96 664

C OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 3/ 7/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2200 4 . NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 696 1440 197429.0
12. NUMBER OF HOURS REACTOR 696.0 1440.0 134925.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 696.0 1440.0 130833.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 ST59845 YKE33102
17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 504313 1046564 88585705
18. NET ELECTRICAL ENERGY GENERATED (MWH) 481644 999512 83884427
19. UNIT SERVICE FACTOR 100.0 100.0 66.3
20. UNIT AVAILABILITYFA 100.0 100.0 66.6
21. CAPACITY FACTOR (USING MD 103.9 104.2 64.7
22. CAPACITY FACTOR (USING DER NET) 99.9 100.2 61.3
23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2
24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR MARCH 1996
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason Method of Event Systen Code Code'ause Conponent 4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports N/A F - Forced Reason Method Exhibit 0 - Instructions Exhibit 1 - Sane Sourco S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 - Autonatic Scran Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG 0161)

E - Operator Training 4 5 - Load Reduction License Exan (nation 9 - Other (Explain)

F - Adninistratlve C - Operational Error (Explain)

H - Othor (Explain)

)

J

~ ~

DOCKET NO.

UNIT'ATE'EPORT MONTH Unit 4 operated at essentially 100% reactor power for the month.

A T,, coast down, due to fuel depletion, was begun at the end of the month in anticipation of the scheduled refueling shutdown on March 4.

.0 1 lt