ML17354A923

From kanterella
Revision as of 21:12, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr
ML17354A923
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-128, NUDOCS 9805210073
Download: ML17354A923 (15)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9805210073 DOC.DATE: 98/04/30 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

,50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Apr 1998 for Turkey Point, Units 3 8 4.W/980511 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ILE CENTER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESKa(DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

g ~

MAY II <<w L-98-128

~

APL. 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April 1998 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. I-Iovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 98052sooVS VsonS0 Il PDR ADQCK 05000250 R PDR g an FPL Group company

~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 ONT: k k M DATE: M H H OM!'~6-COMTLHTHOBY: C.

REPORT MONTH ~Aril 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 4/1/98 713 4/2/98 712 4/3/98 709 4/4/98 710 4/5/98 713 4/6/98 712 4/7/98 712 4/8/98 715 4/9/98 713 4/1 0/98 713 4/11/98 721 4/12/98 729 4/1 3/98 729 4/14/98 728 4/1 5/98 722 4/16/98 717 4/1 7/98 716 4/1 8/98 713 4/1 9/98 712 4/20/98 709 4/21/98 707 4/22/98 707 4/23/98 714 4/24/98 717 4/25/98 717 4/26/98 716 4/27/98 714 4/28/98 708 4/29/98 712 4/30/98 710

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE ~Ma 6 1998 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD ~Aril 1998 (MonthiYear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 719.0 2798.5 155916.3
4. Number of Hours Generator Was On Line 719.0 2789.8 153748.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 513852.0 2005542.0 '8418098.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point N3 DATE: M~S6 1998 COMPLETED BY C.

TELEPHONE: 305 246-6204 REPORT MONTH ~Aril 1998 No. Type'uration Reasona Method of Corrective Action Reactor'ause 6

(Hours) Shutting Coradcents Doacn N/A N/A N/A r rorotd attach

-theo era 5 Srhtaaltd h Sdstihaht railhct 1 acassal 5 acatstthahct oc Stat 1 acassal sccah C atrwlihd ) hatchatic sects D stptlatocv rtatrictios ~ CthtihWd 1 cptcatoc Tcaih1hs 1 5 toad htdhctlch ticthat sxasthatach cesar lrxplalsl c - adhthiatratlw d Optca'tiosal Srroc C txplais'1 8 Cesar icxplalh)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~ki 50-250 M~599

<<I COMP HTHCHT: C.

9'LH CNH:

REPORT MONTH ~Aril 1998 Unit 3 operated at essentially 100% power for the entire month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-25 I UNk: k i kk DATE:

CO kkk k

kkQNE:

~: ~C 6

RRPORT MONTH ~Aril 1998 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 4/1/98 712 4/2/98 710

'08 4/3/98 4/4/98 710 4/5/98 714 4/6/98 715 4/7/98 715 4/8/98 718 4/9/98 713 4/1 0/98 712 4/1 1/98 720 4/12/98 729 4/13/98 728 4/14/98 726 4/15/98 723 4/1 6/98 718 4/17/98 717 4/1 8/98 714 4/1 9/98 713 4/20/98 709 4/21/98 708 4/22/98 707 4/23/98 715 4/24/98 719 4/25/98 717 4/26/98 ?18 4/27/98 715 4/28/98 709 4/29/98 713 4/30/98 712

4

~

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE ~Ma 8 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD ALII 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 719.0 2879.0 152186.5
4. Number of Hours Generator Was On Line 719.0 2879.0 147855.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 514290.0 2068983.0 95560620.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point 84 DATE: ~Ma 6 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH ~Aril 1998 No. Date Duration Reasona Method Cause 6 Corrective Action to (Hours) of prevent Recurrence Shutting Down Reactora N/A N/A N/A N/A H/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative 6 - Operational Error (Explain)

H Other (Explain)

~ ~

\

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE:

COMPLETE BY: C. L. Mowre TELEPHONE:

REPORT MONTH ~Aril 1998 Unit 4 operated at essentially 100% power for the entire month.

4