Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr
ML17354B131
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1998
From: Hovey R, Mowery C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-262, NUDOCS 9810190333
Download: ML17354B131 (9)


Text

PRI OCT 12 lS98 L-98-262 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3.and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 1998 Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant eezoceosSS e809S0' PDR ADQCK 05000250, R PDR g an FPL Group company

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 CMT: I DATE: October 5 1998 COMPLE EDBT.

TBLEPHOMI: ~6 C..M RBPDRTMDHTH 6 I DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 9/1/98 694 9/2/98 707 9/3/98 694 9/4/98 693 9/5/98 693 9/6/98 697 9/7/98 696 9/8/98 696 9/9/98 691 9/1 0/98 691 9/11/98 695 9/12/98 701 9/13/98 706 9/14/98 704 9/1 5/98 705 9/16/98 711 9/17/98 706 9/1 8/98 700 9/1 9/98 332 9/20/98 265 9/21/98 0 9/22/98 0 9/23/98 0 9/24/98 0 9/25/98 0 9/26/98 0 9/27/98 0 9/28/98 0 9/29/98 0 9/30/98 0

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE October 5 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD Se tember 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693

/

MONTH -YTD- CUMULATIVE

3. Number of Hours Reactor Was Critical 480.0 6230.5 159348.3
4. Number of Hours Generator Was On Line 480.0 6221.8 157180.7
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 314316.0 4348081.0 100760637.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point P3 DATE: October 5 19M COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 RBPQRT MONTH ~Bb 99 No. Type Duration Reason Method of Corrective Action (Hours)

Reactor'ause Shutting Down c

Cccments 1998 9/21/98 240.0 Shut down for refueling, tripped automatically at 8%

0001 power due to Intermediate Range N35 misadjustment F - Forced Reason Method 1 - Manual S - Scheduled A - Equipment Failure 2 - Manual Scram B - Maintenance or Test 3 Automatic Scram C - Refueling 4 Continued D - Regulatory restriction 5 - Load Reduction E - Operator Training & 9 Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DM.66M DOCKET NO. 50-250 DATE:

COMPLETED 1'ELHPHONE. '~6 BY:C D

6 EEPDETMONTH~PE 6

/

Unit 3 operated at essentially 100 % reactor power until September 19, 1998. Then power was lowered to approximately 50% in preparation for a refueling outage. While completing the shutdown for the refueling outage on September 21, 1998, the unit automatically tripped when power dropped below 8 % before the Excore Intermediate Range Channel N35 high power trip had reset (see LER 250/98-004). The unit remained shut down for refueling for the remainder of the month, and is expected to restart on or about October 24, 1998.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: ct ber 5 1998 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 RBPDRTMDNTH S b DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 9/1/98 698 9/2/98 712 9/3/98 693 9/4/98 697 9/5/98 697 9/6/98 701 9/7/98 701 9/8/98 701 9/9/98 697 9/1 0/98 695 9/11/98 698 9/12/98 705 9/13/98 711 9/14/98 708 9/1 5/98 709 9/16/98 715 9/1 7/98 712 9/1 8/98 707 9/1 9/98 705 9/20/98 704 9/21/98 701 9/22/98 696 9/23/98 695 9/24/98 647 9/25/98 407 9/26/98 697 9/27/98 709 9/28/98 706 9/29/98 705 9/30/98 698

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE October 5 1998 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD Se tember 1998 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720 i2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 720.0 6551.0 '55858.5
4. Number of Hours Generator Was On Line 720.0 6551.0 151527.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 497431.0 4603063.0 98094700.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: 4 Pl ¹4 DATE: October 5 1998 COMPLETED BY: R.L.

TELEPHONE: 4444 M 4 ll¹PQ¹1'M4444¹RS 4 Date Type Duration Reason Method of r Corrective Action to

{Hours)

Reactor'ause Shutting Dawn Prevent Recurrence 1998 9/24/98 0.0 Precaution for Hurricane Georges 0002 F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Hanual Scram C - Rei'ueling 3 - Automatic Scram D - Regulatory restriction i - Continued E - Operator Training r 5 - Load Reduction License Examination 9 - Other tExplain)

F - Administrative G - Operational Error tExplain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 Turke Point 04 DATE: October 5 1998 COMPLETE BY: ~C.. M TELEPHONE: 305 246-6204 RRP OR T M ORTH ~RRPP

/

Unit 4 operated at essentially 100% until September 24, 1998. With the approach of Hurricane Georges, reactor power was lowered to 50 % as a precautionary measure. When the threat of hurricane force winds was past, the National Hurricane Center downgraded the hurricane warning to a tropical storm'warning on September 25, 1998, and preparations were made to return power to 100%. After plant personnel verified that no damage had occurred, power was returned to 100% on September 26, 1998.