ML19123A349

From kanterella
Revision as of 02:50, 30 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Meeting Summary - Vogtle Electric Generating Plant, Docket Nos. 05000025 and 05000026
ML19123A349
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/01/2019
From: George Khouri
NRC/RGN-II
To: Nicole Coovert
NRC/RGN-II
George Khouri, RII/DCO
References
Download: ML19123A349 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 1, 2019 MEMORANDUM TO: Nicole Coovert, Chief Division of Construction Oversight Inspection Branch 1 FROM: George Khouri, Senior Construction Engineer /RA/

Division of ConstructionOversight Inspection Branch 1

SUBJECT:

PUBLIC MEETING

SUMMARY

- VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 05200025 AND 05200026 On April 25, 2019, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of Vogtle Electric Generating Plant, Units 3 and 4, in Waynesboro, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Vogtle Electric Generating Plant, Units 3 and 4, for the period of January 1, 2018 - December 31, 2018. Enclosed are a list of attendees and a copy of the poster boards displayed at the meeting.

Docket Nos. 05200025 and 05200026

Enclosures:

1. List of Attendees
2. Poster Boards CONTACT: George Khouri, RII/DCO/B1 404-997-4457

ML19123A349 OFFICE RII:DCO NAME G. Khouri DATE 5/ 1/2019