Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021
ML21154A277
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/20/2021
From: Bill Gleaves
NRC/NRR/VPOB
To: Philip Mckenna
NRC/NRR/VPOB
Gleaves B
References
ML21144A236
Download: ML21154A277 (5)


Text

July 20, 2021 MEMORANDUM TO: Philip McKenna, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: William Billy Gleaves, Sr. Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON MAY 27, 2021 The U.S. Nuclear Regulatory Commission (NRC) staff held an observation public meeting with Southern Nuclear Operating Company (SNC) on May 27, 2021. The purpose of the meeting was a presubmittal meeting for SNC and NRC staff to discuss details included in, and supporting, its draft request for an alternative to the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section III, for Vogtle Electric Generating Plant (VEGP), Unit 3, in order to support a more streamlined staff review. Key points discussed related to the qualification plan for the welding procedure, testing that supported the qualification, and the examination of the weld material remaining after the repair has been completed. NRC staff and SNC staff and contractors participated in the call. There was one member of the public who identified themselves at the meeting and no questions were directed to the staff. The meeting ended at approximately 9:50 a.m. EST.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML21141A139. The meeting notice was also posted on the NRC public meeting schedule webpage. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively.

The documents referenced during the discussion can be found at the ADAMS Accession Nos.

given below:

SNCs Updated Draft ASME Code Alternative ALT-16 ML21144A236 CONTACT: W. Gleaves, NRR/VPO (301) 415-5848

P. McKenna The VEGP, Unit 3 containment vessel, an ASME Section III, Class MC pressure vessel, received the ASME Code certification mark from the N certificate holder, Chicago Bridge and Iron (CB&I). Subsequently, SNC discovered that six pieces of Unistrut were welded to the vessel in three locations. The purpose of the meeting was to discuss SNCs plans to address these Unistruts and the associated welds and submit an ASME Code alternative to NRC for review. SNCs presentation referred to the document listed above (i.e., the updated draft alternative). SNC provided additional details as to the progress that it has made in completing the qualification of the weld procedure, testing supporting that qualification, and the surface examinations planned for the post-repair welds on the containment vessel.

Following the presentation, the main comments of the NRC staff were summarized as follows:

Clarify by providing details of how the ASME Code,Section III and Section IX, was used for the weld procedure qualification. Consider providing an attachment with complete weld procedure qualification and test results. Consider providing how the impact testing was performed and what paragraphs of NE-4335 were used, including taking into consideration the notes in Table NE-4622.7(b)-1 regarding exemptions to mandatory post-weld heat treatment. Clearly state the type of weld (e.g., full penetration, attachment, etc.) being qualified with regards to the corresponding impact testing requirements used in accordance with ASME Code,Section III.

Consider providing the specific surface examinations (e.g., magnetic particle) and the justification of why the type of surface examinations proposed will provide reasonable assurance of detecting defects in the weld remnant and its heat affected zone after the repair is complete.

Docket No.: 52-025

Enclosures:

As stated cc w/encls: See next page

ML21154A277 *via e-mail NRR-106 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/NVIB NAME WGleaves* (c) RButler* CSantos* ABuford*

DATE 7/3/21 7/7/21 7/7/21 7/14/21 OFFICE BC: NRR/VPO PM: NRR/VPO NAME PMcKenna* WGleaves* (s)

DATE 7/20/21 7/20/21 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, May 27, 2021 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Teleconference List of Attendees Thursday, May 27, 2021 Name Organization Representing the Nuclear Regulatory Commission Armstrong, Garry Baily, Marissa Bowman, Greg Caldwell, Robert Coovert, Nicole Eargle, Jason Gaslevic, James Gleaves, Billy Honcharik, John King, Mike NRR and Region II Lee, Brian Lopez-Santiago, Omar McKenna, Philip Mitchell, Matthew Patel, Chandu Rankin, Jennivine Spencer, Michael Welch, Christopher Widrevitz, Dan Wittick, Brian Representing SNC Caver, Kyle Chapman, Nathan Dorsey, Keith Foley, Ryan Grant, Eddie Kellenberger, Nicholas Southern Nuclear Operating Company Murrow, Calvin Musto, Tom Schully, Justin Wilson, Mark Yox, Michael Representing SNC Contactors Gould, Andrew CB&I Services Hand, Steve CB&I Services Southern Nuclear Operating Companys Presley, Lee CB&I Services contactors Lockman, Steve CB&I Services Matthews, John CB&I Services Representing the Public Wayne Marquino Note: All participated via Microsoft Teams and teleconference.