May 15, 2020 MEMORANDUM TO:
Victor Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM:
Jennivine Rankin, Project Manager /RA/
Vogtle Project Office Office of Nuclear Reactor Regulation
SUBJECT:
AUDIT PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, REQUEST FOR LICENSE AMENDMENT:
CORE MAKEUP TANK BORON CONCENTRATION REQUIREMENTS (LAR 20-004)
By letter dated April 30, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML20121A288), Southern Nuclear Operating Company (the licensee) requested an amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The requested amendment would change the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD) Tier 2 information and involves changes to the plant-specific Technical Specifications (COL Appendix A).
The requested amendment would revise the upper limit of the Core Makeup Tank (CMT) boron concentration Technical Specification (TS) Surveillance Requirement (SR), the mass of trisodium phosphate (TSP) required by TS Limiting Condition for Operation (LCO) and associated SR, and the frequency of performance of the CMT boron concentration TS SR.
CONTACT: Jennivine Rankin, NRR/VPO 301-415-1530
The Nuclear Methods, Systems, and New Reactors Branch, the Technical Specifications Branch, and the Corrosion and Steam Generator Branch (SNRB, STSB, and NCSG) plan to conduct an audit to gain a better understanding of the proposed changes and to review related documentation and non-docketed information in order to evaluate the acceptability of the proposed changes to the license.
Docket Nos.: 52-025 and 52-026
Enclosure:
Regulatory Audit Plan cc: See next page
ML20133K106 *Via email NRO-008 OFFICE NRR/VPO/PM NRR/VPO/LA NRR/DNRL/NCSG/BC NRR/DSS/SNRB/BC NAME JRankin RButler SBloom*
RPatton*
DATE 5/13/20 5/12/20 5/13/20 5/13/20 OFFICE NRR/DSS/STSB/BC NRR/VPO/BC NRR/VPO/PM NAME VCusumano*
VHall JRankin DATE 5/13/20 5/14/20 5/15/20
Vogtle Mailing List (Revised 4/7/2020) cc:
Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)
Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) gam@nei.org (Gia Montserrat)
Lindsay@georgiawand.org (Lindsay Harper) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett)
Michelle@cleanenergy.org (Michelle Powell)
Page 2 of 3
Vogtle Mailing List sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge)
X2edgran@southernco.com (Eddie R. Grant)
X2hagge@southern.com (Neil Haggerty)
X2dwwill@southernco.com (Daniel Williamson)
Page 3 of 3
Enlosure AUDIT OF REPORTS AND CALCULATIONS IN SUPPORT OF REQUEST FOR LICENSE AMENDMENT RELATED TO CORE MAKEUP TANK BORON CONCENTRATION REQUIREMENTS (LAR 20-004)
SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 DOCKET NOS.52-025 and 52-026 The purpose of the audit is to review the documentation and calculations needed by the U.S. Nuclear Regulatory Commission (NRC) staff to verify the information and conclusions in the Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004) submitted by Southern Nuclear Operating Company (SNC) for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20121A288).
A.
Background:
In LAR 20-004, SNC requests changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD)
Tier 2 information and involves changes to the plant-specific Technical Specifications (COL Appendix A).
The LAR includes proposed changes to revise the upper limit of the Core Makeup Tank (CMT) boron concentration Technical Specification (TS) Surveillance Requirement (SR),
the mass of trisodium phosphate (TSP) required by TS Limiting Condition for Operation (LCO) and associated SR, and the frequency of performance of the CMT boron concentration TS SR.
B. Regulatory Audit Basis This regulatory audit is based on the following:
VEGP Units 3 and 4 UFSAR Tier 2, Revision 8, June 14, 2019 (ADAMS Accession No. ML19171A096).
VEGP Unit 3, Current Facility Combined License NPF-91 (ADAMS Accession No. ML14100A106).
VEGP Unit 4, Current Facility Combined License NPF-92 (ADAMS Accession No. ML14100A135).
C. Regulatory Audit Scope and Methodology The audit team will view the documentation and calculations that provide the technical support for LAR 20-004. Information to be reviewed involves the detailed calculations used to support the changes to the mass of TSP and the Computational Fluid Dynamic modeling temperature calculations. Updated and new operational procedures associated with the proposed changes to the UFSAR will also be reviewed. This includes procedures that ensure CMT boron concentrations remain above the minimum TS limit (e.g., licensee actions when obtaining sample below 4375 parts per million during the 31 day interval) and procedures associated with actions from a CMT top high temperature alarm.
2 In addition, the audit team will request to discuss these topics with subject matter expert(s).
D. Information and Other Material Necessary for the Regulatory Audit The staff requests that the documents, data, and calculations regarding the aforementioned topics be made available to the staff in the electronic reading room:
The staff acknowledges and will observe appropriate handling and protection of proprietary information made available for the audit.
E. Audit Team The following are the NRC audit team members.
Tony Gardner, Physical Scientist Joshua Miller, Nuclear Engineer Matthew Yoder, Senior Chemical Engineer John Budzynski, Nuclear Engineer Stephen Smith, Senior Safety and Plant Systems Engineer Jennivine Rankin, Project Manager Olivier Lareynie, Nuclear Engineer (Foreign Assignee)
The licensee contact is Ryan Henderson.
F. Logistics Date: May 18, 2020 - June 19, 2020 Location: The audit will be conducted remotely using the licensees electronic reading room and teleconferences.
G. Special Requests None Jennivine Rankin, NRC Project Manager, can be reached at 301-415-1530 or Jennivine.Rankin@nrc.gov.
H. Deliverables On completion of the audit, the staff will prepare an audit summary report that will be declared and entered as an official agency record in ADAMS. The audit outcome may be used to identify any additional information to be submitted for making regulatory decisions and will assist the staff in the issuance of requests for additional information (if necessary) in completing its review of LAR 20-004.