Letter Sequence Meeting |
---|
EPID:L-2021-LRM-0108, Pre-Submittal Meeting Regarding Proposed Revision to Technical Specification (TS) 5.5.16 for Farley Nuclear Plant (Farley), Units 1 and 2; and Vogtle Electric Generating Plant (Vogtle), Units 1 and 2 (Open) |
|
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24283A2022024-10-0909 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 16, 2024 - Proposed Vogtle 3 and 4 Flexibility Modes LAR ML24282A9822024-10-0808 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 Passive Residual Heat Removal Actuation Logic Changes License Amendment Request ML24260A0792024-09-23023 September 2024 9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides ML24192A2262024-07-11011 July 2024 Mtg to Exchange Technical Information Regarding Farley, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process for Evaluation (EPID L-2024-LRM-0086) - Slides ML24190A1082024-07-0808 July 2024 NRC Slides-07/11/2024 Mtg to Exchange Technical Information Regarding Joseph M. Farley Nuclear Plant, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process ML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24134A1062024-05-13013 May 2024 2023 Annual Assessment Meeting Presentation Slides ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24088A1662024-04-0303 April 2024 SNC Slides - Pre-Submittal Meeting on April 3, 2024 - Farley LAR Changing TS 3.6.5 Containment Air Temperature Using RIPE ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21280A0012021-10-31031 October 2021 Pre-Submittal Meeting Presentation from SNC to Discuss a Future LAR Regarding Change TS to Increase Containment Peak Pressure to Address Several NSALs ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21172A1312021-07-0101 July 2021 Pre-Submittal Meeting Alternate Source Term and TSTF-490 ML21173A0632021-06-24024 June 2021 Pre-Application SNC Presentation Slides - Removal of Encapsulations from Recirculation Suction Valves ML21193A0772021-06-24024 June 2021 Exemption from Operator Written Examination and Operating Test for Unit 4 Licenses, 6-24-21 Pre-submittal Meeting ML21085A4902021-05-19019 May 2021 Risk-informed Resolution of Generic Letter 2004-02 ML21064A3652021-03-0101 March 2021 Dashboard Report 3-1-2021 2024-09-23
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24317A0032024-11-12012 November 2024 Slides - SNC Presentation - Pre-Submittal Meeting on November 18, 2024 - Proposed Vogtle 3 and 4 SR TS 3.3.15 and TS 3.3.16 Licensing Amendment Request ML24317A2232024-11-12012 November 2024 Slides - SNC Presentation - Pre-Submittal Meeting on November 19, 2024 - Proposed Vogtle 3 and 4 Modes 5 and 6 LAR ML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24283A2022024-10-0909 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 16, 2024 - Proposed Vogtle 3 and 4 Flexibility Modes LAR ML24282A9822024-10-0808 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 Passive Residual Heat Removal Actuation Logic Changes License Amendment Request ML24260A0792024-09-23023 September 2024 9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides ML24192A2262024-07-11011 July 2024 Mtg to Exchange Technical Information Regarding Farley, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process for Evaluation (EPID L-2024-LRM-0086) - Slides ML24190A1082024-07-0808 July 2024 NRC Slides-07/11/2024 Mtg to Exchange Technical Information Regarding Joseph M. Farley Nuclear Plant, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process ML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24134A1062024-05-13013 May 2024 2023 Annual Assessment Meeting Presentation Slides ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24088A1662024-04-0303 April 2024 SNC Slides - Pre-Submittal Meeting on April 3, 2024 - Farley LAR Changing TS 3.6.5 Containment Air Temperature Using RIPE ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23304A2682023-11-0707 November 2023 License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23293A0052023-10-20020 October 2023 Lessons Learned from the ITAAC Hearing Process for Vogtle 3 and 4 ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23072A1802023-03-13013 March 2023 2023 RIC Powerpoint Slide Presentation, Vogtle 3: Journey from Construction to Operations ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22335A5542022-12-0101 December 2022 Slides - SNC Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request - ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22126A0012022-05-0606 May 2022 SNC Slides - Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemptions ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final 2024-09-23
[Table view] |
Text
SNC Pre-Submittal Meeting for License Amendment Request to Relocate Augmented Piping Inspection Program Details from Technical Specifications to a Licensee Controlled Document November 2021
2 Meeting Purpose and Agenda
- The purpose for this meeting is to discuss proposed amendment request to revise both Farley and Vogtle Technical Specification (TS) 5.5.16 to relocate program details from the plants Technical Specifications.
- This meeting will cover the following topics:
- Proposed License Amendment Request
=
Background===
4 Background
- TS 5.5.16 for Farley and Vogtle provides details of an augmented inservice inspection program for high energy lines outside of containment.
- Applies to welds in piping systems or portions of piping systems located outside of containment where protection from the consequences of postulated ruptures is not provided.
Farley main steam lines Vogtle main steam and main feedwater lines
- Established to meet design criteria in BTP MEB 3-1 (now BTP 3-4) during initial licensing of Farley and Vogtle.
Proposed License Amendment Request
6 Proposed License Amendment Request Reason for the change
- The relocation of program details does not change the inspection program.
- These details are design criteria and are more appropriately contained in the respective plants UFSARs.
7 Farley Technical Specification 5.5.16 Current TS 5.5.16 The three main steamlines from the rigid anchor points of the containment penetrations downstream to and including the main steam header shall be inspected. The extent of the inservice examinations completed during each inspection interval (IWA 2400, ASME Code, 1974 Edition,Section XI) shall provide 100 percent volumetric examination of circumferential and longitudinal pipe welds to the extent practical. The areas subject to examination are those defined in accordance with examination category C-G for Class 2 piping welds in Table IWC-2520.
Proposed TS 5.5.16 In accordance with the augmented inservice inspection program for high energy lines outside of containment, examinations of welds in the main steam lines of each unit shall be performed to provide assurance of the continued integrity of the piping systems over their service lifetime. These requirements apply to welds in piping systems or portions of systems located outside of containment where protection from the consequences of postulated ruptures is not provided by a system of pipe whip restraints, jet impingement barriers, protective enclosures and/or other measures designed specifically to cope with such ruptures.
8 Vogtle Technical Specification 5.5.16 Current TS 5.5.16 This program shall provide for the inspection of the four Main Steam and Feedwater lines from the containment penetration flued head outboard welds, up to the first five-way restraint. The extent of the inservice examinations completed during each inspection interval (ASME Code Section XI) shall provide 100% volumetric examination of circumferential and longitudinal welds to the extent practical. This augmented inservice inspection is consistent with the requirements of NRC Branch Technical Position MEB 3-1, "Postulated Break and Leakage Locations in Fluid System Piping Outside Containment," November 1975 and Section 6.6 of the FSAR.
Proposed TS 5.5.16 In accordance with the augmented inservice inspection program for high energy lines outside of containment, examinations of welds in the main steam and main feedwater lines of each unit shall be performed to provide assurance of the continued integrity of the piping systems over their service lifetime. These requirements apply to welds in piping systems or portions of systems located outside of containment where protection from the consequences of postulated ruptures is not provided by a system of pipe whip restraints, jet impingement barriers, protective enclosures and/or other measures designed specifically to cope with such ruptures.
Evaluation
10 Evaluations Performed
- This proposed TS change will relocate TS details, and requires:
- no physical plant modifications,
- no change to augmented inspection program,
- no change to scope of augmented inspection program or its regulatory basis.
- Requested change is evaluated against the technical specification criteria in 10 CFR 50.36(c), criteria 1 through 8. Existing TSs which do not satisfy these specified criteria may be relocated to licensee-controlled documents.
11 Technical Specification Criteria - Safety Limits (1) Safety limits for nuclear reactors are limits upon important process variables that are found to be necessary to reasonably protect the integrity of certain physical barriers that guard against the uncontrolled release of radioactivity.
- The details in TS 5.5.16 are not safety limits or limiting safety system settings. They describe an augmented inspection program for certain secondary system high energy piping.
- This proposed TS change does not meet the Safety Limits criterion.
12 Technical Specification Criteria - Limiting Condition for Operation
- (2) Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility.
- Criterion 1 - Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
- Criterion 2 - A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier
- Criterion 3 - A structure, system or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
- Criterion 4 - A structure, system or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
- No requirement for a structure, system or component is being relocated from the TS.
- This proposed TS change does not meet the limiting Condition for Operation criterion.
13 Technical Specification Criteria - Surveillance Requirements, Design Features (3) Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
- These surveillance requirements are linked to Limiting Conditions for Operation. TS 5.5.16 is not a Limiting Condition for Operation.
- Therefore, this proposed TS change does not meet the Surveillance Requirements criterion.
(4) Design features to be included are those features of the facility such as materials of construction and geometric arrangements, which if altered or modified, would have a significant effect on safety...
- The details located in TS 5.5.16 are not design features. They describe augmented inspection requirements.
- Therefore, this proposed TS change does not meet the design features criterion.
14 Technical Specification Criteria - Administrative Controls (5) Administrative controls are the provisions relating to organization and management, operating procedure, record keeping, review and audit, and reporting necessary to assure the operation of the facility in a safe manner.
- The details located in TS 5.5.16 are not administrative controls. The TS will remain in the Administrative Controls section of each plants TS, but the details will be relocated.
(6) Decommissioning applies only to nuclear power plants that have submitted decommissioning certifications (7) Initial notifications are made to the NRC Operations Center (8) Licensees must submit Licensee Event Reports in accordance with 10 CFR 50.73 when required.
- These criteria do not apply to the relocation of information from the TS to the UFSAR.
15 Technical Specification Criteria Conclusion
- The details contained in TS 5.5.16 do not satisfy the 10CFR50.36(c) categories and criteria for inclusion of information in TS. Thus, relocation of the detailed information from TS 5.5.16 to the UFSAR of each plant is appropriate.
Precedent
17 Precedent
- Surry Power Station license amendment request:
Proposed the relocation of two TSs containing augmented inspection requirements Added an augmented inspection program description to the Administrative Controls section
Provided a description of the program that did not include detailed information about how the program requirements were met.
- Letter from Virginia Electric and Power Company to NRC, Proposed License Amendment Request, Relocation of Augmented Inspection Requirements from TS 4.2 and TS 4.15 to Technical Requirements Manual, dated April 11, 2014 (ML14112A073)
- Letter from NRC to Virginia Electric Power Company, Surry Power Station Unit Nos 1 and 2, Issuance of Amendments Regarding Relocation of Augmented Inspection Requirements, dated April 28, 2015 (ML15099A679)
Schedule
19 Schedule
- Submit LAR - 1st Quarter 2022
- Request approval - 1 year from acceptance
Questions?