October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company
ML20279A520
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/07/2020
From: Alina Schiller
NRC/NRR/VPOB
To: Omar Lopez-Santiago
Office of Nuclear Reactor Regulation
Alina Schiller Ex 8777
References
Download: ML20279A520 (8)


Text

October 7, 2020 MEMORANDUM TO: Omar Lpez-Santiago, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: Alina Schiller, Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON OCTOBER 1, 2020 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on October 1, 2020. The purpose of the meeting was to discuss the following two topics regarding Vogtle Electric Generating Plant (VEGP),

Units 3 and 4: (1) motor-operated valve (MOV) loss of motive power testing and (2) Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Index No. 375 normal residual heat removal system (RNS) MOV testing.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML20274A101. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The documents referenced during the discussion can be found at ADAMS Accession Nos. given below:

O. Lpez-Santiago Summary of Meeting:

MOV Loss of Motive Power Testing SNC provided a presentation on a proposed change in testing for 10 ITAAC on MOV loss of motive power (ADAMS Accession No. ML20273A349). SNC presented a simplified schematic drawing for a typical MOV. SNC described the differences between the test methodology documented in the associated uncompleted ITAAC notification (UIN) and their new proposed MOV test verification. Instead of working the breakers to remove motive power, the installation setup work for each valve would demonstrate the ITAAC acceptance criteria are met. The MOV setup work order will provide the verification needed to demonstrate that the MOV open and close contactors correctly operate and, therefore, upon loss of power, the MOV will fail as-is.

NRC staff stated that SNC should include an explicit statement in the ITAAC closure notification and principle closure documents that SNC ran the test, removed motive power, and verified that the valve did not change position and, therefore, the ITAAC acceptance criteria were met. SNC agreed.

ITAAC Index No. 375 RNS MOV Testing SNC provided a presentation on ITAAC Index No. 375 RNS MOV testing (ADAMS Accession No. ML20273A236) and proceeded with presenting a simplified diagram of the RNS. SNC described the differences between the test methodology documented in the associated UIN and their new proposed test procedure.

SNC noted that the new testing procedure for ITAAC Index No. 375 would close all the valves shown in the diagram and trip the pumps at one time in a single test, instead of multiple tests as proposed in the UIN. NRC staff did not identify any concerns with this proposed change in methodology.

At the conclusion of the discussion for each topic, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public for topic 1. Regarding topic 2, Yan Peng asked about the difference between pump trip and pump coastdown, and NRC staff provided the definition of the pump trip and explained the coastdown phase would normally follow a pump trip condition.

Docket Nos.: 52-025 52-026

Enclosures:

As stated cc w/encls: See next page

ML20279A520 *via e-mail NRC-001 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/VPO NAME ASchiller* (c) RButler* CSantos* OLpez-Santiago*

DATE 10/6/20 10/06/20 10/6/20 10/7/20 OFFICE PM: NRR/VPO NAME ASchiller* (s)

DATE 10/7/20 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, October 1, 2020 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions and/or Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) closures for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, October 1, 2020 Teleconference 9:00 a.m. - 12:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Omar Lpez-Santiago Mike King Cayetano Santos Christopher Welch Jim Gaslevic NRR/VPO Garry Armstrong Billy Gleaves Alina Schiller Olivier Lareynie Tom Scarbrough NRR/DEX Michael Farnan Bradley Davis Region 2 Representing Industry Tom Petrak Chad Main Stephanie Agee Southern Nuclear Operating Company Mark Wilson Nick Kellenberger Adam Quarles Brian Schleger Westinghouse Electric Company Representing Public Yan Peng China Institute of Atomic Energy Note: All participated via teleconference.

Enclosure 2

Vogtle Mailing List (Revised 9/16/2020) cc:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 7825 River Road, BIN 63031 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael J. Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road Waynesboro, GA 30830 BIN 63031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Mailing List Email:

ppsena@southernco.com (Peter Paul Sena III) dlmckinn@southernco.com (D.L. McKinney mdmeier@southernco.com (Michael Meier) gchick@southernco.com (Glen Chick) ststimac@southernco.com (Stephen Stimac) patmarti@southernco.com (Patrick A. Martino) myox@southernco.com (Michael J. Yox) asparton@southernco.com (Anthony S. Parton) kroberts@southernco.com (Kelli A. Roberts) tgpetrak@southernco.com (Tom C. Petrak) ctdefnal@southernco.com (Chris T. Defnall) cemorrow@southernco.com (Calvin E. Morrow) x2rlbeil@southernco.com (Robert L. Beilke) sleighty@southernco.com (Steve Leighty) acchambe@southernco.com (Amy C. Chamberlain) jhaswell@southernco.com (Jeremiah C. Haswell) chandu.patel@nrc.gov (Chandu Patel) george.khouri@nrc.gov (George Khouri) nicholas.karlovich@nrc.gov (Nicholas D. Karlovich andrew.lerch@nrc.gov (Andrew Lerch) christopher.even@nrc.gov (Christopher Even) brian.kemker@nrc.gov (Brian J. Kemker) nicole.coovert@nrc.gov (Nicole C. Coovert) christopher.welch@nrc.gov (Christopher Welch) james.gaslevic@nrc.gov (James Gaslevic) victor.hall@nrc.gov (Victor Hall) garry.armstrong@nrc.gov (Garry Armstrong) michael.webb@nrc.gov (Michael Webb) thomas.fredette@nrc.gov (Thomas Fredette) steven.smith@nrc.gov (Steven Smith) cayetano.santos@nrc.gov (Cayetano Santos) marissa.bailey@nrc.gov (Marissa Bailey) steven.rose@nrc.gov (Steven Rose) bradley.davis@nrc.gov (Bradley Davis) jose.vasquez@nrc.gov (Jose Vasquez) jason.eargle@nrc.gov (Jason Eargle) kenya.carrington@nrc.gov (Kenya Carrington) michael.king2@nrc.gov (Michael King) evan.davidson@nrc.gov (Evan Davidson) theodore.fanelli@nrc.gov (Theodore Fanelli) bob.brinkman@opc.com (Robert B. Brinkman) eric.rasmussen@opc.com (Eric Rasmussen) jfuller@meagpower.org (J. E. Fuller) sjackson@meagpower.org (S.M. Jackson) tbundros@dutil.com (T. Bundros) orianil@westinghouse.com (Dr. L. Oriani)

Page 2 of 3

Vogtle Mailing List continued durhamdc@westinghouse.com (D. C. Durham) corletmm@westinghouse.com (M.M. Corletti) harperzs@westinghouse.com (Zach Harper) cowardjl@westinghouse.com (J. L. Coward) swkline@bechtel.com (S. W. Kline) lisa.matis@tetratech.com (Lisa Matis) bill.jacobs@gdassociates.com (Dr. Bill Jacobs) sroetger@psc.state.ga.us (S. Roetger) rtrokey@psc.state.ga.us (Robert L. Trokey) kevin.greene@troutmansanders.com (Kevin C. Greene) sblanton@balch.com (Stan Blanton) g2ndrmdc@southernco.com (SNC Document Control)

Page 3 of 3