Letter Sequence Meeting |
---|
|
|
MONTHYEARNL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement Project stage: Request ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers Project stage: Acceptance Review ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 Project stage: Meeting ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) Project stage: Other ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) Project stage: RAI ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle Project stage: Meeting ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) Project stage: Other ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption Project stage: Meeting 2024-01-12
[Table View] |
Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and VogtleML24156A177 |
Person / Time |
---|
Site: |
Hatch, Farley, Vogtle |
---|
Issue date: |
06/11/2024 |
---|
From: |
John Lamb Plant Licensing Branch II |
---|
To: |
|
---|
Lamb J |
References |
---|
EPID L-2023-LLE-0018, EPID L-2023-LLE-0021 |
Download: ML24156A177 (1) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24198A0772024-07-18018 July 2024 Summary of Observation Public Meeting Held with SNC Regarding Previous LAR to Revise TS 3.6.5 Completion Time Increase Using Risk-Informed Process for Evaluation to Increase for Farley Nuclear Plant, Units 1 and 2 ML24187A0012024-07-17017 July 2024 Summary of Observation Pre-Application Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Revise TS 3.3.8, Engineered Safety Feature Actuation System for Vogtle Electric ML24179A1592024-07-0202 July 2024 June 27, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24149A0742024-06-0101 June 2024 Summary of May 29, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Steam Generator Tube Inspection Report for Vogtle Electric Generating Plant, Unit 1 ML24138A0092024-05-17017 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50-348, and 50-364 -Meeting Number 20240474 ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML24108A0832024-04-19019 April 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24025A1372024-01-31031 January 2024 Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23313A0952023-11-16016 November 2023 Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML23275A0882023-10-12012 October 2023 Summary of Meeting with Southern Nuclear Operating Company ML23272A1822023-10-11011 October 2023 Summary of September 28, 2023, Observation Pre Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23230A0212023-08-30030 August 2023 LAR-22-002 Technical Specification 3.8.3 Summary of 08-17-23 Public Meeting ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company ML23146A1542023-06-0505 June 2023 Summary of May 25, 2023, Meeting with Southern Nuclear Operating Company ML23146A1672023-05-31031 May 2023 Public Meeting Summary2022 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50?348, and 50?364 Meeting Number 20230610 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23132A0412023-05-18018 May 2023 Summary of May 11, 2023, Meeting with Southern Nuclear Operating Company ML23121A1692023-05-12012 May 2023 Summary of Meeting with Southern Nuclear Operating Company Vogtle LAR-23-006 U/3&4 More Restrictive Action for TS 3.1.9 Cvs Isolation Valves ML23115A3282023-05-10010 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have a Pre-Submittal Discussion of Draft License Amendment Request (LAR) for Vogtle Electric Generating Plant (VEGP) Unit 3 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML23094A1092023-04-14014 April 2023 Summary of Conference Call Held with SNC, Regarding Regulatory Issue Summary 2000-11, Supplement 2, NRC Emergency Telecommunications System, for Joseph M. Farley Nuclear Plant, Units 1 and 2, and SNC Emergency Operations Facility ML23090A1422023-04-0303 April 2023 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 ML23055A0902023-03-14014 March 2023 February 16, 2023, Summary of Meeting with Southern Nuclear Operating Company ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23037A0032023-02-0606 February 2023 Summary of February 2, 2023, Public Meeting with Southern Nuclear Operating Company ML23012A0512023-01-17017 January 2023 January 11, 2023, Summary of Public Meeting with Southern Nuclear Operating Company (SNC) Regarding Vogtle Emergency Technical Specification Amendment ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company ML22336A0812022-12-0505 December 2022 Summary of December 1, 2022, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22335A4922022-12-0202 December 2022 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22319A0132022-11-30030 November 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on November 10, 2022 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22271A0182022-10-0404 October 2022 Summary of Public Meeting with SNC on Lessons Learned Final ML22257A2362022-09-19019 September 2022 Summary of September 13, 2022, Partially Open and Partially Closed Pre-Submittal Meeting Held with SNC, Regarding a Proposed OLM License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22243A0302022-09-0909 September 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on August 25, 2022 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear 2024-08-05
[Table view] |
Text
June 11, 2024
LICENSEE: Southern Nuclear Operating Company, Inc.
FACILITIES: Joseph M. Farley Nuclear Plant, Units 1 and 2 Edwin I. Hatch Nuclear Plant, Units 1 and 2 Vogtle Electric Generating Plant, Units 1 , 2, 3, and 4
SUBJECT:
SUMMARY
OF JUNE 6, 202 4, CLOSED MEETING HELD WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC., REGARDING THE PHYSICAL BARRIER EXEMPTIONS FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4 (EPID NO.
L-2023 -LLE-0018 AND L-2023- LLE-0021 )
On June 6, 2024 , a Closed meeting was held between the U.S. Nuclear R egulatory Commission (NRC) and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee).
The purpose of the meeting was to discuss security- related information regarding the physical barrier exemptions for Joseph M. Farley Nuclear Plant (Farley), Units 1 and 2, Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, and Vogtle Electric Generating Plant (Vogtle), Units 1, 2, 3, and 4.
A list of attendees is provided as an Enclosure.
On May 21, 2024 (Agencywide Documents and Access Management System (ADAMS)
Accession No. ML24142 A223), the meeting was noticed on the NRC public webpage.
By letter dated July 7, 2023, (ML23188A163) as supplemented by letters dated February 5, 12, and April 4, 2024, ( ML24036A292, ML24043A186, and ML24095A348), SNC submitted exemptions from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR),
Part 73, Section 73.2, Definitions for the Farley, Units 1 and 2, and Hatch, Units 1 and 2, and Vogtle, Units 1, 2, 3, and 4. The regulation at 10 CFR 73.2 requires, in part, that fences for a physical barrier be topped by three or more strands of barbed wire or similar material on brackets angled inward or outward between 30 and 45 degrees from the vertical.
The NRC staff opened the meeting with introductory remarks and a roll call of the attendees.
The NRC staff and SNC discussed security-related information and documented key points in a non- public conversation record (ML24157A030).
The meeting adjourned at 1 0:36 am Eastern Time (ET).
Please direct any inquiries to me at John.Lamb@nrc.gov or 301- 415-3100.
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-321, 50- 366, 50-348, 50- 364, 50-424, 50 -425, 52- 025, and 52-026
Enclosure:
List of Attendees
cc w/encls: Distribution via Listserv LIST OF ATTENDEES
JUNE 6, 2024 , CLOSED MEETING WITH SOUTHERN NUCLEAR COMPANY
REGARDING PHYSICAL BARRIER EXEMPTIONS
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2
VOGTLE ELECTRIC GENERATING PLANT, UNIT S 1, 2, 3, AND 4
ATTENDEE REPRESENTING John G. Lamb U.S. Nuclear Regulatory Commission (NRC)
Mike Markley NRC Lou Cubellis NRC Steven Sarver NRC Amanda Marshall NRC JP Parent NRC Zach Turner NRC Dawnmathews Kalathiveettil NRC
Ryan Henderson Southern Nuclear Operating Company (SNC)
Ryan Joyce SNC Guye Akins SNC Matt Grantham SNC Gerald Durham SNC Donald Enfinger SNC Mitchell Hillis SNC Cynthia Evans SNC Jeanne Johnston SNC Steve Shipman SNC Heath Williams SNC