Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
|
MONTHYEARND-21-0973, Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of Item 2.3.06.05a.i (Index Number 361)2021-10-29029 October 2021 Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of Item 2.3.06.05a.i (Index Number 361) Project stage: Request ML21305B6172021-11-0101 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number E.3.9.06.00.04 (Index No. 862) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21305A5112021-11-0101 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.06.05a.i (Index No. 361) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21342A2922021-11-0202 November 2021, 9 December 2021 Update to Targeted Inspections, Tests, Analyses, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 3 and 4 Project stage: Request ND-21-0982, ITAAC Closure Notification on Completion of Item 2.3.13.05.1 (Index Number 462)2021-11-0303 November 2021 ITAAC Closure Notification on Completion of Item 2.3.13.05.1 (Index Number 462) Project stage: Request ND-21-0992, ITAAC Closure Notification on Completion of Item 3.3.00.10.i (Index Number 815)2021-11-0404 November 2021 ITAAC Closure Notification on Completion of Item 3.3.00.10.i (Index Number 815) Project stage: Request ND-21-0377, ITAAC Closure Notification on Completion of ITAAC Item 2.2.01.11a.iii (Index Number 116)2021-11-0505 November 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.2.01.11a.iii (Index Number 116) Project stage: Request ML21309A0932021-11-0505 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.13.05.i (Index No. 462) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-20-0801, ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759)2021-11-0808 November 2021 ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759) Project stage: Request ND-21-0995, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2021-11-10010 November 2021 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) Project stage: Request ND-21-0167, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.10.ii (Index Number 816)2021-11-11011 November 2021 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.10.ii (Index Number 816) Project stage: Request ML21342A2052021-11-12012 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.10.i (Index No. 815) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0038, ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.d (Index Number 763)2021-11-12012 November 2021 ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.d (Index Number 763) Project stage: Request ML21319A3512021-11-15015 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.02a.i.d (Index No. 763) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21319A1622021-11-15015 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.01.11a.iii (Index No. 116) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21320A3372021-11-16016 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.01 (Index No. 759) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0713, ITAAC Closure Notification on Completion of ITAAC Item 2.7.04.03 (Index Number 716)2021-11-17017 November 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.7.04.03 (Index Number 716) Project stage: Request ML21322A3042021-11-18018 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.7.04.03 (Index No. 716) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-1010, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.09 (Index Number 670)2021-11-18018 November 2021 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.09 (Index Number 670) Project stage: Request ML21326A1182021-11-22022 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.10.ii (Index No. 816) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-1025, Unit 4 - ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.02.i (Index Number 565)2021-11-24024 November 2021 Unit 4 - ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.02.i (Index Number 565) Project stage: Request ML21334A4422021-11-30030 November 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.01.04 (Index No. 4) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0757, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2021-12-0202 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) Project stage: Request ML21343A1072021-12-0606 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.04.02a (Index No. 220) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0769, ITAAC Closure Notification on Completion of ITAAC 2.2.02.02a (Index Number 120)2021-12-0707 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.2.02.02a (Index Number 120) Project stage: Request ND-20-1378, ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.b (Index Number 761)2021-12-0808 December 2021 ITAAC Closure Notification on Completion of ITAAC 3.3.00.02a.i.b (Index Number 761) Project stage: Request ND-21-1036, ITAAC Closure Notification on Completion of ITAAC Item 2.2.03.12a.i (Index Number 214)2021-12-0909 December 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.2.03.12a.i (Index Number 214) Project stage: Request ND-21-1084, ITAAC Closure Notification on Completion of ITAAC 2.3.03.03c (Index Number 322)2021-12-0909 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.3.03.03c (Index Number 322) Project stage: Request ML21344A0972021-12-10010 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.03.03c (Index No. 322) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21348A7312021-12-14014 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number C.2.6.09.03a (Index No. 660) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-1030, ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.iv (Index Number 56)2021-12-15015 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.1.02.12a.iv (Index Number 56) Project stage: Request ND-21-0779, ITAAC Closure Notification on Completion of ITAAC 2.3.13.02 (Index Number 459)2021-12-15015 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.3.13.02 (Index Number 459) Project stage: Request ML21350A0422021-12-16016 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.02.02a (Index No. 120) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0993, ITAAC Closure Notification on Completion of ITAAC Item 2.1.02.15 (Index Number 67)2021-12-16016 December 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.1.02.15 (Index Number 67) Project stage: Request ND-21-1022, Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of ITAAC 2.3.02.05.1 (Index Number 291)2021-12-16016 December 2021 Vogtie Electric Generating Plant, Unit 3, ITAAC Closure Notification on Completion of ITAAC 2.3.02.05.1 (Index Number 291) Project stage: Request ND-21-0270, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05a (Index Number 644)2021-12-17017 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05a (Index Number 644) Project stage: Request ML21355A2862021-12-20020 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.02.05.i (Index No. 291) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21354A4172021-12-20020 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.13.02 (Index No. 459) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0956, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2021-12-21021 December 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) Project stage: Request ND-21-1095, Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.1 (Index Number 75)2021-12-21021 December 2021 Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.1 (Index Number 75) Project stage: Request ND-21-0802, ITAAC Closure Notification on Completion of ITAAC 2.2.01.02a (Index Number 91)2021-12-21021 December 2021 ITAAC Closure Notification on Completion of ITAAC 2.2.01.02a (Index Number 91) Project stage: Request ML21355A2882021-12-21021 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.02.12a.iv (Index No. 56) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21357A0042021-12-22022 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.3.00.02a.i.b (Index No. 761) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21357A0012021-12-22022 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.01.02a (Index No. 91) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21357A0022021-12-22022 December 2021 Uncompleted ITAAC Notification Checklist (UINC) 2.1.03.06.i for ITAAC (Index No. 75) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML21357A0272021-12-23023 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.6.09.05a (Index No. 644) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-21-0990, ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.04 (Index Number 572)2021-12-27027 December 2021 ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.04 (Index Number 572) Project stage: Request ML21364A0022021-12-29029 December 2021 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.5.05.04 (Index No. 572) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ML22005A0172022-01-0404 January 2022 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.07.i (Index No. 78) for Vogtle Unit 3 Combined License (VOG3) Project stage: Request ND-20-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2022-01-21021 January 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) Project stage: Request 2021-12-10
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24283A2022024-10-0909 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 16, 2024 - Proposed Vogtle 3 and 4 Flexibility Modes LAR ML24282A9822024-10-0808 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 Passive Residual Heat Removal Actuation Logic Changes License Amendment Request ML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23304A2682023-11-0707 November 2023 License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23293A0052023-10-20020 October 2023 Lessons Learned from the ITAAC Hearing Process for Vogtle 3 and 4 ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23072A1802023-03-13013 March 2023 2023 RIC Powerpoint Slide Presentation, Vogtle 3: Journey from Construction to Operations ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22335A5542022-12-0101 December 2022 Slides - SNC Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request - ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22126A0012022-05-0606 May 2022 SNC Slides - Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemptions ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22060A0062022-02-28028 February 2022 4Q 2021 Performance Summary U3 ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML22026A0582022-01-26026 January 2022 Dashboard Report 1-26-2022 ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21197A0032021-08-0606 August 2021 Slides - SNC Slides - Pre-Submittal Meeting on August 13, 2021 - Vogtle TS 3.3.1 and 3.3.2 LAR ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process 2024-06-06
[Table view] |
Text
Lead Test Assembly (LTA) License Amendment Request (LAR) Pre-Submittal Meeting Ryan Joyce - SNC May 11th, 2022
Introductions and Purpose
- Purpose of the Meeting Discuss the proposed Westinghouse lead test assemblies (LTAs) at Vogtle Unit 2 and receive NRC feedback prior to LAR submittal 2
Agenda
- Vogtle LTA Program Objective
- Proposed License Condition
- LTA Evaluation Method and Approach
- Source Term/Environmental Considerations
Vogtle LTA Program Objective
- Initial goals of program (within scope of proposed license amendment request (LAR)):
- Irradiate higher enriched fuel in a commercial reactor to generate data in support of future licensing applications
- Future goal of program (outside scope of proposed LAR):
- Support licensing applications for higher burnup fuels
- Four Westinghouse ATF LTAs with higher enrichment capable of higher burnup
- Four rods each with enrichment up to 6 w/o U-235
- AXIOM high performance fuel rod cladding
- ADOPT' doped fuel material for non-IFBA (Integral Fuel Burnable Absorbers) rods
- Standard (undoped) fuel material for IFBA rods
- Additional information to be provided during the closed session ADOPT, AXIOM, and EnCore are trademarks or registered trademarks of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited.
4
Key Analytical Impacts of the LTAs
- LTAs will lead the core during portions of steady-state operation and during some transient conditions
- Leading the core = highest linear heat generation rate
- LTAs will remain within core operating limits
- The analytical methods used to determine the core operating limits will be those previously reviewed and approved by the NRC (per TS 5.6.5)
- A separate LAR will be required to go above the licensed fuel rod burnup limit 5
LAR Outline Vogtle LAR Format
- Enclosure 1: Evaluation of the Proposed Change [Prop]
- Attachment 1: Proposed Facility Operating License Markups
- Enclosure 2: Evaluation of the Proposed Change [non-Prop]
Proposed License Condition D. The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part70. These include (a) an exemption from the requirements of 10 CFR 70.24 for two criticality monitors around the fuel storage area, and (b) an exemption from the requirements of Paragraph III.D.2(b )(ii) of Appendix J of 10 CFR 50, the testing of containment air locks at times when containment integrity is not required. The facility requires an exemption from the requirements of Paragraph III.D.2(b )(ii) of Appendix J of 10 CFR 50, the testing of containment air locks at times when containment integrity is not required. The special circumstances regarding exemption are identified in Section 6.2.6 of SSER 5.
An exemption was previously granted pursuant to 10 CFR 70.24. The exemption was granted with NRC materials license No. SNM-1967, issued August 21, 1986, and relieved GPC from the requirement of having a criticality alarm system. GPC and Southern Nuclear are hereby exempted from the criticality alarm system provision of 10 CFR 70.24 so far as this section applies to the storage of fuel assemblies held under this license.
8
Proposed License Condition (continued)
New License Condition (Appendix D):
Lead test assemblies (LTAs) 7ST1, 7ST2, 7ST3 and 7ST4 contain fuel rods that include advanced cladding features, and doped or standard fuel material. These LTAs are permitted to be placed in limiting core regions for up to two cycles of operation without completion of representative testing. Each of the four LTAs may contain up to four fuel rods with a maximum nominal U-235 enrichment of 6.0 weight percent; the maximum nominal U-235 enrichment of the remaining 260 fuel rods must be 5.0 weight percent. These LTAs are permitted to have unrestricted storage in the new fuel storage racks and restricted storage in the Unit 2 spent fuel pool (SFP). For the SFP storage requirements, these LTAs shall be treated with
[additional storage controls].
- Additional information to be provided during the closed session 9
Topics of Interest Overview of LTA Evaluation Method and Approach
- ATF materials modeled by making conservative adjustments to codes and methods where necessary
- Modeling consistent with descriptions in NRC-approved topical reports (where available) or based on the most recent level of characterization (from Westinghouse development or NRC interactions on ongoing topical report reviews) for materials not yet approved
- Conservative assumptions made for mechanical and thermal-hydraulic design
- Fuel Assembly Hydraulic and Mechanical testing during design development to confirm
- Thermal-Hydraulic departure from nucleate boiling (DNB) evaluation during reload design process to confirm LTAs are bounded by current Analysis of Record
- Some NRC-approved methods outside Vogtle current licensing basis used solely to assess performance of the LTAs
- PAD5 fuel performance models and design criteria
- Additional information to be provided during the closed session 11
Overview of LTA Evaluation Method and Approach (contd)
- Justification for current LOCA evaluation model (BASH) provided relative to the NRC restrictions on its use; assessments performed to show LTAs and co-resident fuel meet 50.46 acceptance criteria or more restrictive embrittlement criterion proposed for AXIOM cladding substrate
- Chromium coating added to the outer diameter of standard zirconium-alloy cladding
- No performance benefits credited for coated cladding
- The following will be demonstrated through confirmatory testing:
- No adverse mechanical design impacts
- No adverse impact on normal operating corrosion rates
- No adverse impact on design-basis accident criteria
- Additional information to be provided during the closed session 12
Exemption - 10 CFR 50.46 and 10 CFR 50 Appendix K
- A more restrictive embrittlement criterion will be used in conjunction with the 17%
maximum local oxidation criterion
- AXIOM cladding topical presents the data in support of this application
- Additional information to be provided during the closed session 13
Exemption - 10 CFR 50.68 - Criticality Analysis
- Licensing basis to change from 70.24 to 50.68
- Exemption is needed to 50.68(b)(7) to allow these LTAs to have greater than 5 weight percent U-235 rods
- Intent of rule (to preclude inadvertent criticality) being maintained
- Remaining 50.68(b) criticality requirements are unaffected and continue to be implemented
- Configuration controls applied (Traveller B)
- Additional information to be provided during the closed session 14
Assessment of Radiological Consequences
- Southern Nuclear is in the process of submitting a LAR to implement Alternate Source Term (AST) into the radiological consequences licensing basis
- Planned submittal date Summer 2022
- Impact of increased enrichment assessed as follows:
- Present comparisons of LTA versus AOR core nuclide inventories
- Comparisons show current AORs remain conservative
- Future Licensing Basis (AST)
- Comparison performed similar to the current licensing basis
- Demonstrates core inventories utilized for AST submittal are also conservative
- Note: AST not going to be discussed in LAR
- Environmental Considerations
- Plan to submit LAR under categorical exclusion clause
- Enriched LTAs have inconsequential impact on AOR 15
Impact on Probabilistic Risk Assessment (PRA), Severe Accidents (SAMG)
Timing
- Impact on decay heat (negligible)
- Impact on hottest core node temperature (negligible)
- Impact on Core Exit T/C Temperature (negligible)
Schedule Activity Schedule Second NRC Presubmittal Meeting May 11, 2022 Submittal of LTA LAR & Exemptions June 30, 2022 NRC Approval of LTA LAR & Exemption No later than July 15, 2023 Delivery of LTAs to Site No later than August 13, 2023 Startup Unit 2 Cycle 24 October 2023 Startup Unit 2 Cycle 25 Spring 2025 17
Questions/Discussion Full Proposed License Condition New License Condition (Appendix D):
Lead test assemblies (LTAs) 7ST1, 7ST2, 7ST3 and 7ST4 contain fuel rods that include advanced cladding features, and doped or standard fuel material. These LTAs are permitted to be placed in limiting core regions for up to two cycles of operation without completion of representative testing.
Each of the four LTAs may contain up to four fuel rods with a maximum nominal U-235 enrichment of 6.0 weight percent; the maximum nominal U-235 enrichment of the remaining 260 fuel rods must be 5.0 weight percent. These LTAs are permitted to have unrestricted storage in the new fuel storage racks and restricted storage in the Unit 2 spent fuel pool (SFP). For the SFP storage requirements, these LTAs shall be treated with the following storage controls:
- Prohibited from Unit 1 SFP
- Unrestricted storage allowed in the Unit 2 2-out-of-4 checkerboard storage configuration as shown in Figure 4.3.1-1
- Storage allowed in the Unit 2 3-out-of-4 checkerboard storage configuration as shown in Figure 4.3.1-1 when the LTAs reach 26500 MWd/MTU of burnup
- Storage allowed in the Unit 2 all-cell storage configuration (A assemblies as shown on Figures 4.3.1-3 and 4.3.1-5) when the LTAs reach 46000 MWd/MTU of burnup
- Storage in the peripheral cells of the 3x3 checkerboard storage configuration (L assemblies as shown on Figures 4.3.1-5 and 4.3.1-6) is prohibited
- Storage of fresh LTAs in the central cell of the 3x3 checkerboard storage configuration (high enrichment fuel assemblies as shown in Figure 4.3.1-2 and H assemblies as shown on Figures 4.3.1-5 and 4.3.1-6) is acceptable for LTAs with >60 IFBA rods per assembly 19