Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
CATEGORY j.
REGULATO INFORMATION DISTRIBUTION TEM <RIDS)
ACCESSION NBR 9703190187 DOC. DATE: 97/02/28 NOTARIZED: NO DOCKET 4 FACIL: 50-250 T ur k e!3 P o i n t P 1 t Unit an i 3 i F 1 o r i d a Power a n d L i g h t C 05000250 50~25 1 Turkey Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORRi J. E. Florida Power 5 Light Co.
HOVEYz R. J. Florida Power Kc Light Co.
RECIP. NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1997 %or Turkey Pointi Units 3 5 4. W/970311 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAUs R 1 INTERNAL: AEOD/SPD/RRAB 1 1 LE CENTER 0 NRR/DRPM/PECB 1 1 OC An"A RGN2 1 1 EXTERNAL: LITCO BRYCE. J H 1 1 NOAC NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
~ PP'L MAR 11 1997 L-97-062 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of .Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hove Vice Presi ent Turkey Point Plant JEK Attachments cc: L. A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9703l90187 970228 05000250 ADGCK 'DR R PDR an FPL Group company
I I V
L M
~f:'a
AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point I/3 DATE Mar 03, 1997 COMPLETED BY J. E. Knorr TELEPHONE I305) 246 - 6757 MONTH February, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/97 724 02/02/97 724 02/03/97 723 02/04/97 720 02/05/97 717 02/06/97 712 02/07/97 709 02/08/97 710 02/09/97 711 02/10/97 7'I 2 02/11/97 713 02/12/97 721 02/13/97 712 02/14/97 712 02/15/97 713 02/16/97 712 02/17/97 716 02/18/97 724 02/19/97 721 02/20/97 717 02/21/97 715 02/22/97 716 02/23/97 712 02/24/97 710 02/25/97 711 02/26/97 712 02/27/97 691 02/28/97 657
OPE NG DATA REPORT DOCKET NO 50 - 250 DATE 03/03/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: February, 1997
- 3. LICENSED THERMAL POWER (MWT): 2300
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 720
- 6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
- 7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 672.0 1416.0 212457.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1393.7 145622.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON. LINE 672.0 1386.4 143574.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1536751 3118149 300219352
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 500952 1019126 96476575
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 478689 972714 91364088
- 19. UNIT SERVICE FACTOR 100.0 97.9 67.6
- 20. UNIT AVAILABILITYFACTOR 100.0 97.9 67.6
- 21. CAPACITY FACTOR ( USING MDC NET ) 102.8 99.1 64.9
- 22. CAPACITY FACTOR ( USING DER NET ) 98.9 95.4 62.4
- 23. UNIT FORCED OUTAGE RATE 0.0 2.4 10.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
Refueling Outage Scheduled for March
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 250 UNIT NAME: Turkey Point 4 3 DATE: Mar 10, 1997 COMPLETED BY: J. E. Knorr REPORT MONTH FEBRUARY 1997 TELEPHONE: (305) 2466757 No. Date Duration Reason Method of Licensee System Component Cause and Corrective Type Action to (Hours) Shutting Event Code Code 2 Down Report If 4 Prevent Recurrence:
5 Reactor 00001038 02/27/97 S 0.0 N/A HH VALVEX Procedural response to feedwater heater bypass valve opening
- 1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREGZ161)
E - Operator Training JJcense Examination 5- Load Reduction 5.
F - Administraitive 9- Other (Explain) Exibit I - Same Source G - Operational Error (Explain)
H - Other (Explain)
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 operated at essentially 100% reactor power for the month of February. Power was reduced to 85% for a short period on February 27 to respond to a feedwater fluctuation. Late on February 28, the unit was reduced in power to approximately 60%
in anticipation of the beginning of a refueling outage.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 251 UNIT NAME: Turkey Point // 4 DATE: Mar 05, 1997 COMPLETED BY: J. E. Knorr REPORT MONTH FEBRUARY 1997 TELEPHONE: (305) 2466757 Method of Licensee Cause and Corrective Date Type Duration (Hours)
Reason Shutting Event 0'ystemCode Component Code Action to 2 Down Report Prevent Recurrence:
4 5 Reactor 00001034 , 02/02/97 S 0.0 NIA HB VALVEX Turbine Valve Test 00001035 02/03I97 2.4 NIA VALVEX Reduced power to repair turbine valve controls 00001036 02/04/97 S 0.0 N/A HF PIP EXX Water Box Cleaning 00001037 02/03/97 F 60 NIA EA INSTRU Synch Switch Repair
- 1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)
E - Operator Training .License Examination 5- Load Reduction F - Administraitive 9- Other (Explain) Exibit I - Same Source G - Operational Error (Explain)
H - Other (Explain)
AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point //4 DATE Mar 03, 1997 COMPLETED BY J. E. Knorr TELEPHONE {305) 246 - 6757 MONTH February, 1997 DAY AVERAGE DAILY POWER LEVEL
{MWe-Net) 02/01/97 726 02/02/97 726 02/03/97 164 02/04/97 458 02/05/97 718 02/06/97 716 02/07/97 713 02/08/97 714 02/09/97 714 02/10/97 715 02/11/97 722 02/12/97 727 02/13/97 722 02/14/97 715 02/15/97 714 02/16/97 715 02/17/97 720 02/18/97 725 02/19/97 722 02/20/97 719 02/21/97 719 02/22/97 718 02/23/97 714 02/24/97
'13 02/25/97 714 02/26/97 715 02/27/97 716 02/28/97 715
OPE NG DATA REPORT DOCKET NO 50 - 251 DATE 03/05/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246.6757 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: February, 1997
- 3. LICENSED THERMAL POWER (MWT): 2300
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 720
- 6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
- 7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693 B. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD - CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 672.0 1416.0 206189.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 141 6.0 141501.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE 663.6 1407.6 137205.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1485945 3194275 290734551
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 484900 1048155 93017056
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 462944 1001660 88104011
- 19. UNIT SERVICE FACTOR 98.8 99.4 66.5
- 20. UNIT AVAILABILITYFACTOR 98.8 99.4 66.8
- 21. CAPACITY FACTOR ( USING MDC NET ) 99.4 102.1 64.5
- 22. CAPACITY FACTOR ( USING DER NET ) 95.7 98.2 62.0
- 23. UNIT FORCED OUTAGE RATE 1.2 0.6 9.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.
UNIT:
DATE:
COMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 began the month of February operating at essentially 100% reactor power. On February 2, power was reduced to approximately 40% in anticipation of a turbine valve test. Part of the test was unsuccessful due to a servo malfunction and the decision was made to take the unit to Mode 2 on February 3. The unit was returned to the line later on February 3 reaching 100 0 power late on February 4. The unit operated at essentially 100% power for the remainder of the month.