ML17345A811

From kanterella
Revision as of 10:15, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1991 for Turkey Point Units 3 & 4.W/910412 Ltr
ML17345A811
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1991
From: Plunkett T, Tierney R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-113, NUDOCS 9104220277
Download: ML17345A811 (16)


Text

ACCELERATED DI UTION DEMONS TION SYSTEM U~,~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION TIERNEY,R.A.

Florida Power&Light, Co.PLUNKETT,T.F.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating epts for Mar 1991 for Turkey Point Units 3&./910412 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: AEOD/DOA 1@EjQ3LBQb EB10 G FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DS P/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:

4 PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14 D D P.O.Box 029100, Miami, FI33102-9100 APR 1.21991 L-91-113 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, gp-P/u~ve>h T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR.ADOCK 05000250 R'"'-'DR an FPL Group company I t~I')Qi f--4 g>>a\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke Point 3 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER (MWe-Net)LEVEL 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/9 1 03/0 6/9 1 03/07/91 03/08/91 03/09/91 03/10/91 03/11/9 1 03/12/91 03/13/9 1 03/14/91 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/91 03/20/91 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/26/91 03/27/91 03/28/91 03/29/91 03/3 0/9 1 03/31/91 0 0 0 0 0 0 0 0 0 0 0 0 0 0'0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OPERATING STATUS OPERATING DATA REPORT DOCKET HO 50-250 DATE 4/18/91 COMPLETED'BY R.Ai TIERNEY TELEPHONE 385/246/6970 li UNIT HA)IEI TURKEY POINT UNIT 3 2i REPORTING PERIODS HARCH 1991 3i LICENSED THERHAL POHER (lQT)1 2280 4 HANEPLATE RAlIHG (GROSS SK)l 760 5, DESIGN ELECTRIGtL RATlHG (NET SK)l 693 bi HAXI)m)I DEPENDABLE CAPACITY (GROSS SK)I 699 7i HAXIHUH DEPENDABLE CAPACITY (HH lNE)l 666 Bo IF CHANGES OCCUR IH CAPACITY RATINGS (ITEHS NJHBER 3 THROUGH 7)SINCE LAST REPORT)GIVE REASONSI'9.PONER LEVEL TO WHICH RESTRICTED'F AHY (HET H)IE)10i REASONS FOR RESTRICTIONSt IF ANY)HOHTHLY-YTD-Cm(ULATIVE iii HOURS IH REPORT PERIOD)12i HUINER OF HOURS REACTOR WAS CRITICAL 13<REACTOR RESERVE SHUTINNH HOURS 14<HOURS GENERATOR OH-LINE 15'NIT RESERVE SHUTDOHH HOURS ibo GROSS THEINAL EHERGY GENERATED (SN)17<GROSS ELECTRICAL ENERGY GENERATED (NH)18(HET ELECTRICAL ENERGY GENERATED (M)19'NIT SERVICE-FACTOR 20e UNIT AVAILABILITY FACTOR 2li CAPACITY FACTOR (USING HDC HET)22'APACITY FACTOR (USING DER HET)23'NIT FORCED OUTAGE RATE 24>SHUTDO!5S SCHEDULED OVER NEXT 6 HONTHS t 744 Go0 e,e Go0 GiG 0 0-566 Gi0 Gi0 GiG Go0 0,0 2160 Go0 0.0 Go0 0.0 0 0-3825 Gi0 Ge0 Gi0 Go0 0.0 160593ib 104473>2 844i4 103055i7 121.8 214231642 68615991 64874693 64i2 64>2 bli8 58e3 12>5 25 IF SHUT DOmI AT EHD OF REPORT PERIOOt ESTIHATED DATE OF STARTUPl ie/03/91

~.

UNlT SHUTDOWNS AND POWER REDUCTlQNS REPORT MONTH March 1991 DOCKET NO.50-250 Turkey Point k'3 DATE April 11, 1991.COMPLETED BY R.A.Tierney-970 Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause 4 Corrective Actionto PreventRecurrence 22 901212 S 744 H/A EE Engine Unit 3 was shutdown for a scheduled Upgrades Outage.F Forced S Scheduled 2 Reason A-Equipment FaHure(Explain)

B-Maintenance or Test C-Refueling D-Reguhtory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error (Exphin)H-Other(Exphin)

Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Exphin)Exhibit G-instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)

Re (NUREG4161)

Exhibit 1-Same Source

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO'50-250 UNIT Turke Point 3 DATE'ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 REPORT MONTH March 1991 Unit.3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER (MWe-Net)LEVEL 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/91 03/06/91 03/07/91 03/08/91 03/09/91 03/10/9 1 03/11/9 1 03/12/9 1'3/13/9 1 03/14/9 1 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/9 1 03/2 0/9 1 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/2 6/9 1 03/27/91 03/28/91 03/29/91 03/30/91 03/31/91 OPERATING STATUS OPERATING DATA REPORT DOCKET HO 59-251 DATE 4/10/91 COMPLETED BY R>>A>>TIERNEY TELEPHONE 395/246/6970 1 UNIT HAMEl TURKEY POINT UNIT 4 2>>REPORTIHG PERIODS MARCH 1991 3.LICENSED THERMAL PmKR (NIT)f 2290 4>>INIEPLATE RATING (GROSS MHE)t 760 5>>DESIGH ELECTRICAL RATING (HET NK)t 693 6>>MAXINN DEPENDABLE CAPACITY (GROSS ISE)t 699 7>>MAXIMUM DEPEHDABLE CAPACITY (NET SK)>>666 8>>IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS HSIBER 3 THROUGH 7)SIHCE LAST REPORTS GIVE REASONSt 9>>POHER LEVEL TO HHICH RESTRICTEDt IF NY (NET ISK).10>>REASONS FOR RESTRKTIOHSt IF ANY'i>>HOURS IH REPORT PERIOD>>12>>NUMBER OF HOURS REACTOR HAS CRITICAL 13>>REACTOR RESERVE SHUTDOMH HOURS14>>HOURS GENERATOR OH-LINE 15>>UHIT RESERVE SHUTDINH HOURS 16>>GROSS THERMA!EHERGY GENERATED (NN)17>>GROSS ELECTRICAL ENERGY GEHERATED (MMH)18>>HET ELECTRICAL ENERGY GENERATED (MtIH)19>>UNIT SERVICE FACTOR 20>>UNIT AVAILABILITY FACTOR 21>>CAPACITY FACTOR (USING MDC HET)22>>CAPACITY FACTOR (USING DER NET)23>>INIT FORCED OUTAGE RATE 24>>SHUTINNHS'SCHEDULED OVER NEXT 6 MONTHS>>744 0>>8 0>>0 0.0 0.0 0 0<89 0>>8 0.0 0>>0 0.0 0>>0 2160 e,e 0,0 0.0 0>>0 0 0-2687 0.0 e,e 0>>0 0,0 0.0 154325>>0 101186>>4 166>>6 97567>>i 32>>l 205630060 65612889 62050941 63>>2 63>>2 61.5 58>>0 11>>9 25>>IF SHUT INNH AT EIS OF REPORT PERIODr ESTIMATED'ATE OF STARTUP>>li/94/91

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME DATE-5 Turkey Point¹4 Apri1 11, 1991 REPORT MONTH March, 1991 COMPLETED BY R.A.Tierney TELEPHONE Date Type Duration (Hours)Reasons Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Co'des Cause 8 Corrective Actionto Prevent Recurrence 901124 , S 744 C/H N/A RC/EE FUELXX ENGINE Unit 4 shutdown for a scheduled Upgrades and Refue1ing 0utage.F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-OperationaIError (Explain)H-Other(ExpiaIn)

Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5.-Load Reduction 9-Other (Exphin)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report (LER)File (NUREG4161)

Exhibit1-Same Source

'

SUMMARY

OF OPERATING EXPERIENCE DOCKET, NO~50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 ,REPORT MONTH March 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 26, 1990.

0 ,~'