ML072350015

From kanterella
Revision as of 20:22, 22 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
09/07/2007 Notice of Meeting with Progress Energy Florida to Discuss the Status of the Power Uprates at Crystal River, Unit 3
ML072350015
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/23/2007
From: Bailey S N
NRC/NRR/ADRO/DORL/LPLII-2
To: Boyce T H
NRC/NRR/ADRO/DORL/LPLII-2
Bailey S N
References
Download: ML072350015 (5)


Text

August 23, 2007MEMORANDUM TO: Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor LicensingFROM: Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2BMoroney for /RA/ Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH PROGRESS ENERGY FLORIDA DATE & TIME: Friday, September 7, 2007 9:00 a.m. to 12:00 p.m.LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-4 B6 Rockville, MarylandPURPOSE: To discuss the status of the power uprates at Crystal River Unit 3.

CATEGORY 1:* This is a Category 1 Meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned. PARTICIPANTS:Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). NRCLICENSEE T. McGintyD. Roderick T. BoyceD. Varner S. BaileyT. Williams et al.K. WilsonP. Infanger P. RoseDocket No. 50-302

Enclosure:

Agenda cc w/encl: See next page CONTACTS: Stewart Bailey, NRRM. Vaaler, NRR 301-415-1321301-415-3178 snb@nrc.govmgv@nrc.gov* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002 AGENDA FOR THE SEPTEMBER 7, 2007, PUBLIC MEETINGBETWEEN THE NRC AND PROGRESS ENERGY FLORIDAREGARDING THE STATUS OF POWER UPRATES ATCRYSTAL RIVER UNIT 3AGENDA:I.Margin Uncertainty Recapture A.License Amendment Request1.Submittals 2.Requests for Additional Informationa.)Response Summary b.)Feedback3.Technical Specification Changesa.)Rated Thermal Power Definition b.)Treatment of leading-edge flow meeter (LEFM) and InputUnavailabilityc.)Current ProposalB.Status of Engineering/Installation Activities1.Configuration Change (LEFM and Flow Straighteners) 2.Completed Engineering Change Packages 3.Preinstallation Testing Progress 4.Installation Status 5.ScheduleII.Extended Power UprateA.Major Task Status1.NSSSa.)License Amendment Request b.)Safety and Transient Analysis c.)Fuels2.Focus Areasa.)Rapid Cooldown b.)Core Flood Line Break c.)Mass and Energy Input Validation d.)Confirmation of Boron Precipitation Mitigation e.)Ultimate Heat Sink Systems3.Turbine Generator 4.Balance of Plant 5.ScheduleEnclosure

ML072350015OFFICELPLII-2/PMLPLII-2/LALPLII-2/BCNAMEBMonroney for SBailey BClaytonBMoroney for TBoyce DATE 08 / 23 /07 08 / 23 /0708 / 23 /07

SUBJECT:

FORTHCOMING MEETING ON APRIL 27, 2007, WITH PROGRESS ENERGYFLORIDADate: August 23, 2007DISTRIBUTION

RidsNrrDorlLpl2-2RidsOgcMailCenterRidsRgn2MailCenter RidsOpaMailCenterRidsAcrsAcnwMailCenterRidsNrrAdro RidsNrrLABClaytonRidsNrrPMSBailey RidsNrrDorl PUBLICLPL2-2 R/FT. Liu, NRR K. Clark, RIIS. Campbell, EDOReceptionist (OWFN & TWFN)

PMNS Florida Power CorporationCrystal River Nuclear Plant, Unit 3 cc:Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042Mr. Michael J. AnnaconePlant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. Jim MallayFramatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209Mr. William A. Passetti, ChiefDepartment of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney GeneralDepartment of Legal Affairs The Capitol Tallahassee, Florida 32304Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Stephen J. Cahill (Acting)Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. Jon A. FrankeDirector Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Senior Resident InspectorCrystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428Ms. Phyllis DixonManager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708David T. ConleyAssociate General Counsel II - Legal Dept.

Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551Mr. Daniel L. RoderickVice President, Nuclear Projects & ConstructionCrystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. David VarnerManager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing

& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708