ML071010541

From kanterella
Jump to navigation Jump to search
Crystal River Unit 3, Meeting Notice Regarding Power Uprates, Steam Generator Replacement, and Installation of an Independent Spent Fuel Storage Facility
ML071010541
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 04/12/2007
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLII-2
To: Boyce T
NRC/NRR/ADRO/DORL/LPLII-2
Bailey S , NRR/ADRO/DORL, 415-1321
References
Download: ML071010541 (5)


Text

April 12, 2007 MEMORANDUM TO: Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing /RA/

FROM: Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH PROGRESS ENERGY FLORIDA DATE & TIME: Friday, April 27, 2007 9:00 a.m. to 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-9 A1 Rockville, Maryland PURPOSE: To discuss the licensees plans for power uprates and their integration with license renewal, steam generator replacement, and installation of an independent spent fuel storage facility at Crystal River Unit 3.

CATEGORY 1:* This is a Category 1 Meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC LICENSEE T. McGinty D. Young T. Boyce T. Williams S. Bailey K. Wilson et al. P. Infanger et al.

Docket No. 50-302

Enclosure:

Agenda cc w/encl: See next page CONTACTS: Stewart Bailey, NRR L. Regner, NRR 301-415-1321 301-415-1906 snb@nrc.gov lmr2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002

AGENDA FOR THE APRIL 27, 2007, PUBLIC MEETING BETWEEN THE NRC AND PROGRESS ENERGY FLORIDA REGARDING FUTURE CHANGES AT CRYSTAL RIVER UNIT 3 AGENDA:

Crystal River Unit 3 Power Uprate Project I. Three Phase Implementation A. Measurement Uncertainty Recapture (MUR) - December 2007 B. Secondary Side Efficiency - Fall 2009 C. Extended Power Uprate - Fall 2011 II. Integration A. Between three phases of power uprate B. Between other projects

1. License renewal - Fall 2008
2. Steam generator replacement - Fall 2009
3. Independent Spent Fuel Storage Installation - 2012 III. MUR A. Submittal April 2007 per RIS 2002-03 B. Caldon Leading Edge Flowmeter C. Other analysis and hardware changes D. Request approval by restart from refueling outage (scheduled for December 7, 2007)

Enclosure

ML071010541 OFFICE LPLII-2/PM LPLII-2/LA LPLII-2/BC NAME SBailey BClayton TBoyce DATE 04/12/04 04/11/07 04/11/07

SUBJECT:

FORTHCOMING MEETING ON APRIL 27, 2007, WITH PROGRESS ENERGY FLORIDA Date: April 12, 2007 DISTRIBUTION:

RidsNrrDorlLpl2-2 RidsOgcMailCenter RidsRgn2MailCenter RidsOpaMailCenter RidsAcrsAcnwMailCenter RidsNrrAdro RidsNrrLABClayton RidsNrrPMSBailey RidsNrrDorl PUBLIC LPL2-2 R/F T. Liu, NRRi K. Clark, RII S. Campbell, EDO Receptionist (OWFN & TWFN)

PMNS M. Ernstes, RII

Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:

Mr. R. Alexander Glenn Chairman Associate General Counsel (MAC-BT15A) Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue St. Petersburg, Florida 33733-4042 Inverness, Florida 34450-4245 Mr. Jon A. Franke Mr. Michael J. Annacone Plant General Manager Engineering Manager Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Jim Mallay Mr. Daniel L. Roderick Framatome ANP Director Site Operations 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)

Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Senior Resident Inspector Bureau of Radiation Control Crystal River Unit 3 2020 Capital Circle, SE, Bin #C21 U.S. Nuclear Regulatory Commission Tallahassee, Florida 32399-1741 6745 N. Tallahassee Road Crystal River, Florida 34428 Attorney General Department of Legal Affairs Mr. Terry D. Hobbs The Capitol Manager, Nuclear Assessment Tallahassee, Florida 32304 Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Mr. Craig Fugate, Director Crystal River, Florida 34428-6708 Division of Emergency Preparedness Department of Community Affairs David T. Conley 2740 Centerview Drive Associate General Counsel II - Legal Dept.

Tallahassee, Florida 32399-2100 Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551