Notice of Meeting with Progress Energy - Florida Power Corporation Re Announcement - Public Meeting Regulatory Conference - Crystal River Nuclear Plant
ML051880185
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/06/2005
From: Payne D
NRC/RGN-II/DRS/EB
To: Young D
Florida Power Corp
References
IR-05-007
Download: ML051880185 (5)


Text

July 6, 2005 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING REGULATORY CONFERENCE - CRYSTAL RIVER NUCLEAR PLANT, DOCKET NO: 50-302

Dear Mr. Young:

This letter confirms the conversation between Mr. Dennis Herrin of your staff and Mr. Son Ninh of the NRC Region II staff on July 6, 2005, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for July 22, 2005, at 10:00 a.m.

(EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the inspection finding documented in Inspection Report No. 05000302/2005007. This finding involved unprotected post-fire safe shutdown cables and a related non-feasible local manual operator action, and was preliminarily characterized as a greater than very low safety significance (GREEN) finding.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4669.

Sincerely,

/RA/

D. Charles Payne, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72

Enclosure:

As stated cc w/encl - See page 2

FPC 2 cc: Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution (cc w/encl contd - See page 3)

OFFICE RII:DRP RII:DRP SIGNATURE /RA/ /RA/

NAME NINH MUNDAY DATE 7/ 06 /2005 7/06 /2005 E-MAIL COPY? NO NO YES NO YES NO YES NO YES NO YES NO

SUBJECT:

PUBLIC MEETING WITH PROGRESS ENERGY - FLORIDA POWER CORPORATION FACILITY: Crystal River Nuclear Plant DOCKET: 50-302 DATE & TIME: July 22, 2005 10:00 a.m. to Noon LOCATION: Region II Office, Room 24T20 61 Forsyth Street, Atlanta, GA 30303 PURPOSE: The purpose of the Regulatory Conference is to discuss the risk significance of the inspection finding documented in Inspection Report No. 05000302/2005007. This finding involved unprotected post-fire safe shutdown cables and a related non-feasible local manual operator action, and was preliminarily characterized as a greater than very low safety significance (GREEN) finding. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding visitors and security.

CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC OFFICE(S)

PARTICIPATING: NRR, OE, and Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list)

W. Travers, Regional Administrator, Region II (RII)

V. McCree, Director, Division of Reactor Safety (DRS)

C. Casto, Director, Division of Reactor Projects (DRP)

J. Munday, Chief, Reactor Projects Branch 3, DRP, RII C. Payne, Chief, Engineering Branch 2, DRS, RII C. Evans, Regional Counsel/Enforcement Officer, Enforcement and Investigations Coordination Staff (EICS),

LICENSEE (partial list)

D. Young, Vice President, Crystal River S. Powell, Licensing Manager, Crystal River Enclosure

2 MEETING CONTACT: Charles Payne, NRC, RII (404)562-4669 DCP@nrc.gov AUDIO TELE-CONFERENCE: Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact Mr. Charles Payne at 404-562-4669 by July 20, 2005, indicating your intent to and to obtain teleconferencing information.