MONTHYEARML1007503992009-10-13013 October 2009 Email from C. Morrison to L. Reyes, Et Al, Subj: Special Inspection Charter to Evaluate CR Containment Bldg ML1007503972009-10-13013 October 2009 Email from M. Franke to M. Sykes, Subj: FW: Crystal River SI Charter ML1007503952009-10-13013 October 2009 Email from C. Fletcher to M. Sykes, Subj: Crystal River SI Charter 2009-10-13
[Table view] Category:E-Mail
MONTHYEARML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03
[Table view] Category:Memoranda
MONTHYEARML22333B0922022-12-21021 December 2022 FY22 Nmss/Duwp Operating Experience Report ML21060B0202021-03-31031 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Crystal River ISFSI ML21060B0212021-03-31031 March 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Crystal River ISFSI ML19323F8262019-11-20020 November 2019 NEIMA Meeting Summary ML19183A4332019-07-0909 July 2019 Memo to Frederick Miller, Chief (Acting), Financial Projects Branch, Request for Technical Assistance on a License Transfer Application and Associated Conforming Administrative License Amendment for Crystal River Unit 3 Nuclear Generating P ML18037A5242018-02-0606 February 2018 CR_3 ISFSI PSP Rev 1 Notice of Safeguards Memo ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17143A0182017-05-28028 May 2017 Staff Review of Crystal River, Unit 3, Physical Security Plan Rev. 3 (Sles NS114954) for Verification of ASM Incorporation (EA-16-005) ML16356A2182017-01-0909 January 2017 Memo to Beardsley - Work Request for Crystal River Amendment to Remove the Existing Cyber Security License Condition from the Facility Operating License ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML16224A7822016-08-16016 August 2016 Memo to Anderson, Request for Technical Assistance on License Amendment Request to Approve the Crystal River Unit 3 ISFSI Only Physical Security Plan ML16201A1352016-08-12012 August 2016 Safety Evaluation Input for Independent Spent Fuel Storage Installation Only Emergency Plan ML16173A0652016-06-23023 June 2016 Work Request to NSIR, Crystal River ISFSI Only Security Plan ML16161A5572016-06-16016 June 2016 Memo to Anderson, Work Request for Crystal River ISFSI Only Emergency Plan ML16160A2782016-06-16016 June 2016 Request for Publication in Biweekly Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (Contro ML16111B2622016-04-25025 April 2016 Memo from B. Watson (NRC) to J. Andersen (NRC) Re: Request for Assistance for Crystal River Revision to the Security Plan Implementation Schedule Milestone 8 ML15258A4812015-09-16016 September 2015 Request for Technical Assistance on License Amendment Request for Proposed Revision to the Crystal River Unit 3 Permanently Defueled Emergency Plan (TAC No. L53072) ML13225A1992013-08-13013 August 2013 Correction - 08/29/13 Notice of Forthcoming Meeting with Duke Energy Florida: Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13099A3012013-04-0909 April 2013 Termination of Resident Inspection Staffing for Crystal River Nuclear Plant Following Certification of Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel ML13016A1152013-01-16016 January 2013 NRC Oversight of Crystal River, Unit 3, During Extended Shutdown ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12285A3122012-10-15015 October 2012 11/1/12 Forthcoming Meeting Via Conference Call with Duke Energy, Inc. Representing Florida Power Corporate Concerning Generic Letter 2004-02 and Draft Proposed Strainer Fiber Bypass Test Plan for Crystal River ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12270A1482012-09-24024 September 2012 Memo Request for Temporary Exception to the Resident Inspector Staffing Policy for Crystal River Nuclear Plant ML11286A1592011-10-13013 October 2011 Memo: NRC Oversight of Crystal River Unit 3 During Extended Shutdown ML1125905462011-09-16016 September 2011 Inspection Plan Memo to Fred Brown During Extended Shutdown ML11187A1902011-07-18018 July 2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Crystal River 3 Nuclear Generating Plant License Renewal Application ML11153A1652011-06-0909 June 2011 06/28/11 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Crystal River Unit 3 Nuclear Generating Plant ML1107405412011-03-31031 March 2011 4/21/11 Notice of Forthcoming Meeting with Progress Energy, Crystal River, Unit 3, to Discuss Licensee'S Overall Plans Associated with an EPU Application ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1104200212011-03-21021 March 2011 Summary of Telephone Conference Call Held on 11/22/10, Between the USNRC and FPC, Concerning Draft Request for Additional Information Related to the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ML1034706512010-12-15015 December 2010 Federal Register Notice Regarding the ACRS Subcommittee Meeting on Plant License Renewal (Crystal River), January 12, 2011 ML1027404282010-10-0101 October 2010 Notice of Forthcoming Meeting with Florida Power Corporation (Progress Energy) to Discuss the Crystal River Proposed License Amendment Request to Support Implementation of the Independent Spent Fuel Storage Facility (ISFSI) Project ML1022302872010-08-18018 August 2010 Memo Approval of Reactor Oversight Program Reduced Sample Size for Crystal River Unit 3 in Calender Year 2010 ML1021703312010-08-0505 August 2010 Memo - Completion of ROP Baseline Inspections for Extended Shutdown of Crystal River in Calendar Yr. 2010 ML1016601412010-06-17017 June 2010 Notice of Forthcoming Meeting with Progress Energy to Discuss Licensee'S Plans for Repairing the Containment at Crystal River, Unit 3 ML1000900502010-03-0101 March 2010 Summary of Telephone Conference Call Held on November 11, 2009, Between the U.S. NRC and Florida Power Corporation, Concerning a Draft RAI and the Applicant'S Response to a RAI Pertaining to the Crystal River Unit 3 Nuclear Generating Plant ML1003200362010-02-19019 February 2010 Summary of Telephone Conference Call Held on December 23, 2009, Between the U.S. NRC and Florida Power Corporation, Concerning Applicant'S Response to a RAI Pertaining to the Crystal River Unit 3 Nuclear Generating Plant License Renewal.. ML1001415932010-02-16016 February 2010 Summary of Tele Conference Call Held on 12/1/09, Btw the USNRC and Florida Power Corp, Concerning Licensee Response to a RAI Pertaining to the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ML1000703172010-02-0202 February 2010 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Florida Power Corporation, Concerning the Applicant'S Response to a Request for Additional Information Pertaining to the Crystal River, Unit 3 ML0934513952010-01-0404 January 2010 Summary of Telephone Conference Call on 10/29/09, Between the USNRC and Florida Power Corporation, Concerning Licensee Response to a Request for Information Related to the Crystal River Unit 3 Nuclear Generating Plant License Renewal Applic ML1007503972009-10-13013 October 2009 Email from M. Franke to M. Sykes, Subj: FW: Crystal River SI Charter ML0928608132009-10-13013 October 2009 Special Inspection Charter to Evaluate Crystal River Containment Building ML1007503992009-10-13013 October 2009 Email from C. Morrison to L. Reyes, Et Al, Subj: Special Inspection Charter to Evaluate CR Containment Bldg ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0807102572008-03-11011 March 2008 Request for Additional Information - Weld Overlay of the Decay Heat Drop Line Relief Request #08-001-RR, Revision 0 ML0733711662007-12-0303 December 2007 Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805 ML0723500152007-08-23023 August 2007 Notice of Meeting with Progress Energy Florida to Discuss the Status of the Power Uprates at Crystal River, Unit 3 ML0707500422007-03-16016 March 2007 03/23/07 Meeting Cancellation - Crystal River Unit 3, Meeting with Progress Energy Florida Notice Plans for Power Uprate, License Renewal, Steam Generator Replacement, and Installation of an Independent Spent Fuel Storage Facility ML0627700652006-10-0505 October 2006 Forthcoming Meeting with Florida Power Corporation (Progress Energy) to Discuss Pre-Application Review of Missile Shield Amendment for Crystal River Unit 3 2022-12-21
[Table view] |
Text
Sykes, Marvin From: Morrison, Catherine Sent: Tuesday, October 13, 2009 4:12 PM To: Reyes, Luis; Franke, Mark; Borchardt, Bill; Mallett, Bruce; McCree, Victor; Munday, Joel; Sykes, Marvin; Wert, Leonard; Boyce, Tom (NRR); Saba, Farideh; Kennedy, Kriss; Christensen, Harold; Ninh, Son; Fletcher, Cecil; Khanna, Meena; Trocine, Leigh; Diaz-Toro, Diana; Orders, William; Lake, Louis
Subject:
Special Inspection Charter to Evaluate Crystal River Containment Building Attachments: Crystal River SI Charter.pdf Please find the above referenced charter attached.
ML092860813 U.S. Nuclear Regulatory Commission Division of Reactor Projects 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 404-562-4559 404-562-4514 (fax)
CatherineMorrison Secretary, Branches 3, 4 & 7 Catitherine.Morrison@NRC. qov 1
UNITED. STATES NUCLEAR REGULATORY COMMISSION REGION 11 SAM NUNN ATLANTA FEDERALCENTER 9 0 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 October 13, 2009 MEMORANDUM TO: Louis F. Lake, Team Leader Special Inspection FROM: Luis A. Reyes IRA!
Regional Administrator
SUBJECT:
SPECIAL INSPECTION CHARTER TO EVALUATE CRYSTAL RIVER CONTAINMENT BUILDING You have been selected to lead a Special Inspection to assess the circumstances associated with a delamination discovered in the concrete of the containment building at Crystal River Unit
- 3. Your onsite inspection should begin on October 13, 2009. Robert Carrion, Senior Reactor Inspector, George Thomas of NRR, Anthony Masters, Senior Construction Inspector, and an independent Structural Engineering Contractor (TBD) will assist you in this inspection.
A. Basis Recently, the plant was shut down for a planned refueling outage as well as to replace the steam generators inside containment. In order to move the steam generators into containment, workers began removing concrete to create the necessary opening.
During that work, a small gap was found while making approximately a 25 foot x 25 foot concrete cut (liner is still intact). The gap is about one half inch wide and 10 inches inward from the outside edge of the concrete and located just at the layer of horizontal tendons. The Crystal River containment is about 42 inches thick, contains both horizontal and vertical tensioned steel tendons, and is lined with steel plate.
The licensee is evaluating the extent of the condition. The discovery of this gap.in the concrete does not represent an immediate safety concern because the plant is shut down.
In accordance with Management Directive 8.3, "NRC Incident Investigation Program,"
deterministic and conditional risk criteria were used to evaluate the level of NRC response for this event.
Based on the deterministic criteria that this issue involved possible adverse generic implications, the event was evaluated for risk in accordance with Management Directive 8.3. Due to lack of information on the structural integrity of the concrete containment and how it would interact with the free-standing steel liner during a seismic event in its current condition, a risk analysis was not able to b&. performed at this time. However, if CONTACT: Mark Franke, RII/DRS 404-562-6349
L. Lake 2 the concrete containment reacted adversely with the free-standing steel liner during a seismic event, LERF would be adversely affected and a Special Inspection would be warranted. Therefore, Region II has determined that the appropriate level of NRC response is to conduct a Special Inspection.
B. Scope The inspection is expected to perform data gathering and fact-finding in order to address the following:
- 1. Develop a complete description of the problems and circumstances surrounding the gap in the containment building.
- 2. Verify that the licensee has appropriately evaluated Operability and Reportability.
- 3. Review structural integrity testing data of the containment.
- 4. Assess the adequacy of the licensee's maintenance and inspection programs related to this event.
- 5. Assess the licensee's activities related to the problem investigation (e.g., root cause analysis, extent of condition, etc).
- 6. Assess the licensee's corrective actionf"fix"'in addressing the containment delamination issue.
- 7. Collect data necessary to develop and assess the safety significance of any findings in accordance with IMC 0609, "Significance Determination Process."
- 8. Determine potential generic issues or any design and construction inadequacies and make recommendations for appropriatefollow-up actions (e.g., Information Notices, Generic Letters, and Bulletins).
C. Guidance Inspection Procedure 93812, "Special Inspection," provides additional guidance to be used during the conduct of the Special Inspection. Your duties will be as described in Inspection Procedure 93812. The inspection should emphasize fact-finding in its review of the circumstances surrounding the event. Safety or security concerns identified that are not directly related to the event should be reported to the Region II office for appropriate action.
Your team will report to the site, conduct an entrance, and begin inspection no later than October 13, 2009. In accordance with IP 9381V-.,, you should promptly recommend a change in inspection scope or escalation if infoirmation indicates that the assumptions utilized in the MD 8.3 risk analysis were not acc-:urate. A report documenting the results of the inspection should be issued within.45 days of the completion of the inspection. A copy of the inspection report shall be forwardeol to the Crystal River Unit 3 License Renewal Inspection Team. The report should .ddress all applicable areas specified in
L. Lake 3 Section 3.02 of Inspection Procedure 93812. At the completion of the inspection, you should provide recommendations for improving the Reactor Oversight Process baseline inspection procedures and the Special Inspection process based on any lessons learned.
This charter may be modified should you develop significant new information that warrants review. Should you have any question concerning this charter, contact Mark Franke at (404) 562-6349.
Docket No.: 50-302 License No.: DPR-72
References:
Inspection Procedure 93812, Special Inspection Management Directive 8.3, NRC Incident Investigation Program Inspection Manual Chapter 0609, Significance Determination Process Inspection Manual Chapter 0612, Power Reactor Inspection Reports cc: R. Borchardt, EDO B. Mallett, DEDR L. Reyes, RII V. McCree, RII J. Munday, RII M. Sykes, RII L. Wert, RII T. Boyce, NRR F. Saba, NRR K. Kennedy, RII H. Christensen, RII S. Ninh, RII C. Fletcher, RII M. Franke, RII M. Khanna, NRR