MONTHYEARPMNS20231217, Nuclear Generating Plant License Termination Plan Public Meeting2023-11-29029 November 2023 Nuclear Generating Plant License Termination Plan Public Meeting PMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20230392, Annual Assessment Meeting2023-04-0707 April 2023 Annual Assessment Meeting PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML21041A4822021-02-10010 February 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed License Amendment Request to Adopt TSTF-505 ML21022A2292021-01-22022 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed Standby Liquid Control System License Amendment Request ML21011A1472021-01-11011 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Inservice Testing of Safety Relief Valves Relief Request ML21007A1942021-01-0707 January 2021 Closed Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Underground Service Water Pipe Coating Relief Valves Relief Request PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14106A2622014-04-16016 April 2014 Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual Assessment ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13350A4002013-12-18018 December 2013 1/16/14 - Notice of Meeting in Crystal River, Fl, to Discuss and Accept Public Comments Related to the Crystal River Unit 3 Nuclear Generating Station Post-Shutdown Decommissioning Activities Report ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13225A1992013-08-13013 August 2013 Correction - 08/29/13 Notice of Forthcoming Meeting with Duke Energy Florida: Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13221A5412013-08-12012 August 2013 Notice of Forthcoming Meeting with Duke Energy Florida, Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 IR 05000261/20130082013-07-18018 July 2013 Notice of Regulatory Conference to Discuss One Finding and the Associated Apparent Violation for the H. B. Robinson, Unit 2, (Ref Inspection Report 05000261-13-008) ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13151A0622013-05-31031 May 2013 Notice of Category 3 Public Meeting to Discuss the NRC Special Inspection on the Reactor Vessel Head Nozzle Repair of Shearon Harris Nuclear Plant, Unit 1 ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13105A1492013-04-15015 April 2013 Notice of Category 3 Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of Crystal River, Unit 3 Nuclear Plant ML13094A2602013-04-0404 April 2013 Notice of Meeting with Carolina Power & Light Company to Discuss NRC Reactor Oversight Process Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML13094A3892013-04-0404 April 2013 Meeting Notice with Public to Discuss the NRC Reactor Oversight Process Annual Assessment of Your H. B. Robinson Steam Electric Plant ML13093A2202013-04-0303 April 2013 Meeting Announcement - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12285A3122012-10-15015 October 2012 11/1/12 Forthcoming Meeting Via Conference Call with Duke Energy, Inc. Representing Florida Power Corporate Concerning Generic Letter 2004-02 and Draft Proposed Strainer Fiber Bypass Test Plan for Crystal River 2023-04-07
[Table view] |
Text
May 5, 2005 MEMORANDUM TO: Michael L. Marshall, Jr., Section Chief, Section 2 Project Directorate II Division of Licensing Project Management FROM: Chandu P. Patel, Project Manager, Section 2 /RA/
Project Directorate II Division of Licensing Project Management
SUBJECT:
FORTHCOMING MEETING WITH PROGRESS ENERGY REGARDING BRUNSWICK, CRYSTAL RIVER, SHEARON HARRIS, AND H. B. ROBINSON DATE & TIME: Tuesday, May 17, 2005, 1:30 p.m - 3:30 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 9B-4 Rockville, Maryland PURPOSE: To discuss the aspects of Progress Energys transition to the new risk-informed, performance-based fire protection program in 10 CFR 50.48©), the National Fire Protection Association (NFPA) 805 Rule, and to discuss participation in the NFPA 805 Transition Pilot Program.
CATEGORY 1*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PROGRESS ENERGY J. Hannon, NRR C. Burton J.Caves S. Weerakkody, NRR J. Ertman P. Gaffney P. Lain, NRR K. Heffner, et al.
C. Patel, NRR, et al.
Docket Nos. 50-325, 50-324, 50-302, 50-261, and 50-400 cc: See next page MEETING CONTACTS: C. Patel, NRR P. Lain, NRR 301-415-3025 301-415-2346 Cpp@nrc.gov PWL@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
May 5, 2005 MEMORANDUM TO: Michael L. Marshall, Jr., Section Chief, Section 2 Project Directorate II Division of Licensing Project Management FROM: Chandu P. Patel, Project Manager, Section 2 /RA/
Project Directorate II Division of Licensing Project Management
SUBJECT:
FORTHCOMING MEETING WITH PROGRESS ENERGY REGARDING BRUNSWICK, CRYSTAL RIVER, SHEARON HARRIS, AND H. B. ROBINSON DATE & TIME: Tuesday, May 17, 2005, 1:30 p.m - 3:30 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 9B-4 Rockville, Maryland PURPOSE: To discuss the aspects of Progress Energys transition to the new risk-informed, performance-based fire protection program in 10 CFR 50.48©), the National Fire Protection Association (NFPA) 805 Rule, and to discuss participation in the NFPA 805 Transition Pilot Program.
CATEGORY 1*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PROGRESS ENERGY J. Hannon, NRR C. Burton J.Caves S. Weerakkody, NRR J. Ertman P. Gaffney P. Lain, NRR K. Heffner, et al.
C. Patel, NRR, et al.
Docket Nos. 50-325, 50-324, 50-302, 50-261, and 50-400 cc: See next page MEETING CONTACTS: C. Patel, NRR P. Lain, NRR 301-415-3025 301-415-2346 Cpp@nrc.gov PWL@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002 Distribution: J. Hannon S. Weerakkody P. Lain B. Mozafari PUBLIC B. Sheron E. Hackett C. Patel E. Dunnington PDII Reading L. Marsh/J. Lyons M. Marshall NRR/ADPT Secy J. Munday PMNS T. Mensah OGC ACRS OPA Receptionist (OWFN and TWFN) KClark J. Jolicoeur P. Fredrickson ADAMS Accession No.: ML051250075 NRC-001 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME CPatel EDunnington MMarshall DATE 5/3/05 5/3/05 5/5/05
OFFICIAL RECORD COPY Carolina Power & Light Company cc:
David T. Conley, Associate General Mr. J. W. Moyer, Vice President Counsel II H. B. Robinson Steam Electric Plant, Legal Department Unit No. 2 Progress Energy Service Company, LLC Carolina Power & Light Company Post Office Box 1551 3581 West Entrance Road Raleigh, North Carolina 27602-1551 Hartsville, South Carolina 29550 Ms. Margaret A. Force Mr. Henry H. Porter, Assistant Director Assistant Attorney General Division of Radioactive Waste Management State of North Carolina South Carolina Department of Health Post Office Box 629 and Environmental Control Raleigh, North Carolina 27602 2600 Bull Street Columbia, South Carolina 29201 U. S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Chris L. Burton, Manager H. B. Robinson Steam Electric Plant Performance Evaluation and Route 5, Box 413 Regulatory Affairs, PEB 7 Hartsville, South Carolina 29550 Progress Energy Post Office Box 1551 Mr. William G. Noll, Director Raleigh, North Carolina 27602-1551 Site Operations H. B. Robinson Steam Electric Plant, U. S. Nuclear Regulatory Commission Unit No. 2 Resident Inspectors Office Carolina Power & Light Company Shearon Harris Nuclear Power Plant 3581 West Entrance Road 5421 Shearon Harris Road Hartsville, South Carolina 29550 New Hill, North Carolina 27562-9998 Ms. Beverly Hall, Section Chief Mr. James Scarola, Vice President N.C. Department of Environment Shearon Harris Nuclear Power Plant and Natural Resources Carolina Power & Light Company Division of Radiation Protection Post Office Box 165 3825 Barrett Dr. New Hill, North Carolina 27562-0165 Raleigh, North Carolina 27609-7721 Mr. Cornelius J. Gannon, Vice President Mr. Robert P. Gruber, Executive Director Brunswick Steam Electric Plant Public Staff Carolina Power & Light Company N. C. Utilities Commission Post Office Box 10429 4326 Mail Service Center Southport, North Carolina 28461-0429 Raleigh, North Carolina 27699-4326 Resident Inspector U. S. Nuclear Regulatory Commission Mr. David R. Sandifer, Chairperson Brunswick Steam Electric Plant Brunswick County Board of Commissioners 8470 River Road Post Office Box 249 Southport, North Carolina 28461 Bolivia, North Carolina 28422 Mr. Robert J. Duncan II, Director Mr. John H. ONeill, Jr. Site Operations Shaw, Pittman, Potts & Trowbridge Shearon Harris Nuclear Power Plant 2300 N Street, NW. Carolina Power & Light Company Washington, DC 20037-1128 Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165
Mr. Herb Council, Chair Mr. T. P. Cleary, Director Board of County Commissioners of Site Operations Wake County Brunswick Steam Electric Plant P.O. Box 550 Carolina Power & Light Company Raleigh, North Carolina 27602 Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Edward T. ONeil Manager - Support Services Mr. David H. Hinds Brunswick Steam Electric Plant Plant General Manager Carolina Power & Light Company Brunswick Steam Electric Plant P.O. Box 10429 Carolina Power & Light Company Southport, North Carolina 28461 Post Office Box 10429 Southport, North Carolina 28461-0429 J. F. Lucas, Manager Support Services - Nuclear Mr. Norman R. Holden, Mayor H. B. Robinson Steam Electric Plant, City of Southport Unit No. 2 201 East Moore Street Carolina Power & Light Company Southport, North Carolina 28461 3581 West Entrance Road Hartsville, South Carolina 29550 Public Service Commission State of South Carolina Mr. Terry C. Morton, Manager Post Office Drawer 11649 Support Services Columbia, South Carolina 29211 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Mr. Warren Lee Post Office Box 165, Mail Zone 1 Emergency Management Director New Hill, North Carolina 27562-0165 New Hanover County Department of Emergency Management Mr. David H. Corlett, Supervisor Post Office Box 1525 Licensing/Regulatory Programs Wilmington, North Carolina 28402-1525 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Chairman of the North Carolina Post Office Box 165, Mail Zone 1 Utilities Commission New Hill, North Carolina 27562-0165 Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Dan Stoddard, Plant General Manager H. B. Robinson Steam Electric Plant, Mr. C. T. Baucom Unit No. 2 Supervisor, Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Unit No. 2 Hartsville, South Carolina 29550 Carolina Power & Light Company 3581 West Entrance Road Mr. Tommy Emerson, Chair Hartsville, South Carolina 29550 Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312
Mr. C. S. Hinnant, Senior Vice President Nuclear Generation & Chief Nuclear Officer Progress Energy CPB 12 Post Office Box 1551 Raleigh, North Carolina 27602-1551
Crystal River Nuclear Plant Unit 3 Florida Power Corporation cc:
Mr. R. Alexander Glenn Chairman Associate General Counsel (MAC-BT15A) Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue St. Petersburg, Florida 33733-4042 Inverness, Florida 34450-4245 Mr. Jon A. Franke Mr. Michael J. Annacone Plant General Manager Engineering Manager Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Jim Mallay Mr. Daniel L. Roderick Framatome ANP Director Site Operations 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)
Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Senior Resident Inspector Bureau of Radiation Control Crystal River Unit 3 2020 Capital Circle, SE, Bin #C21 U.S. Nuclear Regulatory Commission Tallahassee, Florida 32399-1741 6745 N. Tallahassee Road Crystal River, Florida 34428 Attorney General Department of Legal Affairs Mr. Richard L. Warden The Capitol Manager Nuclear Assessment Tallahassee, Florida 32304 Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Mr. Craig Fugate, Director Crystal River, Florida 34428-6708 Division of Emergency Preparedness Department of Community Affairs Mr. Dale E. Young, Vice President 2740 Centerview Drive Crystal River Nuclear Plant (NA1B)
Tallahassee, Florida 32399-2100 ATTN: Supervisor, Licensing
& Regulatory Programs David T. Conley 15760 W. Power Line Street Associate General Counsel II - Legal Dept. Crystal River, Florida 34428-6708 Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551