ML072350015

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Progress Energy Florida to Discuss the Status of the Power Uprates at Crystal River, Unit 3
ML072350015
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 08/23/2007
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLII-2
To: Boyce T
NRC/NRR/ADRO/DORL/LPLII-2
Bailey S N
References
Download: ML072350015 (5)


Text

August 23, 2007 MEMORANDUM TO: Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing FROM: Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 BMoroney for /RA/

Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH PROGRESS ENERGY FLORIDA DATE & TIME: Friday, September 7, 2007 9:00 a.m. to 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-4 B6 Rockville, Maryland PURPOSE: To discuss the status of the power uprates at Crystal River Unit 3.

CATEGORY 1:* This is a Category 1 Meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC LICENSEE T. McGinty D. Roderick T. Boyce D. Varner S. Bailey T. Williams et al. K. Wilson P. Infanger P. Rose Docket No. 50-302

Enclosure:

Agenda cc w/encl: See next page CONTACTS: Stewart Bailey, NRR M. Vaaler, NRR 301-415-1321 301-415-3178 snb@nrc.gov mgv@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

AGENDA FOR THE SEPTEMBER 7, 2007, PUBLIC MEETING BETWEEN THE NRC AND PROGRESS ENERGY FLORIDA REGARDING THE STATUS OF POWER UPRATES AT CRYSTAL RIVER UNIT 3 AGENDA:

I. Margin Uncertainty Recapture A. License Amendment Request

1. Submittals
2. Requests for Additional Information a.) Response Summary b.) Feedback 3.Technical Specification Changes a.) Rated Thermal Power Definition b.) Treatment of leading-edge flow meeter (LEFM) and Input Unavailability c.) Current Proposal B. Status of Engineering/Installation Activities
1. Configuration Change (LEFM and Flow Straighteners)
2. Completed Engineering Change Packages
3. Preinstallation Testing Progress
4. Installation Status
5. Schedule II. Extended Power Uprate A. Major Task Status
1. NSSS a.) License Amendment Request b.) Safety and Transient Analysis c.) Fuels
2. Focus Areas a.) Rapid Cooldown b.) Core Flood Line Break c.) Mass and Energy Input Validation d.) Confirmation of Boron Precipitation Mitigation e.) Ultimate Heat Sink Systems
3. Turbine Generator
4. Balance of Plant
5. Schedule Enclosure

ML072350015 OFFICE LPLII-2/PM LPLII-2/LA LPLII-2/BC NAME BMonroney for SBailey BClayton BMoroney for TBoyce DATE 08 / 23 /07 08 / 23 /07 08 / 23 /07

SUBJECT:

FORTHCOMING MEETING ON APRIL 27, 2007, WITH PROGRESS ENERGY FLORIDA Date: August 23, 2007 DISTRIBUTION:

RidsNrrDorlLpl2-2 RidsOgcMailCenter RidsRgn2MailCenter RidsOpaMailCenter RidsAcrsAcnwMailCenter RidsNrrAdro RidsNrrLABClayton RidsNrrPMSBailey RidsNrrDorl PUBLIC LPL2-2 R/F T. Liu, NRR K. Clark, RII S. Campbell, EDO Receptionist (OWFN & TWFN)

PMNS

Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:

Mr. R. Alexander Glenn Mr. Jon A. Franke Associate General Counsel (MAC-BT15A) Director Site Operations Florida Power Corporation Crystal River Nuclear Plant (NA2C)

P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Michael J. Annacone Senior Resident Inspector Plant General Manager Crystal River Unit 3 Crystal River Nuclear Plant (NA2C) U.S. Nuclear Regulatory Commission 15760 W. Power Line Street 6745 N. Tallahassee Road Crystal River, Florida 34428-6708 Crystal River, Florida 34428 Mr. Jim Mallay Ms. Phyllis Dixon Framatome ANP Manager, Nuclear Assessment 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)

Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health David T. Conley Bureau of Radiation Control Associate General Counsel II - Legal Dept.

2020 Capital Circle, SE, Bin #C21 Progress Energy Service Company, LLC Tallahassee, Florida 32399-1741 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Attorney General Department of Legal Affairs Mr. Daniel L. Roderick The Capitol Vice President, Nuclear Projects &

Tallahassee, Florida 32304 Construction Crystal River Nuclear Plant (SA2C)

Mr. Craig Fugate, Director 15760 W. Power Line Street Division of Emergency Preparedness Crystal River, Florida 34428-6708 Department of Community Affairs 2740 Centerview Drive Mr. David Varner Tallahassee, Florida 32399-2100 Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C)

Chairman 15760 W. Power Line Street Board of County Commissioners Crystal River, Florida 34428-6708 Citrus County 110 North Apopka Avenue Mr. Dale E. Young, Vice President Inverness, Florida 34450-4245 Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing Mr. Stephen J. Cahill (Acting) & Regulatory Programs Engineering Manager 15760 W. Power Line Street Crystal River Nuclear Plant (NA2C) Crystal River, Florida 34428-6708 15760 W. Power Line Street Crystal River, Florida 34428-6708