MONTHYEARPMNS20231217, Nuclear Generating Plant License Termination Plan Public Meeting2023-11-29029 November 2023 Nuclear Generating Plant License Termination Plan Public Meeting PMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20230392, Annual Assessment Meeting2023-04-0707 April 2023 Annual Assessment Meeting PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML21041A4822021-02-10010 February 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed License Amendment Request to Adopt TSTF-505 ML21022A2292021-01-22022 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed Standby Liquid Control System License Amendment Request ML21011A1472021-01-11011 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Inservice Testing of Safety Relief Valves Relief Request ML21007A1942021-01-0707 January 2021 Closed Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Underground Service Water Pipe Coating Relief Valves Relief Request ML20329A3812020-12-0707 December 2020 Regulatory Audit Summary Regarding License Amendment Request to Adopt Risk Informed Completion Times Technical Specification Task Force-505, Rev. 2, Provide Risk-Informed Completion Times (EPID L-2019-LLA-0218 PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML18130A6942018-05-10010 May 2018 Agenda - Power Uprates Subcommittee Meeting - May 16, 2018 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15343A0712015-12-23023 December 2015 September 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14140A2912014-05-20020 May 2014 EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric Plant ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14106A2622014-04-16016 April 2014 Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual Assessment ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13350A4002013-12-18018 December 2013 1/16/14 - Notice of Meeting in Crystal River, Fl, to Discuss and Accept Public Comments Related to the Crystal River Unit 3 Nuclear Generating Station Post-Shutdown Decommissioning Activities Report ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13225A1992013-08-13013 August 2013 Correction - 08/29/13 Notice of Forthcoming Meeting with Duke Energy Florida: Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 ML13221A5412013-08-12012 August 2013 Notice of Forthcoming Meeting with Duke Energy Florida, Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events 2023-04-07
[Table view] Category:Meeting Notice
MONTHYEARPMNS20231217, Nuclear Generating Plant License Termination Plan Public Meeting2023-11-29029 November 2023 Nuclear Generating Plant License Termination Plan Public Meeting PMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20230392, Annual Assessment Meeting2023-04-0707 April 2023 Annual Assessment Meeting PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML21041A4822021-02-10010 February 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed License Amendment Request to Adopt TSTF-505 ML21022A2292021-01-22022 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed Standby Liquid Control System License Amendment Request ML21011A1472021-01-11011 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Inservice Testing of Safety Relief Valves Relief Request ML21007A1942021-01-0707 January 2021 Closed Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Underground Service Water Pipe Coating Relief Valves Relief Request PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14106A2622014-04-16016 April 2014 Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual Assessment ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13350A4002013-12-18018 December 2013 1/16/14 - Notice of Meeting in Crystal River, Fl, to Discuss and Accept Public Comments Related to the Crystal River Unit 3 Nuclear Generating Station Post-Shutdown Decommissioning Activities Report ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13225A1992013-08-13013 August 2013 Correction - 08/29/13 Notice of Forthcoming Meeting with Duke Energy Florida: Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13221A5412013-08-12012 August 2013 Notice of Forthcoming Meeting with Duke Energy Florida, Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 IR 05000261/20130082013-07-18018 July 2013 Notice of Regulatory Conference to Discuss One Finding and the Associated Apparent Violation for the H. B. Robinson, Unit 2, (Ref Inspection Report 05000261-13-008) ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13151A0622013-05-31031 May 2013 Notice of Category 3 Public Meeting to Discuss the NRC Special Inspection on the Reactor Vessel Head Nozzle Repair of Shearon Harris Nuclear Plant, Unit 1 ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13105A1492013-04-15015 April 2013 Notice of Category 3 Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of Crystal River, Unit 3 Nuclear Plant ML13094A2602013-04-0404 April 2013 Notice of Meeting with Carolina Power & Light Company to Discuss NRC Reactor Oversight Process Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML13094A3892013-04-0404 April 2013 Meeting Notice with Public to Discuss the NRC Reactor Oversight Process Annual Assessment of Your H. B. Robinson Steam Electric Plant ML13093A2202013-04-0303 April 2013 Meeting Announcement - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12285A3122012-10-15015 October 2012 11/1/12 Forthcoming Meeting Via Conference Call with Duke Energy, Inc. Representing Florida Power Corporate Concerning Generic Letter 2004-02 and Draft Proposed Strainer Fiber Bypass Test Plan for Crystal River 2023-04-07
[Table view] |
Text
November 22, 2004 MEMORANDUM TO: Michael L. Marshall, Section Chief, Section 2 Project Directorate II Division of Licensing Project Management FROM: Chandu P. Patel, Project Manager, Section 2 /RA/
Project Directorate II Division of Licensing Project Management
SUBJECT:
FORTHCOMING MEETING WITH PROGRESS ENERGY REGARDING BRUNSWICK, CRYSTAL RIVER, SHEARON HARRIS, AND H. B. ROBINSON DATE & TIME: December 9, 2004, 1:30 p.m - 4:00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 8 B 4 Rockville, Maryland PURPOSE: To communicate the current status and results to date of Progress Energys initiatives in the area of Fire Protection. It will include sharing insights on the results and discussion of future needs for submitting information for NRC reviews.
CATEGORY 1*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PROGRESS ENERGY J. Hannon, NRR P. Gaffney F. Modlin S. Weerakkody, NRR J. Ertman S. Hardy D. Frumkin, NRR K. Heffner C. Baucom, et al.
C. Patel, et al.
Docket Nos. 50-325, 50-324, 50-302, 50-261, and 50-400
Attachment:
Agenda cc w/att: See next page MEETING CONTACTS: C. Patel, NRR B. Mozafari, NRR 301-415-3025 301-415-2020 Cpp@nrc.gov BLM@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
AGENDA FOR MEETING WITH PROGRESS ENERGY DECEMBER 9, 2004 I. Update on Safe Shutdown Analysis and Manual Action Feasibility projects A. Status B. Results C. Insights D. Future communications with NRC II. Obtain NRC insights and impressions on fleet initiative plans and activities
ML043270375 P. Fredrickson KClark OFFICE PDII-2/PM PDII-2/LA PDII-2/SC (A)
NAME CPatel EDunnington BMoroney DATE 11/22/04 By Phone 11/22/04 11/22/04 Carolina Power & Light Company cc:
Steven R. Carr, Associate General Counsel Mr. John H. ONeill, Jr.
Legal Department Shaw, Pittman, Potts & Trowbridge Progress Energy Service Company, LLC 2300 N Street, NW.
Post Office Box 1551 Washington, DC 20037-1128 Raleigh, North Carolina 27602-1551 Mr. J. W. Moyer, Vice President Ms. Margaret A. Force H. B. Robinson Steam Electric Plant, Assistant Attorney General Unit No. 2 State of North Carolina Carolina Power & Light Company Post Office Box 629 3581 West Entrance Road Raleigh, North Carolina 27602 Hartsville, South Carolina 29550 U. S. Nuclear Regulatory Commission Mr. Henry H. Porter, Assistant Director Resident Inspector's Office Division of Radioactive Waste Management H. B. Robinson Steam Electric Plant South Carolina Department of Health Route 5, Box 413 and Environmental Control Hartsville, South Carolina 29550 2600 Bull Street Columbia, South Carolina 29201 Mr. William G. Noll, Director Site Operations Mr. Chris L. Burton, Manager H. B. Robinson Steam Electric Plant, Performance Evaluation and Unit No. 2 Regulatory Affairs, PEB 7 Carolina Power & Light Company Progress Energy 3581 West Entrance Road Post Office Box 1551 Hartsville, South Carolina 29550 Raleigh, North Carolina 27602-1551 Ms. Beverly Hall, Section Chief U. S. Nuclear Regulatory Commission N.C. Department of Environment Resident Inspectors Office and Natural Resources Shearon Harris Nuclear Power Plant Division of Radiation Protection 5421 Shearon Harris Road 3825 Barrett Dr. New Hill, North Carolina 27562-9998 Raleigh, North Carolina 27609-7721 Mr. James Scarola, Vice President Mr. Robert P. Gruber, Executive Director Shearon Harris Nuclear Power Plant Public Staff Carolina Power & Light Company N. C. Utilities Commission Post Office Box 165 4326 Mail Service Center New Hill, North Carolina 27562-0165 Raleigh, North Carolina 27699-4326 Mr. Cornelius J. Gannon, Vice President Resident Inspector Brunswick Steam Electric Plant U. S. Nuclear Regulatory Commission Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10429 8470 River Road Southport, North Carolina 28461-0429 Southport, North Carolina 28461
Mr. David R. Sandifer, Chairperson Carolina Power & Light Company Brunswick County Board of Commissioners 3581 West Entrance Road Post Office Box 249 Hartsville, South Carolina 29550 Bolivia, North Carolina 28422 Mr. Herb Council, Chair Mr. Robert J. Duncan II, Director Board of County Commissioners of Site Operations Wake County Shearon Harris Nuclear Power Plant P.O. Box 550 Carolina Power & Light Company Raleigh, North Carolina 27602 Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Edward T. ONeil Manager - Support Services Mr. T. P. Cleary, Director Brunswick Steam Electric Plant Site Operations Carolina Power & Light Company Brunswick Steam Electric Plant P.O. Box 10429 Carolina Power & Light Company Southport, North Carolina 28461 Post Office Box 10429 Southport, North Carolina 28461-0429 J. F. Lucas, Manager Support Services - Nuclear Mr. David H. Hinds H. B. Robinson Steam Electric Plant, Plant General Manager Unit No. 2 Brunswick Steam Electric Plant Carolina Power & Light Company Carolina Power & Light Company 3581 West Entrance Road Post Office Box 10429 Hartsville, South Carolina 29550 Southport, North Carolina 28461-0429 Mr. Terry C. Morton, Manager Mr. Norman R. Holden, Mayor Support Services City of Southport Shearon Harris Nuclear Power Plant 201 East Moore Street Carolina Power & Light Company Southport, North Carolina 28461 Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Public Service Commission State of South Carolina Mr. David H. Corlett, Supervisor Post Office Drawer 11649 Licensing/Regulatory Programs Columbia, South Carolina 29211 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Mr. Warren Lee Post Office Box 165, Mail Zone 1 Emergency Management Director New Hill, North Carolina 27562-0165 New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2
Mr. Dan Stoddard, Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312 Mr. C. S. Hinnant, Senior Vice President Nuclear Generation & Chief Nuclear Officer Progress Energy CPB 12 Post Office Box 1551 Raleigh, North Carolina 27602-1551
Crystal River Nuclear Plant Unit 3 Florida Power Corporation cc:
Mr. R. Alexander Glenn Chairman Associate General Counsel (MAC-BT15A) Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue St. Petersburg, Florida 33733-4042 Inverness, Florida 34450-4245 Mr. Jon A. Franke Mr. Michael J. Annacone Plant General Manager Engineering Manager Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Jim Mallay Mr. Daniel L. Roderick Framatome ANP Director Site Operations 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)
Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Senior Resident Inspector Bureau of Radiation Control Crystal River Unit 3 2020 Capital Circle, SE, Bin #C21 U.S. Nuclear Regulatory Commission Tallahassee, Florida 32399-1741 6745 N. Tallahassee Road Crystal River, Florida 34428 Attorney General Department of Legal Affairs Mr. Richard L. Warden The Capitol Manager Nuclear Assessment Tallahassee, Florida 32304 Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Mr. Craig Fugate, Director Crystal River, Florida 34428-6708 Division of Emergency Preparedness Department of Community Affairs Mr. Dale E. Young, Vice President 2740 Centerview Drive Crystal River Nuclear Plant (NA1B)
Tallahassee, Florida 32399-2100 ATTN: Supervisor, Licensing
& Regulatory Programs Steven R. Carr 15760 W. Power Line Street Associate General Counsel - Legal Dept. Crystal River, Florida 34428-6708 Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551