Summary of Tele Conference Call Held on 12/1/09, Btw the USNRC and Florida Power Corp, Concerning Licensee Response to a RAI Pertaining to the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application
ML100141593
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/16/2010
From: Robert Kuntz
License Renewal Projects Branch 2
To:
Florida Power Corp
KUNTZ R, NRR/DLR, 415-2989
References
Download: ML100141593 (7)


Text

February 16, 2010 LICENSEE: Florida Power Corporation FACILITY: Crystal River Unit 3 Nuclear Generating Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 1, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FLORIDA POWER CORPORATION, CONCERNING APPLICANT RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Florida Power Corporation (FPC, the applicant) held a telephone conference call on December 1, 2009 to discuss the applicants response to a request for additional information (RAI) concerning the Crystal River Unit 3 Nuclear Generating Plant (CR-3) license renewal application (LRA). The telephone conference call was useful in clarifying the applicants RAI response.

During the teleconference, the staff sought clarification on responses to RAI B.2.3-1 and B.2.8-2 provided in a letter dated October 13, 2009 (ADAMS Accession No. ML092890155). The staff sought clarification on when the applicant would begin using the new lubricant that does not contain molybdenum disulfide on the reactor head closure studs as addressed in the response to RAI B.2.3-1. The applicant clarified that as described in the on-site program documentation the Reactor Head Closure Studs Program had been enhanced to replace the molybdenum-disulfide-based lubricant with the new lubricant and any future lubrication of the reactor head closure studs would use the new lubricant that does not contain molybdenum disulfide.

In response to RAI B.2.8-2 the applicant stated that [i]n the absence of actual measured yield strength data, bolting specified in the range considered medium strength by NUREG-1339 (i.e.

bolting with 120<Sy<150 ksi) and above will be assumed to be high strength bolting. The applicant clarified that these bolts will be considered for the high strength bolting inspections that will be performed to manage stress corrosion cracking (SCC) and the sampling size of the

Florida Power Corporation inspections will be based on the methodology described in EPRI TR-107514. The applicant also clarified that in consideration of the operating experience that no bolting failure has been attributed to SCC, the random sampling based on the methodology in EPRI TR-107514 is adequate to manage the aging effect due to SCC.

The enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

/RA/

Robert Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-302

Enclosure:

List of Participants cc w/encl: See next page

ML100141593 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SFigueroa RKuntz DWrona RKuntz DATE 01/15/10 01/19/10 02/05/10 02/16/10

TELEPHONE CONFERENCE CALL CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 1, 2009 PARTICIPANTS AFFILIATIONS Robert Kuntz U.S. Nuclear Regulatory Commission (NRC)

Seung Min NRC Mike Heath Florida Power Corporation (FPC)

Chris Malner FPC Jeff Lane FPC ENCLOSURE

Letter to Florida Power Corporation from Robert Kuntz dated February 16, 2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 1, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FLORIDA POWER CORPORATION, CONCERNING LICENSEE RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLICRidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource

________

RKuntz DBrittner AJones, OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RI

Crystal River Unit 3 Nuclear Generating Plant cc:

Mr. R. Alexander Glenn Mr. Daniel R. Westcott Associate General Counsel (MAC-BT15A) Supervisor, Licensing & Regulatory Florida Power Corporation Programs P.O. Box 14042 Crystal River Nuclear Plant St. Petersburg, FL 33733-4042 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. James W. Holt Plant General Manager Senior Resident Inspector Crystal River Nuclear Plant (NA2C) Crystal River Unit 3 15760 W. Power Line Street U.S. Nuclear Regulatory Commission Crystal River, FL 34428-6708 6745 N. Tallahassee Road Crystal River, FL 34428 Mr. William A. Passetti, Chief Department of Health Mr. Jack E. Huegel Bureau of Radiation Control Manager, Nuclear Oversight 2020 Capital Circle, SE, Bin #C21 Crystal River Nuclear Plant (NA2C)

Tallahassee, FL 32399-1741 15760 W. Power Line Street Crystal River, FL 34428-6708 Attorney General Department of Legal Affairs Mr. David T. Conley The Capitol Associate General Counsel II - Legal Dept.

Tallahassee, FL 32304 Progress Energy Service Company, LLC P.O. Box 1551 Mr. Ruben D. Almaguer, Director Raleigh, NC 27602-1551 Division of Emergency Preparedness Department of Community Affairs Mr. Michael P. Heath 2740 Centerview Drive Supervisor, License Renewal Tallahassee, FL 32399-2100 Progress Energy 8470 River Road, 2E Chairman Southport, NC 28461 Board of County Commissioners Citrus County Mr. Mark Rigsby 110 North Apopka Avenue Manager, Support Services - Nuclear Inverness, FL 34450-4245 Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Mr. Stephen J. Cahill Crystal River, FL 34428-6708 Engineering Manager Crystal River Nuclear Plant (NA2C) Mr. Robert J. Duncan II 15760 W. Power Line Street Vice President, Nuclear Operations Crystal River, FL 34428-6708 Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551

Crystal River Unit 3 Nuclear Generating Plant cc:

Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708