ML17348B287

From kanterella
Revision as of 15:48, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1991 for Turkey Point Units 3 & 4.W/911213 Ltr
ML17348B287
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1991
From: PLUNKETT T F, TIERNEY R A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-333, NUDOCS 9112240319
Download: ML17348B287 (19)


Text

ACCELERATED DISTRIBUTION DEMONS~TION SYSTEM 1~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION TIERNEY,R.A.

Florida Power&Light Co.PLUNKETT,T.F.

Florida Power&Light Co.R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl repts for Nov 1991 for Turkey Point Units 3&4 911213 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED ILTR i ENCL Q SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD2-2'A AULUCK,R INTERNAL: AEOD/DOA PEB10 R FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 D D D NOTE TO ALL"RIDS" RECIPIENIS:

D D PLEASE HELP US TO REDUCE WASFE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 ii'I P.O.Box 029100, Miami, FI33102-9100 DEC 1$'IS[L-91-333 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the November 1991 Operating Status and Summary of Operating Experience.

Reports for'Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D.Ebneter, Reg'i:onal Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9112240319 911130 PDR ADOCK 05000250:R PDR~wu-~an FPL Group company 7p t'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE December 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305'46-6970 MONTH November 1991 AVERAGE DAILY POWER LEVEL (MWe-Net)11/01/91 11/02/91 11/03/91 11/04/91 11/05/91 11/06/91 11/07/91 11/08/91 11/09/91 11/10/91 11/11/91 11/12/91 11/13/91 11/14/91 11/15/91 11/16/91 11/17/91 11/18/91 11/19/91 11/20/91 11/21/91 11/22/91 11/23/91 11/24/91 11/25/91 11/26/91 11/27/91 11/28/91 11/29/91 11/30/91 682 678 674 673 682 688 684 680 687 703 704 703 487 401 692 568 463 646 614 646 648 619 342 609 693 702 703 686 695 693 444k l y'I P'll OPERATING STATUS OPERATING DATA RFPORT DOCKET NO 50-250 DATE 12/1 1/91 COMP!.ETED BY R.A.TIERNEY TELEPHONE 305/246/6970 1.UNIT NAME: TURKEY POINT UNIT 3 2.ttEPOR!ING PERIOD: NOVEMBER 199 1 3.'CENSED THERMAL POWER (MliilT)E 2200 4.NAMEPLATE RATING (GROEL MWE)I 760 E.OEEIGN ELECTRICAL RATING (NET MWE): ,'393 6, MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NEt MWE): 666 8.:f Ct(ANGES OCCUR IN CAPACITY RAIIN(5 (ITEMS tEUMBER 3 THROUGH 7)StNCE LAST REPORT, GlVE REASONSE 9 POWFR LEVEL TO WHICH RESTRICTED'P ANY (~ET MWE)!0.Rf.ASUNS FOR RESTRICTIONS, IF ANY: hIONTHLY YTO-CUMULATIVE 11~I!OURS IN REPORT PERIOD: 3 2, NUMBLtt OF t!OURS REACTOR WAS CRITICAL:3.Rf A<Tt)R RESFRVE SHUTDOWN HOURS,'4."Ot)R'ENERATOR ON-LINE 15."I'OBSERVE SHUTDOWN HOURS 1 6'E~>'PS THERMAL ENERGY GFNERATED (MWtt)7.LRE)5:3 t(LEI TR ICAI.EN RGY GENERATED (MWH)3 8-'El>f t ECTRI CAL Et!ERGY GENERATED (MWH)!9 v 1 SERVICE FACTOR 2G UN)t AVAILABILITY FACTOR 2'.APACE)'Y FACTOR" USING MDC NE1)2.E.Af'AC'.TY 1-AC10R (USING DER NET)23 Et I 1 3 OltCED OUTAGRE RATE 74.SEE"'1)OWNS SCHEDtt'D OVER NEX-6 MONTHS 720 720.0 0.0 720.0 g~0.0 t=a3685 482405 459450 160 0 100.0 95.8 92.!0.0 8016 1508.1 0.0 1411.8 0.0 2699222 862070 798932 17.6 17.6 15.0 14.4 1.8 166449.6 10598 1.3 844.4 104467 5 121.8 216930864 69478061 65677450 62,8 62.8 60.4 56.9 12.3 25.IF St'13 I DOWN A1 END OF REV')8 I 1'I:R lOU.Eb 1 I MAT ED DATE OF STARTUP t

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November, 1991 DOCKET NO.50 250 UNIT NAME Turkey Point II 3 pATE December ll, 1993.COMPLETED BY-A Tierney TELEPHONE (305)246-6970 No.Date Type'uration (Hours)Reason~Method of Shutting Down Reactor" Ucensee Event Report¹System Code4 Component odes Cause&Corrective Actionto Prevent Recurrence 03 9111133 F 27:25 N/A RB CONROD Unit 3 reduced power due to control rods partially inserting into the core.04 9111166 12r89 N/A CC VALVEX Unit 3 reduced power due to a reheat intercept valve failing to re-open within 5 mine.05 911122 36:40 N/A HC PUMPXX Unit 3 reduced power to.repair the 3B Heater Drain Pump.F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Exphin)Exhibit G-instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)

File (NUAEG4161) 5 Exhibit1-Same Source II

SUMMARY

OF OPERATING EXPERIENCE'OCKET NO.50-250 UNIT Turke Point 3 DATE December 12 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 REPORT MONTH November 1991 While performing equipment repairs on the (manual/auto) station PCV-3-455C the Pressurizer Operating Reli.'ef Valve (PORV)was opened.Unit 3 reduced power on November 13', 1991 due to four (4)control rods in Rod Bank C partially inserting into the core.This occurred during maintenance of a"Signal" card in the Rod Control Cabinet.Unit 3 returned to full power on November 14, 1991.Unit 3 reduced power on November 16, 1991 when the Southeast Reheat Intercept Valve failed to re-open within 5,minutes.

The Reheat Intercept Valve was repaired and Unit 3 was returned to full power on November 17, 1991..Unit 3 again reduced power on November 22, 1991 to repair the 3B Heater Drain Pump.Unit 3 was returned to full power on November 24, 1991.

II 0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT Turke Point 4 DATE December 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 MONTH November 1991 AVERAGE DAILY POWER (MÃe-Net)LEVEL 11/01/91 11/02/91 11/03/91 11/04/91 11/05/91 11/06/91 11/07/91 11/08/91 11/09/91 11/10/91 11/11/91'11/12/91 11/13/91 11/14/91 11/15/91 11/16/91 11/17/91 11/18/91 11/19/91 11/20/91 11/21/91 11/22/91 11/23/91 11/24/91 11/25/91 11/26/91 11/27/91 11/28/91 11/29/91 11/30/91 281 287 485 668 675 654 681 679 685 692 692 690 690 688 684 681 678 676 679 678 677 677 674 673 544 217 295 510 681 681 "1 Q(t 4 i)t 0 0>ERAT ING STATUS OPERATING DATA REPORT DOCKE1'O 50-251 DATE 12/11/91 COMPLETED BY R.A.TIFRNEY TELEPHONE 305/246/6970 UNIT NAME: TURKEY POINT UNIT 4 2.REPORtING PERIOD: NOVEMBER l99l l 1CENSEO THERMAL POWER (MW>)6 2200 4 NAMEPLATE RATING (GROSS MWE): 760 6'I'SIGN ELECTRICAI.

RATIIIG (NET MITE)I 693 6.MAXIMUM OEPENOABLE CAPACITY (GROSS MNE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B.1F CEIANGES OCCUR IN CAPACITY RA1 INIAS (I IEMS NUMBER 3 THROUGH 7)SINCE AST REPORTS GIVE REASONS: 9.1'OWER LEVEL TO WHICH RESTRICTED, IF ANY (NE>MWE)10 REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.T(OURS IN RElrURT PERIOD: 1~PlUMBER OF HOURS REACTOR WAS CRITICAL;3.Pra(tOR RESERVE SHUTDOWN HOURS 14.TOU()S GENERATOR ON-LINE 15.l>NI1 RCSERVE SHUTDOWN HOURS (r((Umb ELLCTR I CAL ENERGY GENERATED (MWH)18.Nl.'-f 1 Ei.,RICAL FNf 4GY GENERATED (MWH)19.trW1,'ERVICE FACTOR 20.UN I.'vP ILABILI't'Y FACTOR:-'1.CAP</I"~FACTOR (U ING MDC FIET)~22.LaPaLl 1 Y iALfOR'.AJSING DER NET)23 Nl1 Fi)(lCED OU-n.0 RATE 24=SSl(ETDOWAIS SCHFOl.0/ER NEX (MONTHS 720 7'20.0 0.0 720.0 0.0 1445968 460775 438067 100.0 100.0 91.4 87.8 0.0 8016 864.6 0.0 782.7 0.0 1501489 475130 434851 9.8 9.8 8.1 7.8 0.0 160181.0 102050.9 166.6 98349.8 32.}207131549 66088010 62488479 61.4 61.4 59.7 56.3 11.8.25~<<F SHUf-DOWN AT END OF REPOR'1 PFRIOU.ESIIMAIED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November, 1991 DOCKET NO.ff UNjT NAME Turke Foint P4" DATE December 11 1991 COMPLETED BY R.A.Tierney TELEPHONE 305 246-6970 Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause S Corrective Actionto Prevent Recurrence 911031 54 44 B IC INST RU Unit 4 reduced power for current adjust-ments on the Nuclear Instrumentation System (NIS).911125 68:30 N/A SG COND Unit 4 reduced power to perform repairs on a condenser tube leak.F Forced S Scheduled 2 Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error(Exphin)

H-Other(Exphin)

Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Exphin)

Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report (LER)File (NUREG4161)

Exhibit1-Same Source

'~l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE December'll 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 REPORT MONTH November 1991 Unit 4 reduced power on October 31, 1991 to perform current adjustments on the Nuclear Instrumentation System (NIS).Unit 4 was returned to full power on November 3, 1991.Unit 4 reduced power on November 25, 1991 to perform repairs on a Condenser Tube leak.The unit was returned to full power.on November 28, 1991.

0 0 1 1 8,~