Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr
ML17354A298
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1996
From: HOVEY R J, KNORR J E
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 L-96-266, NUDOCS 9610230098
Download: ML17354A298 (14)


Text

CATEGORY 1.REGULRT INFORMATION DISTRIBUTION%'STEM (RIDE)4 ACCESSION NBR 9610230098

'DOC.DATE:

96/09/30 NOTARIZED:

NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light'05PPP25P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power a Light Co.HOVEY,R.J.

Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1996 for Turkey Point Units 3&4.W/961014 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 EXTERNAL: LITCO BRYCEFJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R FILE CENTER 0 PA NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 D 0 NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I%a OCT14>SS6 L-96-266 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20S55.Re: Turkev Point Units 3 and 4 Docket Nos.50-250 and SO-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the September 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, Ql R.J.Hove Vice Presi ent Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9'6L0230098 9'h09'30 PDR ADOCK 05000250 R PDR~gQO'72 g~~~'/(an FPL Group company "s I II dl AVERAGE DAIL NIT POWER LEVEL MONTH Se tember, 1996 DOCKET NO.50-250 UNIT Turkey Point I/3 DATE Oct 08, 1996 COMPLETED BY J.E.Knorr TELEPHONE (305)246-6757 DAY 09/01/96 09/02/96 09/03/96 09/04/96 09/05$6 09/06/96 09/07/96 09/08/96 09/09/96 09/10$6 09/11$6 09/12/96 09/13/96 09/14/96 09/15/96 09/16/96 09/17/96 09/18/96 09/19/96 09/20/96 09/21/96 09/22/96 09/23/96 09/24$6 09/25/96 09/26/96 09/27/96 09/28/96 09/29/96 09/30/96 AVERAGE DAILY POWER LEVEL (MWe-Net)667 667 664 666 669 668 666 667 673 676 674 671 669 668 666 669 670 668 668 668 667 667 663 91 0 0 0 556 674 674 I

OPE NG DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-250 10/10/96 J.E.Knorr (305)2464757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: September, 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION, IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: Refueling shutdown scheduled March of 1997 MONTHLY 720.0 651.6 0.0 631.3 0.0 1387030 438277 415364 87.7 87.7 86.6 83.2 12.3-YTD-6575.0 6336.6 0.0 6282.4 0.0 13505852 4384455 4176647 95.5 95.5 95.3 91.7 CUMULATIVE 208832.6 143242.3 844.2 141178.2 121.8 294536871 94621440 89590543 67.6 67.6 64.4 61.9 10.4 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH SEPTEMBER 1996 DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-250 Turkey Point¹3 Oct 08, 1996 J.E.Knorr (305)2466757 Date Type 1 Duration (Hours)Reason 2 Method of Shutting Dovm Reactor LIcensee Event Report¹System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence:

00001022 09/24/96 F A 96-010 INSTRU Shutdovm due to tve dropped rods 00001023 09/24/96 S 0.0 RB INSTRU Repair control cards for two dropped rods 1.F Forced S Scheduled 2.A-Equipment Failure (Explain)B-Maintenance or test C-Refueling D-Regulatory Restriction E-Operator Training LIcense Examination F-Administraitive G-Operational Error (Explain)H-Other (Explain)3.1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4.Exibit G-Instructions for Preparation of Data Entry Sheets LIcensee Event Report (LER)File (NUREG41 61)5.Exibit I-Same Source DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH Unit 3 operated at approximately 100%reactor power until September 23, 1996.On the morning of September 24 two rods were dropped due to a control card failure in the control rod drive cabinet for those rods.Shortly afterward, the unit was taken to Mode 3 to replace the control card.Unit 3 was taken to Mode 2 early in the morning of September 27 and to Mode 1 late that evening.The unit returned to 100%reactor power late in the morning of September 28, 1996 and continued at essentially that power level thru the end of the month.

AVERAGE DAI NIT POWER LEVEL MONTH Se tember, 1996 DOCKET NO.50-251 UNIT Turkey Point N4 DATE Oct 08, 1996 COMPLETED BY J.E.Knorr Tf LEPHONE (305)246-6757 DAY 09/01/96 09/02$6 09/03/96 09/0496 09/05$6 09/06/96 09/07/96 09/08/96 09/09/96 09/10/96 09/11/96 09/12/96 09/13/96 09/14/96 09/1 5/96 09/16/96 09/17/96 09/18/96 09/19/96 09/20$6 09/21/96 09/22/96 09/23/96 09/24$6 09/25/96 09/26/96 09/27/96 09/28/96 09/29/96 09/30/96 AVERAGE DAILY POWER LEVEL (MWe-Net)660 659 656 659 662 660 656 659 660 670 665 663 660 428 405 661 662 660 658 660 660 657 659 661 666 660 668 668 666 666 OPE ING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 60-251 10/08/96 J.E.Knorr (305)2464757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: September, 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION, IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 720.0 720.0 0.0 720.0 0.0 1547341 487947 464431 100.0 100.0 96.9 93.1 0.0 6576.0 5758.2 0.0 6637.6 0.0 12070842 3860362 3671917 86.7 85.7 83.9 80.6 1.4 202664.0 139244.9 166.6 135030.7 577.2 285744099 91381503 86556832 66.7 66.7 64.2 61.7 9.9-YTD-CUMUlATIVE 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH SEPTEMBER 1996 DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-251 Turkey Point¹4 Oct 10, 1996 J.E.Knorr (305)24i6757 Date Type 1 Duration (Hours)Reason 2 Method of Shutting Dovm Reactor IJcensee Event Report¹System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence:

00001021 09/1496 S 0.0 HH VALVEX Repair failed feedwater pump suction relief valve and perform turbine valve testing 1.F Forced S Scheduled 2.A-Equipment Failure (Explain)B-Maintenance or test C-Refueling D-Regulatory Restriction E-Operator Training License Examination F-Administraitive G-Operational Error (Explain)H-Other (Explain)3.1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4.Exibit G-Insbuctions for Preperation of Data Entry Sheets IJcensee Event Report (LER)File (NUREG4161)

Exibit I-Same Source r l'e DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

1 Unit 4 operated at approximately 100%reactor power until September 14, 1996.That morning, power was reduced to 60%power to repair a relief valve on a main feedwater pump suction line and to perform turbine valve testing.Power was returned to 100%reactor power late in the afternoon on September 15.The Unit remained at essentially that power level for the remainder of the month.