ML17354A721

From kanterella
Revision as of 09:14, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
ML17354A721
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1997
From: HOVEY R J, MOWREY C L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-97-284, NUDOCS 9711280305
Download: ML17354A721 (11)


Text

~O~~CATEGORY 1 REGULAT.INFORMATION DISTRIBUTIO

~'YSTEM (RIDS)ACCESSION NBR:9711280305 DOC.DATE: 97/10/31 NOTARIZED:

NO DOCKET N FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250<50-)51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMQi'UTHOR AFFILIATION MOWREY,C.L.

Florida Power 8 Light.Co.HOVEY,R.J.

Florida Power E Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1997 for Turkey Point, Units 3&.4.W/971114 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R.FXLE CENTE 1 O/5B~/P COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I~~I NOY 14 fggp L-97-284 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97ii280305 97i03i PDR ADOCK 05000250 R PDR an FPL Group company llllllllllllllllllllllllllllllllllllllll AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1997 DOCKET NO.50-250 UNIT Turkey Point¹3 DATE Nov 05, 1997 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 10/01/97 10/02/97 10/03/97 10/04/97 10/05/97 10/06/97 10/07/97 10/08/97 10/09/97 10/1 0/97 10/1 1/97 10/1 2/97 10/13/97 10/1 4/97 10/15/97$0/1 6/97 10/1 7/97 10/18/97 10/19/97 10/20/97 10/21/97 10/22/97 10/23/97 10/24/97 10/25/97 10/26/97 10/27/97 10/28/97 10/29/97 10/30/97 10/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)711 712 710 709 711 715 717 717 716 713 715 716 718 719 720 719 714 713 716 722 723 720 719 718 716 711 709 711 715 713 711 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 November 3 1997~C.L.Me wre REPORTING PERIOD October 1997 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)MONTH 745.0 745.0 0.0-YTD-6202.3 6107.8 0.0 532721.0 4204068.0 CUMULATIVE 151653.8 149494.9 121.8 95364274.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH October 1997 50-250 k November 3 1997~L.L.M 305 246-6204 No.Date Type Duration[Hours)Reasons Nethod of Shutting Down Reactor'ause

&Corrective Action Comments N/A E-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance o Test C-Refueling D-Regulatory restriction E-Operator Train).ng 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Nethod 1-Manual 2-Nanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other{Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 UN.'N DATE: November 3 1997 COMPI.E E Y: C.TE H HDNE:: REPORT MONTH October 1997 Unit 3 operated at essentially 100%power for the entire month of October.

AVERAGE DAlLY UNIT POWER LEVEL MONTH October, 1997 DOCKET NO.50-251 UNIT Turkey Point¹4 DATE Nov 05, 1997 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 10/01/97 10/02/97 10/03/97 10I04I97 10/05/97 10/06/97 10/07/97 10/08/97 10/09/97 10/10/97 10/11/97 10/1 2/97 10/13/97 10/14/97 10/15/97 10/1 6/97 10/17/97 10/1 8/97 10/1 9/97 10/20/97 10/21I97 10/22/97 10/23/97 10/24/97 10/25/97 10/26/97 10/27/97 10/28/97 10/29/97 10/30/97 10/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)0 0 0 0 0 0 0 0 0 0 0 0 0 120 210 272 296 571 709 720 720 715 713 716 716 712 708 712 716 715 712 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 November 3 1997~C.L.Mowre REPORTING PERIOD October 1997 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 465.5 434.7 0.0-YTD-6390.5 6346.5 0.0 CUMULATIVE 147843.5 143512.5 577.2 6.Net Electrical Energy (MWH)256243.0 4383922.0 92433000.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY TELEPHONE:

50-251 TkPi N4 November 3 1997 C.L.Mowre 305 246-6204 REPORT MONTH October 1997 Ho.Date Duration (Hours)Reason*Hethod of Shutting Down Reactor'ause

&Corrective Action to Prevent Recurrence 1053 9/8/97 309.0 Refueling outage 1055 10/14/97 1.3 Unit taken offline for turbine overspeed test F-Forced S-Scheduled Reason A-Equipment Failure 8-Naintenance or Test C-Refueling D-Regulatory restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-)4anual 2-Hanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 Turke Point 84 November 3 1997 L.@~6-6 REPORT MONTH October 1997 Unit 4 started the month of October shut down for a refueling which began on September 8, 1997.The unit began operation on October 13.The plant shut down as scheduled the next day for a turbine overspeed test returning to power the same day.The unit reached 100%power on October 18, and remained at full power for the remainder of the month.