Letter Sequence Draft RAI |
---|
|
Results
Other: ML13212A367, ML14050A304, ML14071A620, ML14072A369, ML14092A346, ML14177A430, ML14238A691, ML15098A181, ML15106A736, RS-14-183, Updated Responses to NRC Set 14 Requests for Additional Information, Related License Renewal Application, RS-14-249, Results of Detailed Review Performed in Response to Request 1 of NRC RAI B.2.1.7-7 from Set 17, Related to License Renewal Application
|
MONTHYEARML13212A3672013-08-12012 August 2013 Plan for the Aging Management Program Regulatory Audits Regarding the Byron and Braidwood Nuclear Stations License Renewal Application Review (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML13281A5742013-11-25025 November 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 3 (TAC Nos. MF1879, MF1880, MF1881, and MF1882 Project stage: RAI ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA Project stage: RAI ML13281A5692013-12-12012 December 2013 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and the Braidwood Nuclear Station Units 1 and 2, LRA - Aging Management, Set 4 Project stage: RAI ML13282A3692013-12-13013 December 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 2 (TAC Nos. MF1879, MF1880, MF1881, and MF1882 Project stage: RAI RS-13-273, Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application2013-12-17017 December 2013 Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application Project stage: Response to RAI RS-13-274, Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application2013-12-19019 December 2013 Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application Project stage: Response to RAI ML13317A0752014-01-13013 January 2014 Requests for Additional Information for Review of Byron, Units 1 & 2, and Braidwood, Units 1 & 2, License Renewal Applications, Set 6 Project stage: RAI RS-14-003, Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application2014-01-13013 January 2014 Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application Project stage: Response to RAI ML14007A6582014-01-22022 January 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 9 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML13309A9322014-01-23023 January 2014 Summary of Telephone Conference Call Held on October 31, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braid Project stage: Draft RAI RS-14-030, Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application2014-02-0404 February 2014 Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application Project stage: Response to RAI ML14006A0212014-02-0606 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application- Aging Management, Set 8 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14023A5642014-02-0707 February 2014 RAI for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 13 (TAC MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14030A5962014-02-10010 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 12 (TAC MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14007A6032014-02-18018 February 2014 Request for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, LRA - Aging Management - Set 17 Project stage: RAI ML14035A1892014-02-20020 February 2014 Summary of Telephone Conference Call Held on January 30, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron Station and Braidw Project stage: Draft RAI ML14035A5342014-02-20020 February 2014 January 22, 2014, Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, Llc., Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braidwood Station, License Renewal Applica Project stage: Draft RAI RS-14-051, Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application2014-02-27027 February 2014 Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14063A4952014-03-0404 March 2014 Units 1 & 2, Response to NRC Requests for Additional Information, Set 13, Dated February 7, 2014 Re License Renewal Application Project stage: Response to RAI ML14050A1672014-03-0404 March 2014 Summary of Telephone Conference Call on January 23, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 11, for Byron-Braidwood License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 Project stage: RAI ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA Project stage: RAI ML14051A4312014-03-0404 March 2014 Summary of Telephone Conferene Call Held on January 29, 2014, Between the NRC and Exelon Generating Company, Llc., Concerning RAI Set 10, for the Byron and Braidwood Station License Renewal Application (TAC Nos. MF1879, MF1880, MF1881, and Project stage: RAI ML14051A4282014-03-0606 March 2014 January 13, 2014, Summary of Telephone Conference Call Held Between the NRC and Exelon RAI Set 8, for the Byron and Braidwood Station LRA Project stage: RAI ML14050A0812014-03-0707 March 2014 Correction to Request for Additional Information B.2.1.10-1, Letter Dated February 7, 2014, for the Review of the Byron Station and Braidwood Station, Units 1 and 2, LRA Set 13 Project stage: RAI ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal Project stage: Draft RAI ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal Project stage: Draft RAI ML14064A3912014-03-11011 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 15 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14071A6202014-03-13013 March 2014 Aging Management Programs Audit Report Regarding the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (Tac Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML14072A3692014-03-13013 March 2014 AMP Audit Enclosure (3) Project stage: Other ML14050A3042014-03-14014 March 2014 Scoping and Screening Methodology Audit Report Regarding the Byron Station, and Braidwood Station, Units 1 and 2, LRA Project stage: Other ML14058B1822014-03-18018 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 14 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14051A5032014-03-20020 March 2014 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Set 17 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI RS-14-084, Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application2014-03-28028 March 2014 Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14084A3352014-04-0303 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 16 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14073A7052014-04-0303 April 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the NRC and Exelon, Concerning Drais Pertaining to the Byron and Braidwood Station, LRA Project stage: RAI ML14092A3462014-04-0707 April 2014 Project Manager Change for the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML14092A2612014-04-0707 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 20 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14084A4882014-04-0707 April 2014 03/04/2014 Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron and Braidwood License Renewal Application Set 16 Project stage: Draft RAI ML14094A3662014-04-0808 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 19 Project stage: RAI ML14093B2472014-04-10010 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 18 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14099A4852014-04-17017 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 & 2, and Braidwood Station, Units 1 & 2, License Renewal Application, Set 21, (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14099A4932014-04-22022 April 2014 April 03, 2014 Summary of Telephone Conference Call Held Between NRC and Exelon Generation Co., LLC, Concerning Draft Request for Additional Information, Set 21, Pertaining to Byron, Units 1 & 2, Braidwood, Units 1 & 2, License Renewal Appl Project stage: Draft RAI ML14111A1182014-04-24024 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 22 Project stage: RAI ML14107A0772014-04-25025 April 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 23, Pertaining to the Byron Station & Braid Project stage: Draft RAI ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and Project stage: Draft RAI ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and Project stage: Draft RAI ML14112A4182014-05-14014 May 2014 Summary of Telephone Conference Call Held on April 10, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 22, Pertaining to the Byron Station and Project stage: Draft RAI ML14094A4252014-05-14014 May 2014 Summary of Telephone Conference Call Held on April 1, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 19, Pertaining to the Byron Station and B Project stage: Draft RAI ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2014-03-11
[Table View] |
Summary of Telephone Conference Call Held on April 1, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 19, Pertaining to the Byron Station and BML14094A425 |
Person / Time |
---|
Site: |
Byron, Braidwood |
---|
Issue date: |
05/14/2014 |
---|
From: |
Robinson L R License Renewal Projects Branch 1 |
---|
To: |
|
---|
Robinson L R, 415-4115 |
References |
---|
TAC MF1879, TAC MF1880, TAC MF1881, TAC MF1882 |
Download: ML14094A425 (9) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24164A0182024-06-12012 June 2024 May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24079A2382024-03-19019 March 2024 Summary of March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood Station, Unit 2 ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML21330A0722021-12-0303 December 2021 Summary of November 17, 2021, Meeting with Exelon Generation Company, LLC, Related to a Future License Amendment to Remove License Condition 2.C.(12)(d) for Braidwood Station, Unit 2 ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20171A3812020-08-12012 August 2020 (COVID-19) Presubmittal Meeting Summary - Byron Unit 2 LAR - One-Time Extension of Steam Generator Tube Inspections ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18135A0222018-05-14014 May 2018 Summary of the May 10th, 2018, Public Open House Regarding Braidwood Nuclear Power Station ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing 2024-06-04
[Table view] |
Text
May 14, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2 Braidwood Station, Units 1 and 2
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 1, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION, SET 19, PERTAINING TO THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAC NOS. MF1879, MF1880, MF1881, AND MF1882)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on April 1, 2014, to discuss and clarify the staff's draft request for additional information (DRAI), Set 19, concerning the Byron Station, Units 1 and 2, and the Braidwood Station, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's DRAIs.
provides a listing of the participants, and Enclosure 2 contains a listing of the DRAIs discussed with the applicant, including a brief description on the status of the items. The applicant had an opportunity to comment on this summary.
/RA/ Lindsay Robinson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457
Enclosures:
- 1. List of Participants
- 2. List of Draft Request for Additional Information cc w/encls: Listserv
May 14, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2 Braidwood Station, Units 1 and 2
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 1, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION, SET 19, PERTAINING TO THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAC NOS. MF1879, MF1880, MF1881, AND MF1882) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on April 1, 2014, to discuss and clarify the staff's draft request for additional information (DRAI), Set 19, concerning the Byron Station, Units 1 and 2, and the Braidwood Station, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's DRAIs. provides a listing of the participants, and Enclosure 2 contains a listing of the DRAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary. /RA/ Lindsay Robinson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457
Enclosures:
1. List of Participants 2. List of Draft Request for Additional Information
cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML14094A425 *concurred via email OFFICE LA:DLR* PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds LRobinson YDiazSanabria LRobinson DATE 4/22/14 5/7/14 5/13/14 5/14/14 OFFICIAL RECORD COPY
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 1, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION, SET 19, PERTAINING TO THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION, (TAC NOS. MF1879, MF1880, MF1881, MF1882)
DISTRIBUTION EMAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsOgcMailCenter RidsNrrPMByron Resource RidsNrrPMBraidwood Resource
LRobinson DMcIntyre, OPA EDuncan, RIII JBenjamin, RIII AGarmoe, RIII JMcGhee, RIII JRobbins, RIII VMitlyng, RIII PChandrathil, RIII ENCLOSURE 1 TELEPHONE CONFERENCE CALL BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS April 1, 2014 PARTICIPANTS AFFILIATIONS Lindsay Robinson U.S. Nuclear Regulatory Commission (NRC) Matthew Homiack NRC James Medoff NRC Roger Kalikian NRC Carolyn Fairbanks NRC John Hufnagel Exelon Generating Company, LLC (Exelon)
Don Warfel Exelon Al Fulvio Exelon Albert Piha Exelon Tom Quintenz Exelon Phil O'Donnell Exelon Jim Annett Exelon Gary Becknell Exelon John Hilditch Exelon Ralph Wolen Exelon Don Brindle Exelon ENCLOSURE 2 DRAFT REQUEST FOR ADDITIONAL INFORMATION BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION April 1, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on April 1, 2014, to discuss and clarify the following draft request for additional information (DRAI), Set 19, concerning the Byron Station, Units 1 and 2, and the Braidwood Station, Units 1 and 2, license renewal application (LRA). DRAI 4.2.6-1 Applicability:
Byron Station (Byron) and Braidwood Station (Braidwood), Units 1 and 2
Background:
License renewal application (LRA) Section 4.2.6 describes the time-limited aging analysis (TLAA) for calculation of the low temperature overpressure protection (LTOP) system setpoints.
The LRA states that, in accordance with 10 CFR 54.21(c)(1)(iii), the applicant will use its Reactor Vessel Surveillance Program to establish and report the LTOP system setpoints in order to manage the effects of aging for the period of extended operation (PEO). As described in LRA Section B.2.1.19, the Reactor Vessel Surveillance Program is a condition monitoring program that provides material and dosimetry data for monitoring irradiation embrittlement through the PEO.
Issue: To satisfy the requirements of 10 CFR 54.21(c)(1)(iii), the applicant should describe the processes it will use to ensure that the LTOP system setpoints are updated and reported to the NRC prior to entering the PEO. LRA Section 4.2.6 states that the applicant will use its Reactor Vessel Surveillance Program for this purpose. However, the current licensing basis (CLB) already specifies certain processes that the applicant must use to update the LTOP system setpoints. In particular, Technical Specification (TS) 5.6.6 identifies the analytical methods that the applicant must use for establishing the setpoints, and it also requires the applicant to document the setpoints in a Pressure and Temperature Limits Report (PTLR) and provide the report to the NRC for each reactor vessel fluence period and for any revision or supplement thereto. Since the primary purpose of the Reactor Vessel Surveillance Program is for data collection only, the program does not include the specific analytical methods and processes that must be used to establish, document, and report the new LTOP system setpoints in accordance with TS 5.6.6. Because the Reactor Vessel Surveillance Program does not fully implement the requirements of TS 5.6.6, it is not clear to the staff why the applicant credits this program for the demonstration required by 10 CFR 54.21(c)(1)(iii).
Request:
Explain why the procedures that implement the requirements of TS 5.6.6 will not be used to establish, document, and report the new LTOP system setpoints prior to entering the PEO, in order to satisfy the requirements of 10 CFR 54.21(c)(1)(iii). If any analytical methods or processes outside the requirements of TS 5.6.6 will be used to establish, document, and report the new LTOP system setpoints for the PEO, identify and explain the TS changes or additions that are needed per the requirements of 10 CFR 54.22. Based on this response, revise LRA Sections 4.2.6 and A.4.2.6 accordingly.
Discussion: The applicant requested clarity on the staff's concern. No edits were proposed. This question will be sent as part of the formal request titled: "RAI 4.2.6-1."
DRAI 4.2.4-1/A.4.2.4-1 Applicability:
Byron and Braidwood
Background:
LRA Section 4.2.4 states that the TLAA on the adjusted reference temperature (ART) calculations is acceptable in accordance with the 10 CFR 54.21(c)(1)(ii). LRA Section 4.2.5 states that "the P-T [pressure-temperature] limits for the period of extended operation will be updated prior to expiration of the P-T limits for the current period of operation" and concludes that the TLAA on P-T limits satisfies the requirements of 10 CFR 54.21(c)(1)(iii).
Issue: The methods of analysis in ASME Section XI, Appendix G, as referenced in 10 CFR Part 50, Appendix G, require an analysis of neutron fluence values at the crack tips of flaws that are postulated to initiate at both the inside (i.e., clad-to-base metal) and outside surfaces of the reactor pressure vessel (RPV) and projected to extend from the postulated crack initiation site to a depth one-quarter of the wall thickness. To be consistent with these regulatory requirements, the methodology in WCAP-14040-A, Revision 4 (Reference 4.8.2 in the LRA), as mandated by TS 5.6.6, requires the ART calculations (i.e., nil-ductility reference temperature (RTNDT) calculations) to be performed based on an assessment of both the 1/4T and 3/4T neutron fluence values for the RPV beltline and extended beltline components.
LRA Section 4.2.4 does not include any ART values for RPV beltline and extended beltline components that are based on the 3/4T fluence values for the components at 57 effective full-power years (EFPY).
LRA Section A.4.2.4 states that "57 EFPY 1/4T fluence values were used to compute ART values for Byron and Braidwood beltline and extended beltline materials in accordance with Regulatory Guide 1.99, Revision 2 requirements." This is not consistent with WCAP-14040-A as described above.
Request: 1. Amend LRA Section 4.2.4 to provide the ART tables and values that are based on an assessment of the 3/4T neutron fluences for the RPV beltline and extended beltline components at 57 EFPY. Amend LRA Section A.4.2.4 to state that both the 57 EFPY 1/4T and 3/4T fluence values were used to compute ART values for Byron and Braidwood beltline and extended beltline materials in accordance with WCAP-14040-A requirements, as mandated by TS 5.6.6.
2. Provide a basis for dispositioning the TLAA on the ART in terms of 10 CFR 54.21(c)(1)(ii), given that these values will be factored into the P-T limits for the PEO, which are being dispositioned as 10 CFR 54.21(c)(1)(iii). Otherwise, revise the LRA to disposition the TLAA for projected ART values in terms of 10 CFR 54.21(c)(1)(iii).
Discussion: The applicant requested clarity on the staff's concern. No edits were proposed. This question will be sent as part of the formal request titled: "RAI 4.2.4-1/A.4.2.4-1."
DRAI 4.2.5-1/A.4.2.5-1 Applicability:
Byron and Braidwood
Background:
LRA Section 4.2.5 provides the TLAA on the P-T Limits. LRA Section 4.2.5 states that the TLAA is acceptable in accordance with the requirements of 10 CFR 54.21(c)(1)(iii) because the applicant's PTLR process will be used to generate the P-T limit curves for the PEO.
Generation of the P-T limit curves using the applicant's PTLR process is currently governed by the TS 5.6.6 and the associated plant implementing procedures. The provisions in TS 5.6.6 require the P-T limits to be generated in accordance with the following NRC-approved methodologies:
- Those methodologies referenced in the NRC letter of January 21, 1998, "Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, Acceptance of Referencing Pressure Temperature Limits Report," which include WCAP-14040-A (current NRC approved version, which is Revision 4 of the report; LRA Reference 4.8.2).
- Those methodologies referenced in the NRC letter of August 8, 2001, "Issuance of Exemption from the requirements of 10 CFR 50.60 and Appendix G for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2."
- WCAP-16143-P, "Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Byron/Braidwood Units 1 and 2."
The fracture toughness of reactor vessel materials may decrease with time in the presence of sufficient neutron irradiation. Therefore, NRC regulations require monitoring of reactor vessel material fracture toughness during plant operation. P-T limits define the pressure and temperature operating conditions that must be maintained to ensure adequate margins of safety exist on material fracture toughness.
10 CFR Part 50 Appendix G, "Fracture Toughness Requirements,"Section I, "Introduction and Scope," states the following:
This appendix specifies fracture toughness requirements for ferritic materials of pressure-retaining components of the reactor coolant pressure boundary (RCPB) of light water nuclear power reactors to provide adequate margins of safety during any condition of normal operation, including anticipated operational occurrences and system hydrostatic tests, to which the pressure boundary may be subjected over its service lifetime. Ferritic materials of pressure-retaining components of the RCPB include the following:
(1) Reactor pressure vessel (RPV) forgings (e.g., RPV nozzles and flanges) and their associated structural welds (2) Plates or forgings from which the RPV shells and heads were manufactured and their associated structural welds (3) Ferritic materials in other portions of the RCPB, including those used to fabricate ferritic piping, pumps, valves, and other pressure vessels in the RCPB For LRAs, the regulation in 10 CFR 54.22 requires the LRA to include any TS additions or changes that are necessary to manage the effects of aging during the PEO and the justification for such TS changes or additions to be included in the application.
Issues:
- 1. Licensees must be able to demonstrate that the P-T limits developed for the plant are bounding for all ferritic components in the RCPB, as required by Section I of 10 CFR Part 50, Appendix G. To demonstrate compliance with 10 CFR Part 50, Appendix G, the evaluation of P-T limits considers several factors, including the initial properties and composition of the ferritic materials used to fabricate the RPV components, the accumulated neutron fluence for each component (and hence the neutron embrittlement of the material), and the stress levels applied to the components resulting from operating loads and structural discontinuities. The evaluation of P-T limits that are based solely on an evaluation of ferritic RPV components in the beltline region of the vessel may be insufficient to demonstrate compliance with 10 CFR Part 50, Appendix G. This is because the effects of structural discontinuities for an RPV component with a lower reference temperature (such as a nozzle with a lower neutron fluence) may result in more conservative P-T limits than those that are based on an RPV shell component with a higher reference temperature. Thus, the development of P-T limits for the RPCB must consider not only the RPV beltline shell components with the highest reference temperature but also other RPV components with structural discontinuities, including those that are located outside of the beltline region of the RPV. The applicant has proposed to address the RCPB and RPV discontinuity issue through an enhancement in LRA Sections 4.2.5 and A.4.2.5 that states the following: The analysis for the P-T curves will consider locations outside of the beltline such as nozzles, penetrations and other discontinuities to determine if more restrictive P-T limits are required than would be determined by considering only the reactor vessel beltline materials.
It is not evident to the staff why this issue can be resolved through an enhancement that is defined in LRA Section A.4.2.5. The calculation of the Byron and Braidwood P-T limits is driven by a PTLR process that is mandated by TS 5.6.6 and the PTLR criteria in Generic
Letter (GL)96-031, "Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits," dated January 31, 1996, which dictates that this should be part of the approved methodologies that are referenced in TS 5.6.6.
- 2. The applicant modified its RPV closure flange configuration in 1995 (Braidwood Unit 2) and in 2010 (Byron Unit 2), such that one stud cannot be tensioned. However, the methods of analysis in WCAP-16143-P are based on the original plant design configuration, with all original reactor vessel closure studs fully tensioned. 3. Based on the issues raised in Parts (1) and (2) above, the staff seeks clarification why a change to TS 5.6.6, Part b, or to the methodologies invoked by TSS 5.6.6, Part b, would not need to be processed as part of the LRA, as mandated by 10 CFR 54.22. Requests: 1. Clarify how the assessment of RPV non-beltline structural discontinuities for its impact on future P-T limits will be performed in accordance with 10 CFR 54.21(c)(1)(iii) and how this will be factored into the update of the PTLRs that will be submitted to the NRC in accordance TS 5.6.6, Part c. Explain why the assessment of RPV non-beltline structural discontinuities is proposed as part of an enhancement that is defined in LRA Section A.4.2.5 rather than the NRC policy established in GL 96-03, which would have this type of assessment performed in accordance with 10 CFR Part 50, Appendix G, requirements and included within the scope of at least one of the P-T limit methodologies that are invoked by TS 5.6.6, Part b. 2. Explain why the current TS 5.6.6 required methodologies and the plant procedures for implementing the PTLR process are valid for updating the P-T limit curves that will be generated for the PEO, given that the P-T limits minimum temperature requirement methodology in WCAP-16143-P is not based on the configurations of current RPV closure flange assemblies at Byron, Unit 2 and Braidwood, Unit 2. 3. Based on your responses to Requests (1) and (2) above, explain whether applicable changes to TS 5.6.6 or to the methodologies invoked by TS 5.6.6 need to be proposed for the LRA in accordance with the requirement in 10 CFR 54.22. Amend LRA Sections 4.2.5 and A.4.2.5, accordingly, if it is determined that either TS 5.6.6 or the methodologies invoked by TS 5.6.6 need to be amended in accordance with the 10 CFR 54.22 requirements.
Discussion: The applicant requested clarity on the staff's concern. No edits were proposed. This question will be sent as part of the formal request titled: "RAI 4.2.5-1/A.4.2.5-1." 1 Generic Letter (GL) 96-03, establishes the NRC policy for processing license amendments to move P-T limit and low temperature overpressure protection system setpoint requirements into an owner's report (the PTLR) controlled by the Administrative Controls Section of the TS. The GL also establishes the TS criteria that need to be proposed for the processing of these license amendments, the minimum criteria that should be included in the methodologies for generating the P-T limits and LTOP system setpoint values for the facilities, and the information that should be included in the PTLRs. GL 96-03 may be accessed at: http://www.nrc.gov/reading-rm/doc-collections/gen-comm/gen-letters/1996/gl96003.html.