Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA
ML14036A310
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 03/04/2014
From: Daily J
License Renewal Projects Branch 1
To:
Office of Nuclear Reactor Regulation
Daily J, 415-3873
References
TAC MF1879, TAC MF1880, TAC MF1881, TAC MF1882
Download: ML14036A310 (5)


Text

LICENSEE. Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 28, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC, CONCERNING RAI SET 10, FOR THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAC NOS. MF1879, MF1880, MF1881, AND MF1882)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on January 28, 2014, to discuss six Request for Additional Information (RAI) from Set 10 RAis for the Byron Station (Byron), Units 1 and 2 and the Braidwood Station (Braidwood), Units 1 and 2, license renewal application (LRA) The telephone conference call was useful in clarifying the RAis. provides a listing of the participants and Enclosure 2 contains a summary of the discussion.

The applicant had an opportunity to comment on this summary.

John Daily, Senior Project anager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457

Enclosures:

1 List of Participants

2. Discussion summary cc w/encls: Listserv
  • ML14036A310 OFFICE LA:RPB1 :DLR PM:RPB1 :DLR BC:RPB1 :DLR PM:RPB1:DLR NAME YEdmonds JDaily YDiazSanabria JDaily DATE 2/19/2014 2/24/2014 2/28/2014 3/4/2014 TELEPHONE CONFERENCE CALL BYRON AND BRAIDWOOD STATIONS LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 28, 2014 PARTICIPANTS AFFILIATIONS  :

John Daily Nuclear Regulatory Commission (NRC) I Matt Homiack NRC Seung Min NRC John Hufnagel Exelon Generation Company, LLC (Exelon)

AI Fulvia Exelon Don Warfel Exelon John Kozakowski Exelon Paul Weyhmuller Exelon Phil O'Donnell Exelon Tom Quintenz Exelon Paul Cervenka Exelon Pete Tamburro Exelon Don Brindle Exelon Ralph Wolen Exelon ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL FOR RAI SET 10, FOR THE BYRON AND BRAIDWOOD LICENSE RENEWAL APPLICATION January 28, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on January 28, 2014, to discuss six RAis from Set 10 for the Byron and Braidwood license renewal application (LRA). The telephone conference call was useful in clarifying the RAis.

Discussion The staff and the applicant discussed the following from Set 10. Noteworthy discussion points (beyond general clarifications and minor editorial comments) are included below as applicable.

  • RAI 3.1.1.80-1. The staff clarified that the response should address the outcome of a review of operating experience associated with the reactor coolant system looking for vibration-induced failures of connected ASME Class 2 piping/tubing. No other issues or additional concerns were identified.
  • RAI 3.1.1.81-1. The applicant and staff discussed the physical location of the thermal barrier heat exchanger and that it is an internal, integral part of the reactor coolant pump that is not inspectable without significant disassembly. Also, it was agreed that a reasonable window for review of operating experience associated with component cooling sampling results would be five years.
  • RAI 3.2.1.20-1. The applicant clarified that the feedwater flow venturis for both Byron and Braidwood, while installed and used in the past, are not currently used as normal (preferred) feedwater flow meters because currently ultrasonic flow meters are normal (preferred) feedwater flow meters.
  • RAI 4.7.4-1. In discussing the issue of residual heat removal (RHR) nozzle flaws and associated time-limited aging analysis (TLAA), the applicant stated that several documents already on the docket from Exelon provide additional details of which the staff may or may not be aware. The applicant agreed to provide links to the documentation so the staff could review it for relevance to the RAI.
  • RAI 4. 7.5-1. In discussing reactor coolant pump motor flywheel fatigue crack growth analyses, the applicant and staff discussed potential methods of summarization for the response. It was agreed that the applicant would not need to quantify any crack growth if the most-recent inspections found no evidence of cracking in all 18 of the flywheels.
  • RAI4.7.5-2. The applicant and staff discussed alternate means of uniquely identifying each flywheel; it was agreed that use of the flywheel's component ID, or "serial number,"

would be appropriate since a given flywheel could be relocated to another reactor coolant loop in various scenarios, yet each one is in need of having appropriate identification, inspection frequency (10-year or 20-year cycle), and basis for inspection frequency documented in the updated final safety analysis report (UFSAR). The staff indicated that reference to a properly explicit list or description may be sufficient if adequate details and justification are provided on the docket.

For the RAis discussed on the call, the applicant indicated it understands the RAis and associated concerns and will factor them into the preparations of its responses. The staff agreed as indicated above to review any additional, identified docketed material for applicability and update or revise RAis as appropriate.

ENCLOSURE 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 28, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC, CONCERNING RAI SET 10, FOR THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAG NOS. MF1879, MF1880, MF1881, AND MF1882)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrPMByron Resource RidsNrrPMBraidwood Resource RidsOgcMaiiCenter JDaily LRobinson DMclntyre, OPA EDuncan, Rill JBenjamin, SRI Braidwood Station, Rill AGarmoe, Rl Braidwood Station, Rill JMcGee, SRI Byron Station, Rill JRobbins, Rl Byron Station, Rill VMitlyng, Rill PChandrathil, Rill